ML20214K547

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-104 on 861020-24.No Violations or Deviations Identified
ML20214K547
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/19/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20214K550 List:
References
NUDOCS 8612020342
Download: ML20214K547 (3)


See also: IR 05000424/1986104

Text

Ofh cl&l

0 *

b

\\

t

NOV 191986

Docket No. 50-424

License No. CPPR-108

eorgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-424/86-104

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. L. Troup on October 20-24, 1986. The inspection included a review of activi-

ties authorized for your Vogtle facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of tnis letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ enc 1:

(See page 2)

8612O20342 861119

I

PDR

ADOCK 05000424

gkg

G

PDR

I

1600

. .

y

~,

,

Georgia Power Company

2

.

cc w/ encl:

(d. P. O'Reilly, Senior Vice President

Nuclear Operations

. E. Conway, Senior Vice President &

Project Director

. O. Foster, Vice President, Project

) Support

WP. D. Rice, Vice President, Project

/ Engineering

@. H. Pinson, Vice President, Project

, Construction

f.T.Beckham,VicePresident&

J General Manager - Operations

- \\/R. A. Thomas, Vice President,

Licensing

/D.S. Read,GeneralManager,

/ Quality Assurance

(4. W. Hayes, Vogtle Quality

Assurance Manager

N W. C. Ramsey, Manager -

,

Readiness Review

. B. Bockhold, General Manager,

d.NuclearOperations

Gucwa, Manager, Nuclear Safety

and Licensing

M. H. Googe, Project

Construction Manager

W . D. Groover, Quality

Assurance Site Manager -

Construction

II A. Bailey, Project Licensing

Manager

LG. F. Trowbridge, Esq. , Shaw,

Pittmtn, Potts and Trowbridge

(,8. W. Churchill, Esq. , Shaw,

/ Pittman, Potts and Trowbridge

VE. L. Blake, Jr. , Esq. , Shaw,

j

Pittman, Potts and Trowbridge

,

V J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

. G. Ledbetter, Commissioner,

M[C.H. Badger,OfficeofPlanning

Department of Human Resources

,

/ and Budget

VD Kirkland, III, Counsel,

Office of the Consumer's Utility

/

Council

V D. Feig, Georgians Against

Nuclear Energy

1

(cc w/enci cont'd - see page 3)

'

,

.

'

.i

Georgia Power Company

3

l(cc w/ encl cont'd)

g M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

NDr.O.H. Paris,AdministrativeJudge

Atomic Safety and Licensing Board

, / Panel

w. A. Linenberger, Jr. , Administrative Judge

- Atomic Safety and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

cc w/ encl:

. Reis, OGC

. M. Hill, IE

, Miller, NRR

W. Brach, ED0

M. Sinkule, RII

J E. Christnot, RII

T NRC Resident Inspector

Document Control Desk

State of Georgia

RII

RII

RII,

RII -

t

f/-cn

J

GTr

dg

se

DCollins

MSinkule

111d/q6

11/g /86

11//K/86

11/g/86

,