ML20214G430

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/86-25 & 50-499/86-23 on 860811-870313.No Violations or Deviations Noted
ML20214G430
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/18/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20214G433 List:
References
NUDOCS 8705270066
Download: ML20214G430 (2)


See also: IR 05000498/1986025

Text

2

l

'

^

c

,

,

,

,

-

a

jt '

8-

,

G_

e

j

4

,;

,. -

_-

'In' Reply Refer To:

g g g E'

-

'

Dockets:

50-498/86-25'-

'

'

'50-499/86-23-

v

. Houston Lighting & Power Company.

ATTN:

J.

H.' Goldberg, Group Vice-

President,' Nuclear

P.'O. Box 1700

Houston,-Texas-

77001

.. Gentlemen:

,

~

This refers to.the inspection. conducted by Mr. J. I. Tapia of this office

during the period August 11, 1986, through March 13, 1987, of activities;

authorized by NRC Construction Permits CPPR-128 and CPPR-129 for the South

Texas Project, Units 1 and 2, and.to the discussion.of our findings with you

.and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included followup on an allegation;

reported significant construction deficiencies; responses to NRC Inspection and

Enforcement. Bulletin and Information Notices; and followup on your actions in

regard to the Construction Appraisal Team (CAT)' inspection findings.. - Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

NRC inspector.. The inspection findings are documented in the enclosed

'

insoection report.

Within the scope of the inspection, no violations ~or deviations were

~

identified.

As noted-above, we have examined actions you have taken with regard to

previously identified inspection findings.

The status of these items is

identified'in paragraph 5 of the enclosed report.

,

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed by:

J. E. GAGLIARDO

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

(see next page)

!

C:

d

C:RPB

IV:RSB/0S

C:0Sh

ITapia/cg

DMHunn cutt

G

ble

esterman

Gagli

c'

[/y/87

.(/]/87

87

lL/87

/ 6/y

f

!

8705270066 870518

O/g

ADOCK 0500

8

gDR

'

.

-

.,;

_,:.

.

, . .

. . .

Houst n Lighting & Power Company

--2 -

~

Enclosure:

Appendix - NRC Inspection Report

50-498/86-25

50-499/86-23

cc w/ enclosure:

Houston Lighting &-Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. 0.' Box 1700-

. Houston, Texas

77001

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P. O. Box 1700

Houston, Texas

'77001

Texas Radiation Control Program Director

bec tr> DMB (IE01)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI-0PS

R. D. Martin, RA

  • RRI-CONST.
  • Section Chief (RPB/C)
  • R&SPB
  • MIS System
  • RIV File

.

  • D. Weiss, RM/ALF
  • RSTS' Operator

R. Pirfo, ELD

  • R. G. Taylor, RPD/C
  • RSB
  • Project Inspector
  • R. Hall
  • J. Tapia
  • Section Chief (RSB/05)
  • w/766

-

-

-

- - -

-

- -

.

.

-

- -

.

-

-

-

-