Text
,
,
a
i
MAY 19 WT
'
.
Docket / License:
50-213/DPR-61
Connecticut Yankee Atomic Power Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut' 06101
Gentlemen:
Subject:
Resident Inspection 50-213/87-08
This transmits the findings of the routine NRC inspection of the Haddam Neck Plant
on March 19 through May 5, 1987.
These findings have been discussed with Mr.
D. Miller of your staff.
This inspection identified a potential for exceeding the maximum allowable reactor
vessel cooldown rate during the last operating cycle.
This situation existed be-
cause plant procedures were not revised to include new license commitments.
Other
recent examples of inadequate implementation of license commitments include fire
protection requirements, a 3-loop operation prohibition and low temperature over-
pressure protection system isolation valve commitments. We are concerned that your
actions to date may not have identified other license commitments that have not
ueen properly implemented.
Consequently, you are requested to reply to this matter
including your intended actions to identify other commitments which may not have
been properly implemented and measures to assure implementation of all future
license commitments.
!
Your cooperation with us is appreciated.
Sincerely,
Original Signed Bya
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Report 50-213/87-08
l
8705280301 870519
ADOCK 05000213
G
t\\
,
l
/
b
,
'
.-
-- - .
.
. _ _
- , _ .
__
__
.
, , , _ .
- - - - - -
_.
_ _ _ -
- - . _ ,
.
.
_
_
. . . .
.
.
_-
,
.
,
- ..
MAY 19 IllgF
Connecticut Yankee Atomic Power Company 2
.
cc w/ encl:
D. B. Miller, Station Superintendent
D. 0. Nordquist, Manager of Quality Assurance
.
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Romberg, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.
NRC Resident Inspector
[
State of Connecticut
bec w/ encl:
Region I Docket Room
Management Assistant, DRMA
DRP Section Chief
,
M. McBride, SRI, Pilgrim
J. Shedlosky, SRI, Millstone 3
T. Rebelowski, SRI, Millstone 1&2
F. Akstulewicz, LPM, NRR
R. Bores, DRSS
W. Lazarus, DRSS
1
!
-
RI:DRP
RI:DRP
RI DRP
R
E SV-
@6
Asars/meo
Swetland
McCabe
Wen inger
5/ /87^
gh$
gh$
[ /Q f
0FFICIAL RECORD COPY
!
T
,. ,
y,
,-.
,,.m..-,_y---
y..,,
e
,,,
v. w
- , - , - . , . , . - - ,
_-m~.2
-_c,---,_
- - - , _ _ _ . - , , . , ~ , - , . < -
. - - , - ~ , -
- - - - -
-
-