ML20214G913
| ML20214G913 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/26/1978 |
| From: | Ross D Office of Nuclear Reactor Regulation |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0212, CON-WNP-212 NUDOCS 8605230034 | |
| Download: ML20214G913 (1) | |
Text
-
/
Central File / Docket File i'AirRdg.-File"
^
APR 2 61978 Docket No. 50-397
\\
EMORANDUM FOR:
D.B. Vassallo, Assistant Director for LWRs, DPM FROM:
D.F. Ross, Jr., Assistant Director for Reactor Safety, DSS
SUBJECT:
ACCEPTANCE REVIEW FOR WPPSS NUCLEAR PROJECT NO. 2 Plant Name: WPPSS Nuclear Pro.iect No. 2 Licensing Stage: FSAR Acceptance Review Docket No.: 50-397 Responsible Branch and Project Manager: LWR-4, D. Lynch Systems Analysis Branch Involved: Analysis Branch Description of Review: Acceptance Review Requested Completion Date: 4/19/78 Review Status: Rejected The Analysis Branch has reviewed, for acceptance, section 4.4 of' the WNP-2 FSAR. Most of section 4.4 is thcluded by reference to NEDE-20944; section 4 of that topical was found unacceptable for reference in October,1977 (October 12. 1977 Memorandum to D.F.
Ross from Z.R. Rosztoczy, " Review of GE Report Entitled BWR/4 and BWR/5 Fuel Designs"). Therefore, section 4.4 of the WNP-2 FSAR is not sufficiently complete to proceed with the review. In addition, there is no comitment to install a vibration and loose parts monitoring system; one must be installed prior to power operation.
Original signed By D.F.aoss D.F. Ross, Jr., Assistant Director e605230034 7s0426 PDR ADOCK 0 y7 for Reactor Safety Ditision of Systems Safety A
cc:
S. Hanauer R. Mattson S. Varga D. Lynch T. Novak
'~
P. Check Z. Rosztoczy nmJ L. Phillips
.,,,,d
%']\\ h s
[ i ~/
.. _ DSS; AB_
.J W. Hodges
=
RS
Contact:
W. Hodges, NRR, 21588 WHodges.
LEPhillips ZRRos z.to.czy TDFRpss
...4/.25/78 4/ 16 /78 4/ 2 4,178 _
.k /_78, NRC FORM 383 (p.76) NRCM 0240 W w. s. eovan enesne pesunne ory,es, e,..eae.eu
.