DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE A/gfag COMPLauu M n R_
PRATTP TELEPE NE 21a/g7s_aasn PART A OPERATIONS
SUMMARY
Plant operated at 100% power with the following exceptions:
Date Duration Reason
)
5/18/86 189 hrs.
Repair leak on "C" S/G Feedwater Check Valve.
5/30/86 11 hrs.
Investigate / repair hot spot on isophase bus duct.
Reo'unlification training for Licensed Operators is currently in progress.
PART B PORV AND SAPETY VALVE
SUMMARY
None l
l CA-#804 8150294Oh53 04/10/85 ADOCK O O 483 DR QDP-ZZ-04204 R
Page 1 of 4 7
=-
=
- = = =
2.
.a Part C AVERAGE DALLY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DiTE 6/6/86 COMPLETED BY D. B. PRATTE TELEPHONE 314/676-8460 MONTH MAY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
'726 1109 gy 1101 27 2
3, 1114 0
3 3,
1109 0
4 28 1105 O
5 21 0
e 1103 g
0 y
1103 g
1101 0
S 24 1101 0
g g
977 0
10 28 538 l
11 996 27 1050 1077 g
12 1100 1071 12 29 1107 439 34 g
1103 324 ig y
18 1090 Page 2 of 4 CA-#804 04/10/85 QDP-ZZ-04204 i
r Part D
' OPERATING DATA REPORT 50-483 COCKET NO.
UNIT DATE 6/6/86 D. B. PRATTE COMPLETED BY 314/676-8460 TELEPHONE OPERATING STATUS
( YTD CUM' )
744 3623 12685.5 May 1986 Gross wouRS iN REpoRTiNa pERico:
- 1. REPORTING PERIOD:
3411 MAX. OEPENO. CAPActTY (MWe Nul.
II?O
- 2. CumpfNTLY AUTHORIZED POWER LEVEL (MWD-DESIGN ELECTRICAL RATING (MWo. Net): 11/1*
- At stretch power level which is not currently authorized under th erating License.
- 3. POWER LEVELTOWHICH litESTR ttP ANYl(MWo.Neti:
1007
- 4. REASONS FOR RESTRICTION llP ANY):
THIS MONTH YR TO DATE CUMULATIVE 566 R 7117.Q 1ngni a
- s. NuMSER OF MuRS REACTOR WAS CRmCAL 0
0 0
- s. REACTom RESERVE ShuTooWN hours 544.0 2231.4 10418.8
- 7. HOURS GENERATOR ON LINE 0
0 0
S. uNef RESERVE SHUTDOWN pour $
S. Gross THERMAL ENERoy GENERATED IMWHI
... 1s678.?ll, 6. 791.090 3hA10.642
.546,059 2,297,253 11,111,196 l
io. oRoS$ ELECTRICAL ENERGY GENERATED (MWMt.............
............. 517,736 2,179,382 10,548.169
- 11. NET ELECTRICAL ENERGY GENERATED IMWN) 76.2%
64.5%
A s.17
- 12. REACTOR SERVICE rcToR '.................
76.2%
64.5%
8 5.1 %'
- 13. REACTOR AV AI LAtlWTY P ACTOR.....................
73.1%
61.6%
R 2.1 T
- 14. uMIT SERVICE P ACTOR.............................,
73.1%,
61.6%
82.1%
ts. uNif AvAiLAes uTV PACroR..........................
62.1%
53.7%
74.2%
ts. uNir CAPACITY PACToM suung McC 59.4%
- 51. 4*Z 71.07
- 17..uMIT CAPACITY P ACTOR tu% Domen MWel.........,.......
26.9?
R.RT A_7T to. uNet poRCEc ouTAoE RATE.....................
- 13. SM9TDOWNS SCHEDULED OVER NEXT R MONTHS (TYPE. DATE. AMO OuRATION OF EACMI:
- 20. :P SMUT DOWN AT EMQ LP REPORT PERT 00. ESTIMATED DATE OF STARTUP:
CA-f804 l
Page 3 of 4 l
04/10/85 QDP-ZZ-04204
..0
?
.l
.l p
t, l<
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ' Callaway DATE 6/6/86 COMPT 1TED BY D. B. PRATTE i
l)
REPORT MON 11i MAY 1986 TELEPHONE 314/676-8460 o
METHOD OF TYPE MeU1 TING DOWN I
F: FORCED DURATION THE REACTOR OR l
I NO.
DATE S: SCHEDULED IHOURSI REASON REDUCNIG POWER CORREdlVE ACTIONSMXIMMENTS 9.
5/18/8f1 F
189 A
1 Repair leak on "C" S/G Feedwater I
Check Valve, j>
i; 10.
5/30/8(:
F 11 A
1 Hot spot on isophase bus duct.
[
t l.'
i:
i-t-
c I
il i.
- 1
SUMMARY
o REASON BETMOD h
A: EQUlfteENT FAILUBE(EXFLA400 3: IIAIRIAL j
e a: teaceff.OR TEST 3: BSAIGUAL SCRAtt i
C: REFUEUseG 3: Alfl0084T8CSCRAli i
i: oo
- ' y D
- REGULATORY. RESTRICT 8000 4: OFIE R (EEWLA800 l
e i e*
E: OPERATOR TRA8MIIGC ASID L8CEleSE ntIIO4AT9000 l
dyR*E ij I co F: ADASSINTRAT9WE E.
S" G: OPERATeopIAL ERROR (ERFLAIN) 1 l
[!5 y M. OtlIER (EXPLA310 v
q Page 4 of 4 l'
E
~~
r UNION Etscraic a
CMaway Frant June 9, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1326 Pear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1986 The enclosed Monthly Operating Report for May 1986 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
G. L. Randolph Manager, Callaway Plant U D W d6P ?>/drs MET /RDA/JED/DBP Enclosure cc: Distribution attached
~d
\\
\\
Mak1g Actitest PO Bax 62Q Futten MO 65251
e f-cc distribution for ULNRC-1326 with enclosures Mr. W. F. Forney, Chief Project Section 1A U. S. Nuclear Regulatory Commission Region _III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 r