ML20214J951
| ML20214J951 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/22/1987 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8705280263 | |
| Download: ML20214J951 (3) | |
Text
"'
MAY S 21907 In Reply Refer To:
Dockets: 50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
This refers to the meeting conducted in the NRC Region IV office on May 1, 1987. This meeting related to activities authorized by NRC Licenses DPR-51 and NPF-6 for Arkansas Nuclear One (AN0), and was attended by those indicated in the enclosure.
This meeting was to discuss communication between the Arkansas Power & Light Company and the Nuclear Regulatory Comission on regulatory matters.
It is our opinion that this meeting was beneficial.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely.
Origin:1 slan:d By E. H. Johe tan E. H. Johnson, Director Division of Reactor Safety and Projects
Enclosure:
As stated cc w/ enclosure:
J. M. Levine Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec:
(seenextpage)'
C: RPG l('.
D:DRSP Pt C:
MMu phy s Di er JGagl afsto
'j5/4/87
,p EJohnson 5/p/ /87 5/g\\/87 5/q/07[
0700200263 070522 dg ADOCKOD00g13
\\
F)DR
Arkansas Power & Light Company bcctoDMB(IE45) bec distrib. by RIV:
RPB RRI R. D. Martin, RA RPSB SectionChief(RPB/B)
D. Weiss, RM/ALF RIV DRSP RSB MIS System RSTS Operator Project Inspector, RPB R. Hall G. Dick, NRR
Enclosure Attendees Management Meeting May 1, 1987 i
AP&L/NRC Name Affiliation / Title G. Campbell AP&L/Vice President, Nuclear Operations J. Levine AP&L/ Executive Director, ANO Site Operations E. Johnson NRC/ Director Division of Reactor Safety and Projects R. llall t'RC/ Deputy Director Division of Reactor Safety and Projects J. Partlow NRC/ Director Division of Reactor Inspection and Safety i
T. 14artin NRC/ifeadquarters L. Callan NRC/ Headquarters G. Dick NRC/ Project Manager NRR D. Hunter NRC/Section Chief Project Section C W. Johnson NRC/ Senior Resident Inspector
{
l l
-