ML20214K044

From kanterella
Jump to navigation Jump to search
Forwards Resident Insp Rept 50-213/87-08 on 870319-0505.No Violations Noted.Requests Reply to Inadequate Implementation of License Commitments Noted,Including Exceeding Max Allowable Reactor Vessel Cooldown Rate
ML20214K044
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/19/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20214K045 List:
References
NUDOCS 8705280301
Download: ML20214K044 (2)


See also: IR 05000213/1987008

Text

,

,

a

i

MAY 19 WT l

'

.

Docket / License: 50-213/DPR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut' 06101

Gentlemen:

Subject: Resident Inspection 50-213/87-08

This transmits the findings of the routine NRC inspection of the Haddam Neck Plant

on March 19 through May 5, 1987. These findings have been discussed with Mr.

D. Miller of your staff.

This inspection identified a potential for exceeding the maximum allowable reactor

vessel cooldown rate during the last operating cycle. This situation existed be-

cause plant procedures were not revised to include new license commitments. Other

recent examples of inadequate implementation of license commitments include fire

protection requirements, a 3-loop operation prohibition and low temperature over-

pressure protection system isolation valve commitments. We are concerned that your

actions to date may not have identified other license commitments that have not

ueen properly implemented. Consequently, you are requested to reply to this matter

including your intended actions to identify other commitments which may not have

been properly implemented and measures to assure implementation of all future

license commitments.  !

Your cooperation with us is appreciated.

Sincerely,

Original Signed Bya

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Report 50-213/87-08

l

8705280301 870519

PDR ADOCK 05000213

G PDR

,

t\

l /

, b

'

.

. _ _ - , _ . __ __ , , , _ . - - - - - - _. _ _ _ - - - . _ ,

. _ _ . . . . . . _-

,

. ,

..

MAY 19 IllgF

Connecticut Yankee Atomic Power Company 2

.

cc w/ encl:

D. B. Miller, Station Superintendent

D. 0. Nordquist, Manager of Quality Assurance

.

R. M. Kacich, Manager, Generation Facilities Licensing

W. D. Romberg, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

. NRC Resident Inspector

[ State of Connecticut

bec w/ encl:

Region I Docket Room

Management Assistant, DRMA

, DRP Section Chief

M. McBride, SRI, Pilgrim

J. Shedlosky, SRI, Millstone 3

T. Rebelowski, SRI, Millstone 1&2

F. Akstulewicz, LPM, NRR

R. Bores, DRSS

W. Lazarus, DRSS

1

!

-

RI:DRP RI:DRP RI DRP R

E SV-

Asars/meo

@6

Swetland McCabe Wen inger

5/ /87^ gh$ gh$ [ /Q f

0FFICIAL RECORD COPY

!

T

,. ,-

y, ,-. ,,.m..-,_y--- y..,, e ,,, v. w - , - , - . , . , . - - , _-m~.2 -_c,---,_ -

- - - , _ _ _ . - , , . , ~ , - , . < - . - - , - ~ , - - - - - -