Monthly Operating Rept for Jul 1986
ML20214K313
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/31/1986
From: Hukill H, Smyth C
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
5211-86-2137, NUDOCS 8608210028
Download: ML20214K313 (6)


Text

  • '

j.,

~.

[h t

]

>*D, f

-OPERATING DATA REPORT-

[7 DOCKET NO.

550-289 g

'DATE 17/31/B6

-COMPLETED BY C.W. Smyth g_

TELEPHONE (717)-948-8551-p OPERATING STATUS

! NOTES 51.' UNIT' NAMES-THREE MILE ISLAND UNIT 1

~2.

REPORTING PERIOD:

JULY

,1986.-

,3.1 LICENSED THERMAL POWER (MWT) :

'2535.-

E.

N'

4. NAMEPLATE RATING (GROSS MWE) :

871.

5. ' DESIGN ELECTRICAL RATING (NET MWE) :

819.

~

i6. MAXIMUM DEPENDABLE CA*.;ITY (GROSS MWE) :

824.

7. - MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

776'.

-8' IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL-TO WHICH RESTRICTED, IF-ANY (NET MWE)

'10.~ REASONS FOR RESTRICTIONS, 'IF ANY:

~~

THIS MONTH YR-TO-DATE CUMMULATIVE' '

11. HOURS IN REPORTING PERIOD 744.

5087.

104424~.

I12.: NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4061.7 37878.3

^13. REACTOR' RESERVE SHUTDOWN HOURS 0.' O 990.8

'1874.1-

14. HOURS GENERATOR ON-LINE 744.0 4005.6

-37039.5

15.-UNIT RESERVE; SHUTDOWN HOURS 0.0 0.0

'0.0 16.' GROSS THERMAL ENERGY GENERATED (MWH) 1879956.

10012439.

89362835.

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 608815.

3302856.

29695009.

18.. NET ELECTRICAL ENERGY GENERATED (MWH) 574180.

3098185.

27749897.

19. UNIT SERVICE FACTOR 100.0 78.7 35.5 20.' UNIT AVAILABILITY FACTOR 100.0 78.7

~35.5

21. UNIT CAPACITY FACTOR (USING MDC NET) 99.5 78.5 34.0
22. UNIT CAPACITY FACTOR (USING DER NET) 94.2 74.4 32.4~
23. UNIT FORCED OUTAGE RATE 0.0 6.0 61.5-
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION'OF EACH Refueling Outage, November 1, 1986 - 4 to 5 months
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8608210020 860731 PDR ADOCK 05000289

AVERAGE DAILI UNIT POWER LEVEL

=

DOCKET NO..

50-289-UNIT TMI-1.

DATE, 7/31/86-COMPLETED BY C.W. Smyth TELEPHONE (717) 948-8551 MONTH:

JULY i

DAY AVERAGE DAILY POWER-LEVEL DAY AVERAGE DAILY POWER LEVEL

.(MWE-NET)

(MWE-NET) 4 1

782.-

~17:

775.

2 771.

18 766.

1 3

781.

19 765..

14 781.

20

.768.

5 773.21-772.

6 767.

22 774.

7 764.

23 768..

8 768.

24 770.

9 769.

25 768.

10 778.

26 763.

11 781.

27 768.

12 775.-

28 769.:

}

13

' 76 6. -

29 768..

14 771.

30

773.

15 779.

31 774.

16

-.779.

4 i*

1

'f e

i e

i I

l i

l l

1

s.

50-289 DOCKET NO.

UNil SilUTDOWNS AND POWER REDUCTIONS UNIT NAME TMI-I DATE 7/31/86 COMPLETED BY C.W. Smyth REPORT MONTH Jfff Y TELEPHONE (7171 948-8551 e

e

_! E

'h h5 Licensee 5*

Cause & Corrective Na.

Date i

5?

4 255 Even 3?

a3 Action to

$E 5

~ 5 :!

Report 8 N0 irevent Recurrence

~

e u

6 i

1 a

- NO SHUTDOW.; -

l

.I l

1 2

3 4

F Forsed Reasim; Method:

Exhibit G - Instructions S: Siheduled A Fquipment Failure (Explain)

6. Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 1 Autonutie Scram.

Event Report (LER) File INinREG.

D-Regulatory Restriction 4.Other Iliptaml 0161) t-Operator Training & l scenw ITamination F.Adnunist rative 5

Esinbit I - Same Source G Operasjosul lia rni Iliptam)

Il-Other IEsplain) 6 Actually used Exhibits F & 11 NUREG 0161 3

REFUEL.ING-INFORMATION REQUEST 1.

Name of Facility: Three Mile Island Nuclear Station, Unit 1 2.

Scheduled date for next refueling shutdown:

November 1,1986 3.

Scheduled date for restart following refueling:

March 20, 1987 4.

Will refuelf ng or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If answer is yes, in general, what will these be?

Conversion to 18 month fuel cycle with associated changes to Power Imbalance, Quadrant Tilt and Rod Insertion Limits.

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

No If no such review has taken place, when is it scheduled?

To be determined.

5.

Scheduled date(s) for submitting proposed licensing action and supporting i nformation:

November, 1986 6.

Important licensing considerations associated with refueling, e.g. 'new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None 7.

The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool:

(a) 177 (b) 208 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The present licensed capacity is 752. There are no planned increases at this time.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming che present licensed capacity:

1991 is the last refueling discharge which allows full core off-load capacity (177 fuel assemblies).

GPU Nuclear Corporation Nuclear

, oms:reo Middletown, Pennsylvania 17o57 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

August 14, 1986 5211-86-2137 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report July, 1986 Enclosed please find two (2) copies of the July,1986 Monthly Operating Report for Three Mile Island Nuclear Station, Unit-1.

Sincerely,

/

f HJ' D.

u'ill Vice President & Director, TMI-1 HDH:DVH:spb cc: Dr. T. E. Murley Attachments 0015C GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

((DY

  • //

OPERATIONS

SUMMARY

JULY, 1986 The unit entered the month of July at 100% power producing approximately 828 MWe gross electrical generation.

RC-P-1C.(reactor coolant pump) experienced an upward trend in #1 seal leakoff flowrate. This increased flowrate is continuously monitored by plant personnel and is presently acceptable. GPUN is following guidance provided by Westinghouse based on similar experience.

A riverwater Fire Service Diesel Pump (FS-P-3), its controls and the building itself sustained damage as a result of an inadvertent main transformer deluge actuation combined with a discharge check valve failure. The fire service diesel sump was pressurized by reverse water flow. The reverse flow produced a piston effect blowing an access manway through the building roof. The fire service pump has been restored to service following repairs.

At the close of this reporting period TMI-1 continues to operate at 100%

power.

RC-P-1C #1 seal leakoff flowrate is being monitored for adverse trends and continues to remain acceptable.

MAJOR SAFETY RELATED MAINTENANCE During the month of July, TMI-1 performed no major maintenance items on safety related equipment.

!