309 Weld Rod Used to Weld 316 Stainless Pipe at Sequoyah, Employee Response Team Investigation Rept
ML20214H004
Person / Time
Site: 05000000, Sequoyah
Issue date: 08/22/1985
From: Kemp W
QUALITY TECHNOLOGY CO.
To:
Shared Package
ML082840729 List:
References
XX-85-013-001, XX-85-13-1, NUDOCS 8605290645
Download: ML20214H004 (18)


Text

(

(

L C2,

ERT INVESTIGATION REPORT PAGE 1 OF 3

i CONCERN NO:

XX-85-013-001

/}

CONCERN:

309 weld rod was used to weld 316 stainless pipe at f

Sequoyah.

by 0

INVESTIGATION PERFORMED BY:

William M. Kemp, Jr.

DETAILS Personnel Contacted:

Confidential l';

i i

}'

l Codes & Reference Material:

t-ASME IX 1980 Welding Hobart Pocket Welding Guide ASME II Part A&C Material Specifications Specifications for SFA5.4 filler ~ material j.

Specifications for SA 312 Grade 316 Alloy Pipe Detailed Weld Procedures: GMA88-B-6*

GMA88-B-6A*

GM88-B-2*

  • Applicable Revisions i

Requirments ASME Section IX for procedure and performance qualifications was reviewed for the essential variables applicable to E-309

& E-308.

These variables include:

QW-404.4:"A change from one F-number in QW 432 to any other F-number or any other filler not listed in QW-432" I :

(ie E308 & E309 are ASME SFAS.4, FS, A8.)

Either filler material is acceptable.

8bOSA90 & W AA

k

(

(

ERT INVESTIGATION REPORT PAGE 2 0F 3 CONCERN NO:

XX-85-013-001 DETAILS, continued QW-404.5:"For the ferrous materials in QW 422 a change in the chemical composition of the weld deposit from one A-number to any other A-number in QW-422."

(ie-E308 & E309 are ASME SFA 5.4,F5,A8) i Either filler material is acceptable.

1 ASME Section II,Part C-Filler Metal states:

l "SFA 5.4 "E309,

E309cb, E309mo, all have a

tensile strength min. PSI of 80,000".

l SFA-5.4's Identical with the requirements of AWS AS.4 69 ASME Section II Part A-Material Specifications states for SA-312 TP316L min. tensile strength shall be 70,000 psi.

Therefore the filler metal is 2:

70,000 i

PSI required for the base material.

[

(ffj SA-312 TP316 L is designated P-8 material.

FINDINGS:

?

Based on the review of the ASME code requirements and the

][

applicable documentation and procedures, the following is determined:

s L

E309 filler metal (electrode) is compatable to the A&F

(

number designations for E308 and E309.

1 s

For the base material, there is no essential variable violation to the code and is allowed per applicable Weld Procedure Specification / Procedure /Preformance f

Qualification Record.

n d

k 4

f 5D, e

,/

~

k

(

l ERT IIIVESTIGATIO1 REPORT PAGE 3 OF 3 COtiCER!1 t;O:

XX-85-013-001 DETAILS, continued CONCLUSIOtIS :

a

]

Based on the findings in this investigation a change from E308 to E309 (same A&F designation) is not a violation of the code or procedure.

The concern as stated may be true.

d

However, the change from 308 to 309 filler metal has no 4

impact on weld quality.

This concern is closed.

[d i!

1,'

r

?,$ :s$

.]

Ti

t t

]

'.I 2L OS PREPARED BY

,yv7-REVIEW D BY ST I

ji DATE I

h Mewed f l

ff

~: -

n a-

\\'

ASEAS i

)

c I

l t

k

(

l f.,

i EMPLOYEE CONCERN DISPOSITION REPORT CONCERN NO. XX-85-013-OO1 1

1

(

DATE OF PREPARATION: 9-9-85 i

f CONCERN:

309 WELD ROD WAS USED TO WELD 316 STAINLESS PIPE AT SECUOYAH

{

UNIT 1.

