|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review ML20153F9601988-05-0404 May 1988 Informs That Ray Ready to Stand Before Oral Certification Board Scheduled to Be Held in Region III Ofcs on 880531. Board Will Consist of Listed Individuals & Author ML20151B7961988-04-0505 April 1988 Forwards Facility Master Activities Plan (Map) & Map List of Activities for Apr-June 1988 ML20149F7971988-02-11011 February 1988 Discusses Evaluation of motor-operated Valves,Including Overall Industry Effort to Respond to EDO Request to NUMARC Consisting of Recommendations in AEOD Rept C603.Findings, Conclusions &/Or Recommendations Will Be Provided ML20236J1081987-11-0303 November 1987 Notification of 871109-10 Meetings W/Util in Bethesda,Md to Discuss Tech Spec Amend Package ML20235R6291987-10-0101 October 1987 Notification of 871007-08 Meetings W/Mark III Containment Hydrogen Control Owners Group (Hcog) in Bethesda,Md to Discuss Hcog Submittals Including Impact of Station Blackout & ATWS Considerations on Hcog Programs.Attendee List Encl ML20237L3341987-08-26026 August 1987 Requests Review of Plant Specific & STS with Respect to Allowable Number of Safety Relief Valves Out of Svc at Bwrs. Related Matl Encl ML20206E3131987-04-0808 April 1987 Forwards Draft Attachment 1 to Facility Full Power License. Item 1 Only Deferred Test Remaining from Preoperational Test Program,Item 2 Identical to Item 2a of Low Power License & Item 2 Rewritten for Clarity ML20205N0311987-03-26026 March 1987 Forwards Records of Coordination from Util That Provide Requested Clarification & Corrections Re Util 870303 Tech Spec Change Request Concerning Trip Setpoint & MSIV Leakage Control Sys ML20210B0471987-02-0202 February 1987 Provides Info Re Preparedness of Facility to Exceed 5% Power.Progress Toward Initial Criticality Proceeding Slower than Expected.Activities Required to Be Completed Prior to Exceeding 5% Power Will Be Completed During Mar 1987 ML20212J1871987-01-16016 January 1987 Forwards Updated Plant Licensing Status for Facilities.Info Current as of 870116 ML20207Q1141987-01-15015 January 1987 Notification of 870123 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md to Discuss Emergency Procedure Guidelines & CLASIX-3 Computer Code Validation.Meeting Originally Scheduled for 870127 1999-07-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review ML20153F9601988-05-0404 May 1988 Informs That Ray Ready to Stand Before Oral Certification Board Scheduled to Be Held in Region III Ofcs on 880531. Board Will Consist of Listed Individuals & Author ML20151B7961988-04-0505 April 1988 Forwards Facility Master Activities Plan (Map) & Map List of Activities for Apr-June 1988 ML20149F7971988-02-11011 February 1988 Discusses Evaluation of motor-operated Valves,Including Overall Industry Effort to Respond to EDO Request to NUMARC Consisting of Recommendations in AEOD Rept C603.Findings, Conclusions &/Or Recommendations Will Be Provided ML20236J1081987-11-0303 November 1987 Notification of 871109-10 Meetings W/Util in Bethesda,Md to Discuss Tech Spec Amend Package ML20235R6291987-10-0101 October 1987 Notification of 871007-08 Meetings W/Mark III Containment Hydrogen Control Owners Group (Hcog) in Bethesda,Md to Discuss Hcog Submittals Including Impact of Station Blackout & ATWS Considerations on Hcog Programs.Attendee List Encl ML20237L3341987-08-26026 August 1987 Requests Review of Plant Specific & STS with Respect to Allowable Number of Safety Relief Valves Out of Svc at Bwrs. Related Matl Encl ML20206S3461987-04-17017 April 1987 Staff Requirements Memo Re Commission 870410 Discussion & Possible Vote in Washington,Dc on Readiness of Util to Receive Full Power Ol.Commission Approved Issuance of License.Slow & Cautious Approach to Full Power Urged ML20206E3131987-04-0808 April 1987 Forwards Draft Attachment 1 to Facility Full Power License. Item 1 Only Deferred Test Remaining from Preoperational Test Program,Item 2 Identical to Item 2a of Low Power License & Item 2 Rewritten for Clarity ML20205N0311987-03-26026 March 1987 Forwards Records of Coordination from Util That Provide Requested Clarification & Corrections Re Util 870303 Tech Spec Change Request Concerning Trip Setpoint & MSIV Leakage Control Sys ML20210B0471987-02-0202 February 1987 Provides Info Re Preparedness of Facility to Exceed 5% Power.Progress Toward Initial Criticality Proceeding Slower than Expected.Activities Required to Be Completed Prior to Exceeding 5% Power Will Be Completed During Mar 1987 ML20212J1871987-01-16016 January 1987 Forwards Updated Plant Licensing Status for Facilities.Info Current as of 870116 1999-07-08
[Table view] |
Text
r _
November 24, 1986 Docket No. 50-461' MEMORANDUM FOR: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing FROM: _B. Siegel, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
FORTHCOMING MEETING WITH ILLIN0IS POWER COMPANY RELATED TO THE STAFF'S REVIEW 0F THE CLINTON IST PROGRAM DATE & TIME: December 9, 1986 December 10, 1986 9:00 a.m. to 4:00 p.m. 9:00 a.m. to 4:00 p.m.
