Responds to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Schedule for Implementation of Action Items b-d Will Be Provided by 860912
ML20214H285
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/13/1986
From: Conway R
GEORGIA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-905, IEB-85-003, IEB-85-3, NUDOCS 8608130070
Download: ML20214H285 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _.

Georg a Power Comp ny 333 Piedmont Annue ettnta. Georgia 30308

%ephone 404 526 6724 c on 4545 b

Atlanta, Geo'g a 30302 e

ygy SSt(sh

$kr v$c"eSEes,oent h([/ "*"'#* ***

April 13, 1946 -'l/fgG f AG0/BG-os United States Nuclear Regulatory Commission

Reference:

Region II RII: JNG:

_ Suite 2900 50-424 101 Marietta Street, Northwest 50-425 Atlantae Georgia 30323 File: X7BC24 Log:

GN-905 Attention: Mr. J. Nelson Grace he following information is submitted in response to I&E Bulletin 85-03, ")iotor-Operated Valve Common Mode Failures During Plant Transients Due_.lo-Ifnproper Switch Settings:"

Georgia Power Company is currently developing a program to ensure that valve operator switches are selected, set, and maintained in accor-dance with the design basis for the operation of each valve.

At this point, Georgia Power Company has identified the motor-operated valves in the high pressure coolant injection, core spray, and emergency feed-water systems that are required to be tested for operational readiness in accordance with 10 CFR 50.55a(g).

The Vogtle Project architect-engineer, Bechtel Power Corporation, has been requested to provide the necessary design information to complete action item "a" of the bulletin.

Upon receipt of this information, a schedule will be developed for imple-mentation of action items "b"

through "d"

of the bulletin.

Georgia Power Company expects to provide the USNRC with this schedule by September 12, 1986.

This response contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly, MM, R. E. Conway REF/D0F/tdm neu88a n8mr G

/

/,

i Page Two R. E. Conway states that he is the Senior Vice President, Project Director of the Vogtle Project and is authorized to execute this oath on behalf of Georgia Power Company and that to the best of his knowledge and belief the facts set forth in this letter are true.

GPC:

f3u.A /

A.

~

Sworn to and subscribed before me this &

day of May, 1986.

cvA b

V V

My Commission (xpires 4/11/88 xc:

U. S. Nuclear Regulatory Commission u

Document Control Desk Washington, D. C.

20555 J. H. Miller P. R. Bemis W. T. Nickerson G. F. Head J. A. Bailey D. S. Read J. T. Beckham

0. Batum Sr. Resident (NRC)

R. E. Conway G. Bockhold D. L. Kinnsch (BPC)

J. P. O'Reilly C. E. Belflower F. B. Marsh (BPC)

R. H. Pinson H. H. Gregory C. S. McCall (0PC)

P. D. Rice E. D. Groover D. A. Bartol (W)

B. M. Guthrie L. T. Gucwa J. E. Joiner D. E. Dutton C. W. Hayes

~ (Troutman, et. al.)

R. A. Thomas G. A. McCarley D. C. Teper (GANE)

D. R. Altman R. W. McManus NORMS

,