4 du j

?

l INVESTIGATION PERFORMED BY: ERT FINDING (S):

BOTH E308 AND E309 FILLER MATERIAL MAY BE USED FOR WELDING 316 BASE MATERIAL.

WELDING WITH E309 FILLER MATERIALS IS ALLOWED PER APPLICABLE WELD PROCEDURE SPECIFICATION / PROCEDURE / PERFORMANCE QUALIFICATION RECORD.

)

d i

1 i'

(1 CORRECTIVE ACTION (S) NONE REQUIRED

'I 4

i 1

a 11 N

h CLOSURE STATEMENT:

THE CONCERN AS STATED MAY BE TRUE, HOWEVER, USE OF b)

E309 FILLER MATERIAL IS ACCEPTABLE AND HAS NO IMPACT ON QUALITY.

i<

a l

gyd ERT Form o

,.,.. I l

e D

Y

L

\\'

w REQUEST FOR REPORTABILITY EVALUATION

  • 'Aj%4 f

[

1.

Request No.

XX-85-013-001 (ERT Concern !;o.)

(ID Mo., if reported) 2.

Identification of Item Involved: (Nomenclature, system, manuf., SN, Modei, etc.)

Description of Problem (Attach related documents, photos, sketches, etc.)

3.

309 Weld rod was tised to weld 316 se,4,1oen =enni eten ne

%,,,,.,w 4.

Raason for Reportability:

(Use supplemental sheets if necessary)

This design or construction deficiency, were it to have remained A.

uncorrected, could have effected adversely the safety of operations of the nuclear power plant at any time throughout the expected lifetime of the plant.

NO v YES If Yes, Explain:

AND This deficiency represents a significant_ breakdown in any portion of B.

the quality assurance program conducted in accordance with the requirements of Appendix B.

X Yes If Yes, Explain:

No E.

C. This deficiency represents a significant_ deficiency in final design as approved and released for construction such that the design does not conform to the criteria bases stated in the safety analysis report or construction permit.

No X _ Yes If Yes, Explain:

r s.

q)

ERT Forn M 3

s-u n w a u----

lilVESilGAllVE l'LAN ul-85-020 Reportable t:0 file No.

Substantiated Yes No

_x_

Priority 4

SCliFOULE C0!4PLElf CONCERfl ACTION 11 Fits INVESTIGATOR IIA 1E DAlf Supervision (name given) is tellin8 A.

Identify position of the supervision Wilson 8-6-85 S-6-85 involved and obtain organizational cmployees that the reason people are getting laid off is because the concerns chart for that supervisor'n unit.

identified by the ERT have delayed fuel Wilson 8-9-85 8-9-85.

load.

B.

By intervicus of the unit personnel determine if supervisor made such a

/

statement and, if so when 8-13-85 C.

Interview supervisor to confirm if Wilson 8-9-85 8-13-85 such statement was made and why.

Wilson 8-14-85 8-19-85 D.

Report results of thin jnvestigation.

8 L

/*

s l

t s

n,i i.., m n

rg Reportable t:0 File No.

YY-85-013-001 b

Substantiated Yes No Priority 1

SClifDULE COMPLE1

~

ACTION ITFMS INVESTIGATOR DATF DAl[_

CONCERN 309 rod was used to weld stainless steel 1.

Review applicable codes / procedures &

WMK 7-15-85 7-30-85 pipe (316) at Sequoyah Unit 1 WPS for requirements.

2.

Review welding perameters for welding WMK 8-5-85 8-5-85

/*

316 stainless steel.

3.

Determine if 309 rod can veld 316 base WMK

, 8-15-85 8-15-85 metal WMK 8-22-85 8-22-85 4.

Evaluate and establish report i

f *'

e O

e

( 17 1 1

.m 11 s

TVA EMPLOYEE CONCERNS REPORT NUMBER: XX-85-088-003 SPECIAL PROGRAM REPORT TYPE: Welding Project REVISION NUMBER: 0 TITLE: Altered Welder's Certification REASON FOR REVISION: N/A SWEC

SUMMARY

STATEMENT: N/A PREPARATION PREPARED BY:

Original Signed By R. M. Bateman 11-06-86 SIGNATURE DATE

,+

REVIEWS PEER:

Original Signed by J. E. Rose 11-06-86 SIGNATURE DATE TAS*

lFTECHNICAL REVIEW ONLY Xfy

/

N SIGNATURE DATE CONCURRENCES Original Signed By CEG-H:

.1.

