Text
r y
cc_fCct N
APR 1 1 Off Dochet No. S0-397 MD!0RANDU:1 FOR:
S. Varga, Chief, Light Nater Reactors Branch No. 4, DPM J. ' ollins, Chief, Effluent Treatment Systens Branch, DSE FROM:
C
SUBJECT:
ACCEPTNiCE REVIEW OF TifE FINAL SAFETY ANALYSIS REPORT FOR WASilING1DN PUBLIC POWER SUPPLY SYSTDI NUCLEAR PROJECT NO. 2 PLANT NN4E: Washington Public Power Supply System Nuclear Project No. 2 LICENSING STAGE: OL DOCKET NU'.fBER: 50-397 MILESTONE NUPfBER: N/A RESPONSIBLE BRANCil: LWR-4 PROJECT MANAGER:
M. D. Lynch DESCRIPTION 0F RESPONSE: Final Safety Analysis Report Acceptance Review REQUESTED C0!!PLETFON DATE: April 15, 1977 REVIEW STAnlS: Additional Information Needed We have completed our acceptanco review of the FSAR for WPPSS Nucicar Project No. 2.
Our review included the radioactive vaste management systems (covered by Standard Review Plans 11.1 through 11.S), the auxiliary radioactivo liquid and gaseous process systems (covered by Standari Review Plans 5.4.S. 6.S.1, 0.3.2, 10.4.2, 10.4.3) and the radioactive tank failure accident analysis (covered by Standard Review Plan 1S.7.3), and find that they are approximately 9S% complete. !!owever, we will need additional infomation concerning pro-visions for hydrogen gas analysis in the main condenser offgas treatment i
system and the accident analysis of postulated radioactive releases due to failure of liquid storago tanks. A list of required information is enclosed.
We recorraend acceptance of this application.
/
j CRIGI::1L S G:iED BY
'i. C. E S P.XE M
i j
/
John T. Collins, Chief i
Effluent Treatment Systems Branch Division of. Site Safety and
,/-
Environmental Analysis
Enclosure:
Additional Intornation Needed 8605220407 770414 PDR ADOCK 05000397 A
PDR 0l 7,/
i arm * *
4x 2777S.
PStoddartido.
Ikie k>e
_.JIColl s...
- w' 7
.u.m. a. a 2r
. 04LUL71
.~04L.Lt.L7L...D4/Lt 477-oare n Form ABC 318 (Rev,9.))) AICM 0240 W u. s. eowannaeant painwee orrecas sera.sas.ees
APR i L YST S. Var,",a.
t cc:
S. Lianauer
!!. Denton D. Muller J. Miller R. Boyd R. Vollmer V. Moore D. Vassallo M. Lynch D. Bunch W. Kreger i
F. Congel
- 11. Rogan R. Boyle
- 11. Mcdonald (w/o enc 1)
J. Panzarella (w/o enc 1)
W. Burke P. Stoddart Docket File S0-397 NRR Reading File DSE Reading File ETSB Reading File JTCollins t
I i,
I i
rie r
- sats
- penn Elle (Rev. >$3) ABCM 0240 W u. 8.nowsaaseant paintime careces ee**.ese see
O t
010-1 321.0 EFFLUENT TPEAr ENT SYSTliMS BRANCH g
321.1 Your description of the main Ccndenser offgas treatment (11.3) system is not complete. You should describe the hydrogen gas analyzers used downstream of the recombiners and up-stream of the delay portions of the system. Your des-cription should include a brief description of analy:er checks and calibfat:lons and should specify that the analyser (s) shall be nonsparking.
321.2 We note that you state the accident analysis for liquid (15.7.3) waste tank failures will be supplied later. This information is needed for completion of our analysis. You should pro-vide an estimate of the approximate date this information will be submitted.
.