ML20214K403
| ML20214K403 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 05/12/1987 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20214K406 | List: |
| References | |
| NUDOCS 8705280431 | |
| Download: ML20214K403 (2) | |
See also: IR 05000259/1987004
Text
r
h
^
MAY 1 21987
k
Docket Nos. 50-259, 50-260, 50-296
License Nos. DPR-33, DPR-52, DPR-68
Jennessee Valley Authority
/ ATTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-259/87-04,50-260/87-04, AND 50-296/87-04
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
E. H. Girard on January 26-30, 1987.
The inspection included a review of
activities authorized for your Browns Ferry facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection included previously identified enforcement
matters, recirculatfori system piping replacement, program for inservice testing
of pumps and valves, licensee event reports, and inspector followup items.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observation of activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is called to an unresolved item identified in the inspection report
which involves a concern for the lack of timely evaluation, disposition, and
assurance that the material is stored properly.
This matter will be pursued
during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Y
8705280431 870512
Q$
[
[GaryG.Zech,AssistantDirector,
Inspection Programs
Division of TVA Projects
Office of Special Projects
Enclosure:
(Seepage 2)
i\\
r e{
.
. . .
_ ,.
_ . .
. . _
_.
._
-
__.
._.
. - . _ . _
.
k . 6,'.
,
,
~
MAY 1 S 1987
' Tennessee Valley Authority
2
-
.
Enclosure:
NRC Inspection Report
';
y w/ encl:
H. P. Pomrehn, Site Director
,'
/ Browns Ferry Nuclear Plant
!
/R. L. Gridley, Director
j Nuclear Safety and Licensing
^
gJ.A.Kirkebo,ActingDirector,
4
Nuclear Engineering
..J. May, Site Licensing Manager.
tycc w/ encl:
/J., N. Grace, RII
,
/J. G. Keppler, OSP
(
vj.D.Ebneter,OSP
.
j
/J.A.Zwolinski,OSP
!
/ . D. Liaw, OSP
4
. D. Richardson, OSP
i
. E. Gears, OSP
- .
. F. Stang, OSP
f.R.Connelly,0IA
'
sg.P.Barr,OSP/RII
/ NRC Resident Inspector
NRC Document Control Desk
State of Alabama
,
i
i
l,'
!
!
!
i
j
,
t
. .:
65P/RII
W
RII
II
RI
RII$
09d
i
evt
8 c-
-f
g
l
EGirard:es
J 1ey
Blake
AHerdt
Algnatonis
&
3 /b/N
{
2//f/87 ,
2//&/87
2//J/87
2/gA/87
2/05/87
/
l
i
!
I
'
- -
,
-.
_ . _ _ , - . _ . _ _ ,
, _ . .
,
-
.
.
-