F_ lowis for !FM 11-25-80 SRP:

[

M A7'2 7/.

SIGNATURE DATE SIGNATURE

  • DATE APPROVED BY:

k/

/M-867 N/A ECSP MA$AGER DATE MANAGER OF NUCLEAR POWER DATE l

e.

CONCURRENCE (FINAL REPORT ONLY) l t!

  • SRP Secretary's signature denotes SRP concurrences are in files, f

l 2242T

WELDING PROJECT

(

SQN SPECIFIC EMPLOYEE CONCERNS DATE 11/6/86

SUBJECT:

SEQUOYAH SPECIFIC EMPLOYEE CONCERNS -

SUMMARY

OF WP ENGINEERING EVALUATION CONCERN CONSIDERED: XX-85-088-003 PREPARED BY kk 6[8b DNC, WP

\\ ll 4/Efa DNC, WP REVIEWED BY L-3a J

REVIEWED BY h.b

//!fd 85 DQA, WP oc REVIEWED BY [n m o/ I o4$ 1//2c/(4

/A# L # M, CEG-H, Welding

~

/

[n/_

/U'80 Program Manager APPROVED BY a

~,

i 06470

,-w,.,.

7 y.

.,_________,__m..m y

.r,

4

[c 3

t' I

This package cummarizec the actions taken by the Welding Project (WP) to evaluate and dinposition the subject. SON-specific employee concern which was Lj previously evaluated by NSRS/DTC/ERT and summarized in Wo Phase I and Phase II f.

reports.

j ild h

The Welding Project analy:ed each SON-specific employee concern (Attachment 2) to determine the statement (s) being voiced by these individuals.

i b

These statement were then evaluated both individually and collectively to J

develop issues.

1 i l 4

Each issue was then incorportated into the WP review activities of Phase I, 1

"P ocedural Assessment" and Phase II, " Procedural Implementation."

During Phase I, each issue was analy:ed against requirements of the applicable l

OA program, policies, NSRS/OTC/ERT Investigation Reports, and other relevant 1

l i

information to determine if program elements were deficient when evaluated y$

j, against upper tier requirements.

Phase II consisted of a sample reinspection of hardware and independent 2

4 k' ;i program audit by Bechtel.

J f..

In each area analy:ed by Bechtel, the auditors found no objective evidence to I

I

{.

substantiate the employee concerns considered. The following areas directly 9

a l[

related to employee concern were investigated by the audit team:

O Vp 07I Page 1 of 3 w., =4 I e 1 l t I h

1. Welder qualification and attendant records \\ 2. Welder qualification and attendant on-the-job-training 3. Welding inspections 4. Welding inspectors training programs 5. Weld material traceability 6. Welding inspections by craft personnel 7. Weld material control Each of these areas was investigated by the auditors for both construction and operations phases. In all cases, there was no objective evidence to substantiate the employee concerns. The audit report concludes that both construction and operations phases have had and now have a functioning Welding Quality Assurance Program which meets code, standard, and regulatory requirements and that the employee concerns considered were found to be unsubstantiated and without technical merit. Pago 2 of 3 03371

(( The results of the reinspection program at SQN also give another, additional verification of the Welding Quality Assurance Program for both construction and operations phases and serve to establish additional confidence in the accuracy and implementation of these programs through hardware inspections and attendant document reviews. In all cases, the components and items were found to be acceptable upon initial reinspection or found to be acceptable after engincoring analysis. The WP analysis of SQN Specific Employee Concerns supplemented by the independent Bechtel Audit, reinspection of installed components and systems, and independent (NSRS) overview and investigations has not revealed any significant or generic inadequacies in the welding programs for either the construction or operations phase at SQN which have been directly identified [j!; through the Employee Concern Program. The Employee Concern Program has simply w reiterated problems which have been or are now being resolved through existing corrective action programs in the overall Nuclear Quality Assurance Program. A summary analysis of the WP evaluations and recommendations is included in. Page 3 of 3 337 Page 1 of 3

