ML20214G711
| ML20214G711 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/20/1977 |
| From: | Pawlicki S Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0171, CON-WNP-171 NUDOCS 8605220429 | |
| Download: ML20214G711 (2) | |
Text
_
APR 2 01977 Docket No. 50-397 MS 01-12 MEMORANDUM FOR:
S. A. Vare a, Chief Light Water Reactors Branch No. 1 Division cf Project Management FROM:
S. S. Pawlicki. Chief Materials Engineering Branch
SUBJECT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 (HANFORD NO. 2)
(OL) FSAR DOCKET NUMBER 50-397 Plant Name: WPPSS Washington Nuclear Project No. 2 Suppliers: General Electric; Burns and Roe Licensing Stage: OL Docket Number: 50-397 Responsible Branch and Project Manager: LWR 1; M. D. Lynch Reviewer:
F. B. Litton Requested Completion Date: April 22, 1977 Description of Task: Acceptance Review
~,
Review Status: Complete The Matorials Integrity Section of the Materials Engineering Branch, l
Division of Systems Safety has reviewed the FSAR for the WPPSS Huclear Project No. 2 (Hanford No. 2) for docketing.
a.
Areas of Review Oct. 1972 FSAR FSAR Standard HTEB Areas of Review Sections Format Reviewed 5.2.1 Compliance with Code and 10 CFR 50.55a 5.2.1 5.2.3 RCPB materials 5.2.3 5.2.4 RCPB inservice inspection and testing 5.2.4 l
5.3.1 Reactor vessel material 5.3.1 l
5.3.2 Pressure-temperature limits 5.3.2 1
5.3.3 Reactor vessel integrity 5.3.3 G.2.2 Inservice inspection of Class 2 and 3 6.6 -
components l
10.2.3 Turbine disk integrity 10.2.3
\\
n$.n-y 8605220429 770420 PDR ADOCK 05000397 A
S. A. Varga.
b.
Recomendation for Docketing The Materials Engineering Branch recomends that the FSAR be accepted l
for docketing.
I c.
Assessment of Completeness The FSAR is estimated to be 90% complete within our areas of review.
The infonnation is sufficiently complete that an evaluation can be 1
performed with two rounds of questions.
S. S. Pawlicki, Chief Materials Engineering Branch Division of Systems Safety Office of Nuclear Reactor Regulation i
cc:
R. E. Heineman, DSS D. Eisenhut. D0R R. S. Boyd, DPH W. G. Mcdonald, MIPC D. Crutchfield, NRR D. B. Vassallo, DPM J. P. Knight, DSS R. J. Bosnak DSS S. S. Pawlicki, DSS U. Potapovs DSS H. F. Conrad, DSS M. D. Lynch, DPH G. Georgiev, DSS F. B. Litton, DSS DISTRTRIJTION:
Docket File (50-397)
NRR Reading File MTEB Reading File RE 1.1-1 l
DSS:MTZB DSS:MTESg _ DSS:MTEB
.,,ie.
E5kik5$emb.
3EotapoSys__. S.Stawli.A.
.m.m.
4/2DL77 4thl77
..Al M '
Foren ABC.318 (Rev. 9.$3) AECM 0240 W u. s. eovanmusar Paintino opricas ser4.sas. tee