{{#Wiki_filter:- Ehob (
- .
,
- .
D 19g Docket Nos. 50-424 License Nos. CPPR-108 / Georgia Power Company y ATTN: Mr. J. H. Miller, Jr. President P. O. Box 4545 Atlanta, GA 30302 Gentlemen: SUBJECT: NRC , INSPECTION REPORT N0. 50-424/86-99 This refers to the Nuclear Regulatory Consnission (NRC) inspection conducted by A. R. Long and P. Burnett on October 14-17, 1986. The inspection included a review of activities authorized for your Vogtle facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report. Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representetive records, interviews with personnel, and observation of activities in progress. Within the scope of the inspection, no violations or deviations were identified. Your attention is invited to unresolved item identified in the inspection report. This matter will be pursued during future inspections. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this letter, please contact us. Sincerely, \\S\\ Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure: NRC Inspection Report cc w/ encl: (See page 2) PDR ADOCK 05000424- \\ \\ 8612O20320 861119 \\ G PDR s TEt> I
i ( . t y- Georgia Power Company 2 M 19 BS6 pc w/ encl: VJ. P. O'Reilly, Senior Vice President Nuclear Operations p.E.Conway,SeniorVicePresident& Project Director- vii. O. Foster, Vice President, Project f Support (P. D. Rice, Vice President, Project / Engineering Q.H.Pinson,VicePresident, Project Construction kJ. T. Beckham, Vice President & / General Manager - Operations \\R. A. Thomas, Vice President, ,f Licensing VD. S. Read, General Manager, Quality Assurance M. W. Hayes, Vogtle Quality I Assurance Manager. J. C. Ramsey, Manager - Readiness Review -BA. B. Bockhold, General Manager, / Nuclear Operations f. Gucwa, Manager, Nuclear Safety ,' and Licensing tM. H. Googe, Project Construction Manager NE. D. Groover, Quality Assurance Site Manager - h. Construction A. Bailey, Project Licensing Manager [[G.F.Trowbridge,Esq.,Shaw, I Pittman, Potts and Trowbridge N3. W. Churchill, Esq., Shaw, j Pittman, Potts and Trowbridge yE.L.Blake,Jr.,Esq.,Shaw, i Pittman, Potts and Trowbridge (J.E. Joiner,Troutman, Sanders, ).ockermanandAshmore E. G. Ledbetter, Commissioner, (lDepartmentofHumanResources C. H. Badger, Office of Planning - and Budget \\ D. Kirkland, III, Counsel, Office of the Consumer's Utility Council (cc w/enci cont'd - see page 3)
f .* , -
- w
- Georgia Power Company
3 Wy 19 g c w/ encl cont'd) . Feig, Georgians Against' f Nuclear Energy VM. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board \\,Mr. O. H. Paris, Administrative Judge Panel Atomic Safety and Licensing Board ,/_ Panel W. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board / Panel g. P. Garde, Citizens Clinic, Director Government , Accountability Project bec w/ enc 1: Reis, GS0 . M. Hill, IE Miller, NRR rach, GS0 Sinkule, RII v[fiRC Resident Inspector . Christnot, RII Document Control Desk State of Georgia lI RII RII RI j g E6ng:cdg V8urnett FJap6' erdt MSinkule 11// 7/86 11// 86 11/j7/86 1/ [7/86 11/f/86 I - . . . - - . . . }}