SUMMARY

OF SQN SPECIFIC EMPLOYEE CONCERNS REVIEWED BY WELDING PROJECT EMPLOYEE CONCERN NUMBER ISSUE WP ACTION XX-85-088-003 Alterations to Welder Not substantiated by ERT Qualification Records in Report XX-85-088-003 of Knoxville 3/8/86 (Attachment 3). XX-85-124-001 Burial of Electrode Stubs Not safety-related. No action required. XX-85-086-003 Box Anchor Design Substantiated by NSRS Report Deficiency. I-85-560-SQN (Attachment 3). WP concurs with report recommendations. XX-85-069-003-R1 Acceptance of Previously Not Substantiated by NSRS ?;, Rejected NDE Items Report I-85-738-SQN (Attach- ' Mi. ment 3). WP concurs with 'T report recommendations.

i

) SQM-5-001-001 Uncertified Welder Foreman Substantiated by WP Evaluation SQM-5-001-002 Performing Preweld Report WP-16-SQN (Attachment )$ WBM-5-001-002 Inspections 3). Interim corrective (Also Listed in actions are being the Generic formulated. Closure is Summary) based on these actions. Additional corrective actions may be implemented. J I' a ( XX-85-068-007 Manufacture of Dravo Spool Not substantiated by NSRS Piece REPORT I-85-636-SQN (Attachment 3). q y l XX-85-069-001 Inadequate OJT-Records for The general issue of gi XX-85-069-001-R1 ISI and QC Personnel for NO inadequate OJT-records was XX-85-069-X05 substantiated by NSRS Report .]I XX-85-069-007 I-85-373-NPS (Attachment 3). E No falsification of records I! was substantiated. WP con-h C, curs with report recommen-dations. 4 h 05640 j' e

l Page 2 of 3 e-y t EMPLOYEE CONCERN NUMBER ISSUE WP ACTION SQM-6-005-001 Craft Welder Incapable of SQM-6-005-001 was SQM-6-005-X02 Naking Proper Welds substantiated; SQM-6-005-X02 was not substantiated by NSRS Report I-86-115-SQN (Attach-ment 3). WP concurs with report. 11-85-013-001 E309 Electrode Used to Weld This is an acceptable E316 Steels practice. ERT investigated in ERT Report XX-85-013-001, dated 3/22/85 (Attachment 3). WP concurs. XX-85-041-001 Improper Weld Rod Used in Not substantiated by NSRS Diesel Generator Building Report I-85-756-SQN (Attachment 3). lb. ,.'f. 11-85-049-001 Welder Certifications XX-85-049-001 was II-85-049-XO3 Updated Without Meeting substantiated as it relates, Requirements to Welder Continuity Require-ments. This had previously been identified by NO in an audit. XX-85-049-XO3 was not substantiated. Details and recommendations are given in NSRS Report I-85-135-SQN (Attachment 3). WP concurs with I-85-135-SQN-01 through -03 and recommends they be closed based on the WP-Bechtel Audit of SQN in Key Elements 4.0, 5.0, and 17.0 (Attachment 4). 11-85-054-001 QC Holdpoint Sign-Off Not substantiated by NSRS Violation Report I-85-346-SQN (Attachment 3). XX-85-065-001 Performance of Remote Visual Not substantiated by NSRS Inspections Report I-85-750-SQN (Attachment 3). 05640

