ML20214G719

From kanterella
Jump to navigation Jump to search
Recommends Acceptance of Facility FSAR for Docketing.Fsar 90% Complete within Matls Engineering Branch Areas of Review.Evaluation Can Be Performed within Two Rounds of Questions
ML20214G719
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/04/1977
From: Pawlicki S
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
CON-WNP-0174, CON-WNP-174 NUDOCS 8605220436
Download: ML20214G719 (2)


Text

.__

$11 ia$ ',

l Docket Nos. 50-397 MS 01-12 HEHORANDUM FOR:

S. A. Varga, Chief

+

Light Water Reactors Branch No. 4 Division of Prnfect !!anagement FROM:

S. S. Pawlicki, Chief Materials Engineering Branch

SUBJECT:

WASHItiGTUN PUBLIC POWER SUPPLY SYSTEM, WNP-2 (HANFORD NO. 2), DOCKET NUMBER 50-397(0L)

Plant Name: WPPSS Washington Nuclear Project No. 2 Suppliers: General Electric; Burns and Roe Licensing Stage: OL Docket Number: 50-397

~

Responsible Branch and Project Manager: L!lR 4; M. D. Lynch Reviewer:

G. B. Georgiev Requested CofQletion Date: April 22, 1977 Description of Task: Acceptance Review Review Status: Complete F

The Metallurgy Section of the Haterials Engineering Branch, Office of Nuclear Reactor Regulation has conducted an acceptance review of the FSAR i

for the WPPSS Nuclear Project No. 2.

a.

Areas of Review l

Sept. 1975 FSAR Standard HTEB Areas of Review Sections Review Plan Reviewed Compliance with NRC Regulatory Guides Appendix C 4.5.1 Control rod system structural naterials 4.5.1 4.5.2 Reactor internals materials 4.5.2 5.2.3 Reactor coolant pressure boundary natorials 5.2.3 6.1 Engineered safety feature materials 6.1 10.3.6 Steam and feedwater system materials 10.3.G b.

Recomendation for Docketing The Materials Engineering Branch recornends that the FSAR be accepted for docketing.

My 8605220436 770504 PDR ADOCK 05000397 A

PDR

O S. A. Varga 2-c.

Assessment of Completeness l

The FSAR is estimated to be 95% complete within our areas of review.

l The infomation is sufficiently complete that an evaluation can be l

perfomed with two rounds of questions.

i S. S. Pawlicki, Chief l

Materials Engineering Branch Division of Systems Safety Office of Nuclear Reactor Regulation cc:

R. E. Heineman, DSS D. G. Eisenhut, D0R R. S. Boyd, DPM i

W. G. Mcdonald, MIPC D. Crutchfield, NRR D. B. Vassallo, DPM l

J. P. Knight, DSS R. J. Bosnak, DSS S. S. Pawlicki, DSS U. Potapovs DSS H. F. Conrad, DSS M. D. Lynch, DPM F. B. Litton, DSS G. Georgiev, DSS DISTRIBUTION:

Docket File (50-397)

NRR Reading File MTEB Reading FiTe RE 1.1-l i

i DSS:MTEB DSS:MT,ED._..QSS.;MIEB o,,,e.

...GGeorgie.viemlt_tiEConrth..SSEawl.icki.

. ~..

4L25/1LJN

- LW/1L

.EE5DL 4

..r.

Form AEC.318 (Rev. 9 S)) AECM 0240

  1. u.. eav a n= =..=v

..=nne on,ic as s era. sas.t.e

. _ - -. - - -