LOCATION: Maryland National Bank Building Phillips Building Room 6110 P-114 Bethesda, Maryland Bethesda, Maryland PURPOSE: To discuss IP's responses to staff comments and questions on the Inservice Test Program submitted by IP in February 1985 f,or Clinton Power Station.
PARTICIPANTS *: NRC EG&G Idaho E B. Siegel C. Ranson, et al F. Spangenberg, et al H. Shaw Oddpat signes ny B. Siegel, Project Manager BWR Project Directorate No. 4 l Division of BWR Licensing i
i cc: See next page
- Meetings between NRC technical staff and applicarts for licenses are open for t
interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",
43 Federal Register 28058,6/28/78.
PD#4/P PD#4/D BSie : WButler 0
// /2f/8 g /p(/86 i
l 3 -
8612010410 GOOPDR 61
?DR ADOCK P
4 Mr. Frank A. Spangenbe"; Clinton Power Station Illinois Power Company Unit 1 cc:
Mark Jason .
Assistant Attorney. General Public Utilities Division Office of the Attorney General State of Illinois Center Richard B. Hubbard 100 West Randolph Street - 12th Floor Vice President Chicago, Illinois 60601 Technical Associates 1723 Hamilton Avenue - Suite K Mr. D. P. Hall San Jose, California 95125 Vice President Clinton Power Station Chairman of DeWitt County P. O. Box 673 c/o County Clerk's Office Clinton, Illinois, 61727 DeWitt County Courthouse Clinton, Illinois 61727 Mr. John Greene Manager-Nuclear Station Engineering Dpt. Director, Criteria & Standards (ANR-460)
Clinton Power Station Office of Radiation Programs P. O. Box 678 U. S. Environmental Protection Agency Clinton, Illinois 61727 Washington, DC 70460 Sheldon Zabel, Esquire EIS Review Coordinator Schiff, Hardin & Waite Environmental Protection Agency 7200 Sears Tower Region V 233 Wacker Drive 230 S. Dearborn Street Chicago, Illinois 60606 Chicago, Illinois 60604 Resident Inspector Director, Eastern Environmental U. S. Nuclear Regulatory Commission Radiation Facility j
RR 3, Box 229 A U. S. Environmental Protection Agency Clinton, Illinois 61727 P. O. Box 3009 Montgomery, Alabama 36193 Mr. R. C. Heider i Project Manager Illinois Department of Nuclear Safety Sargent & Lundy Engineers Division of Engineering 55 East Monroe Street 1035 Outer Park Drive, 5th Floor Chicago, Illinois 60603 Springfield, Illinois 62704 Mr. L. Larson Project Manager General Electric Company 175 Curtner Avenue, N/C 395 San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
~
Meeting Notices Internal NRC Participants LDocket: File -
.NRC PDR B. Siegel Local PDR -
H. Shaw ORAS PD#4 Reading HDenton/RVollmer RBernero/RHouston WButler EAdensam JZwolinski bec: Applicant & Service List Glainas DMuller ACRS-10 OGC, Attorney Pirfo (Bethesda)
JPartlow BGrimes EJordan PPAS/TOSB OPA Receptionist (OnlyifmeetingisheldinBethesda)
Project Manager B. Siegel M0'Brien Region III