.i Pate 3 of 3 f EMPLOYEE CONCERN NUMBER ISSUE WP ACTION XX-85-083-001 SQN Wold Inspections not as Not substantiated by NSRS Strict as WBN Report I-85-652-SQN (Attachment 3). XX-85-098-001 Laminated Pipe in Unit 2 Not safety-related. Not Condenser. This issue is substantiated by WP Evaluation also on the Generic Summary Report WP-18-SQN (Attachment 3). XX-85-100-001 Improper Weld Repair on an Not substantiated by ERT Undetermined Number of Report XX-85-100-001, dated Welds 3/5/86 (Attachment 3). XX-85-101-006 Welder Certification for ERT Report XX-85-101-006 the Construction Era (Attachment 3) with NSRS Recommendations indicates that this concern is sub-(d.,];[3;, 4 stantiated. WP takes excep- . n I? tion to this ERT Report based on subsequent information provided in Attachment 4. WP exceptions, recommen-dations, and basis for closure were discussed with NSRS as documented in Attach-ment 5. WP recommends this concern not be substantiated and that it be closed based on the WP-Bechtel Implemen-tation Audit, Key Elements 4.0, 5.0, 17.0 (Attachment 6). XX-85-102-011 NDE Inspectors Cannot Write Not substantiated by NSRS Notice of Indications for Report I-85-735-SQN Preservice-Related Defects (Attachment 3). XX-85-108-001 Socket Welds Not Inspected Not substantiated by NSRS XX-85-108-002 Report I-85-776-SQN (Attachment 3). 't 05640

Pa y,e 1 ot 1 10/16/86 (EMPLOYEE CONCERNS) 11:06:47 CAT ISSUE PLANT PRIORITY ORG OTC EGG INSP SD RD GD 10


CONCERN-------

.?J. S 1 NSRS NR XX-85-088-003 'c - YWORDS: CERTIFICATION IMPLEMENTATION DOC ALTER PROB: WCDRM KNXOVlLLE:SEQUOYAH WELDING CERTIFICATION WERE ALTERED BY THE USE OF CORRECTION FLUID BEFORE THEY WERE PHOTOGRAPHED IN KNOXVILLE. PROCESS MARKING SUCH AS FILE INDEXES AND PAGE COUNTS, AS WELL AS ANY MARKS. NOTATIONS, OR ANY DATA THAT DID NOT LOOK LIKE ENGINEERING DATA ON THE BACK OF THE DOCUMENT, WERE DELETED WITH CORRECTION FLUID. DEPARTMENT KNOWN. CONSTRUCTION DEPARTMENT CONCERN. IR: XX-85-088-003 STAT: RC: TECHNICAL COMMENTARY: 'e I i I f;T- 't \\ t

wet, DING PROJECT SQN SPECIFIC EMPLOYEE CONCERNS (' i i l I I l ATTACHMENT 3 l f ERT REPORT XX-85-088-003 I I o . n, c. h ' %..'.,f. M. l f*:s l i i

\\ \\ QUALITY TECHNOLOGY COMPANY g P.O. BOX 600 Sweetwater, TN 37874 (615)365 4414 ._I)ecember 18, 1985 .j ~EKr:QIC85.1644 t y t bk Mr. Bruce Siefken f Nuclear Safety Review Staff f Knoxville, 'IN { E3B37C-K [ SURIECr: err Ccncern Ntabers IN-85-545-001_, IN-85-545-002, IN-85-545-003, WI-85-040-001, and XX-85-088-001.

Dear Mr. Siefken:

Please acknowledge receipt of the above refe enced concems, p IN-85-545-001 has been changed to clarify source of concern. 'Ihis concern has been transferred to concern XD6. h IN-85-545-002 has been changed to clarify source of concern. M concern ]{

  • ~

has been transferred to concern XD7. [ IN-85-545-003 has been changed due to clarificaticn of infonnation and source of concern. M concern has been transferred to concern X08. WI-85-040-001 has been changed due to correcticn of informaticn. '1his concern has been transferred to concern 006. XX-85-088-001 has been changed due to corrections and additional infonration. 'Ihis peern has been transferred to XX-85-088-003. Sincerely, j QUAIIIY 'IECHNOIDGY COMPANY h., &L: j' s [ .W. S. Schtrn, Program Manager y EMPIDYEE RESPCNSE 'IEAM. t t NSS/jlr Enclosures (5) 5 1/2/86--JTil cci

11. S. Sanger, E11333 C-K--Re t XX-85-088-001 (-003 has not been roccived)

%es n .}}