ML20214G725
| ML20214G725 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/06/1977 |
| From: | Bosnak R Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0176, CON-WNP-176 NUDOCS 8605220441 | |
| Download: ML20214G725 (2) | |
Text
. - -
MAY 6 1977 Docket No.: 50-397 MS No.: 01-111 l
MEMORANDUM FOR:
S. A. Varga, Chief, Light Water Reactors Branch f4, DPM FROM:
R. J. Bosnak, Chief, Mechanical Engineering Branch, DSS
SUBJECT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WNP-2 (HANFORD NO. 2) DOCKET NO. 50-397 Plant Name: WPPSS Usshington Nuciaar Project No. 2 Suppliers: General Electric; Burns and Roe Licensing Stage: OL Docket No.: 50-397 Responsible Baanch & Project Manager: LWR-4, M. D. Lynch Responsible SS Branch & Technical Reviewer: ME3. J. Rajan Requested Completion Dates April 22, 1977 Description of Task: Acceptance Review Review Status: Complete The Mechanical Engineering Branch, Division of Systems Safety, has conducted an acceptance review of the FSAR for the WPPSS Nuclear Project No. 2.
a.
Areas of Review Sept. 1975 FSAR Standard Sections Rev_iew Plan ME3 Areas of Review Reviewed 3.6.1 Postulated Piping Failures in Fluid Systems 3.6.1 Outside of Containment
%6.2 Dete M -" tion of Preak Leestions end Dynamic 342 l
Effects Associated with the Postulated Rupture of Piping 3.9.1 Special Topics for Mechanical Components 3.9.1 3.9.2 Dynamic Testing and Analysis 3.9.2 3.9.3 '
ASMR Code Class 1, 2 and 3 Components, 3.9.3 Component Supports and Core Support Structures 3.9.4 Control Rod Drive Systems 3.9.4 3.9.5 Reactor Internals 3.9.5 7m/
3.10 Seismic qualitication or wilsmic category 1 J. A'-
orrics >
IneFF1tEhdDnP AIS in ARN E1s$$r$wcOl,ZkN t
4 ewa aus >
8605220441 770506 PDR ADOCK 05000397
\\
oars
- A PDR NRC FORM SIS (9 76) NRCM 0240 W w.. sovannass=t res=rine orrics, sete.eee4ae
O MAY 6 1977 2-S. A. Varga 4.2 Mechanical Desi n of the Fuel System 4.2 S
5.2 Applicabla Code cases 5.2 5.4.2 Steen Generator Design Criteria Not Applicable to WR The Ifachanical Engineering Branch reconssends that the FSAR be accepted for docketing.
b.
Assessment of Completeness The PSAR is estimated to be 957. complete within our areas of review.
The information is sufficiently complate that an evaluation can be performed with two rounds of questions.
R. J. Bosnak, Chief Mechanical Engineering Branch Division of Systems Safety cc:
R. Esineman, SS D. Eisenhut, OR R. Boyd, FM U. Mcdonald, MIPC D. Crutchfield, MtR D. Vessallo, FM J. Knight, SS
[
S. Pawlicki, SS H. Brammer, SS M. Lynch, PM R. Stephens, SS J. Rajan, SS l
Docket File 50-397 NRR Reading File l
DSS:MEB File l
l DSS:hEBi.{y..DS E.B.
I o,,se.
- JRajan:jn_
_.._ o sna k._.
eva. s,
..5/$/ 77 5L'] 77.
o.v
- NRC FORM 318 (9 76) NRCM 0240 W u. s. eovsamment enintime orricae sore - ese.eae
-,