ML20214G246

From kanterella
Jump to navigation Jump to search
Amend 108 to License DPR-71,revising Tech Specs to Incorporate Revised Min Critical Power Ratio Values in Section 3/4.2.3 & in Table 3.2.3.2-1
ML20214G246
Person / Time
Site: Brunswick 
Issue date: 05/15/1987
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20214G248 List:
References
NUDOCS 8705260472
Download: ML20214G246 (5)


Text

., <

p weauq h,

UNITED STATES 4

[

yg/[,g NUCLEAR REGULATORY COMMISSION 5

M..p WASHINGTON, D. C. 20555 d'

CAROLINA POWER & LIGHT COMPANY DOCKET N0. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 108

. License No. DPR-71 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by. Carolina Power & Light Company (the licensee),datedOctober 21, 1986, as supplemented March 11, 1987, complies with the standards and requirements of the Atomic Energy r

Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity.with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

Thereisreasonableassurance(i)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendirent; and paragraph 2.C.(2) of Facility Operating License No. DPR-71 is hereby amended to read as follows:

8705260472 870515 PDR ADOCK 05000325 P

PDR

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.108, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Director Project Directorate 11-1 Division of Reactor Projects - I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: May 15,=1987 f

LA: )

DRPR PM:PD21:DRPR N OG D

DRPR l

Pari. o ESylvester/vag E

1ssm 05/(, /87 05/L/87

, 5////87 05/l$/87 3

ATTACHMENT TO LICENSE AMENDMENT N0.108 FACILITY OPERATII:3 LICENSE NO. DPR-71 DOCKET NO. 50-325 Replace the following pages of the Apperl dix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal-lines.

Remove Pages Insert Pages 3/4 2-10 3/4 2-10 3/4 2.-14 3/4 2-14 i

k Y

4 i

I

(BSEP-1-90)

POWER DISTRIBUTION LIMITS t

3/4.2.3 MINIMUM CRITICAL POWER RATIO LIMITINC CONDITION FOR OPERATION 3.2.3.1 The MINIMUM CRITICAL POWER RATIO (MCPR), as a function of core flou, shall be equal to or greater than the MCPR limit times the rg shown in Figure 3.2.3-1 with the following MCPR limit adjustments:

Beginning-of-cycle (BOC) to end-of-cycle (EOC) minus 2000 MWD /t with a.

ODYN OPTION A analyses in effect, the MCPR limits are listed below:

1.

MCPR for 8 x 8R fuel = 1.34 2.

MCPR for P8 x 8R fuel = 1.36 3.

MCPR for BP8 x 8R fuel = 1.36 b.

EOC minus 2000 MWD /t I

to ECC with ODYN OPTION A analyses in effect, the MCPR limits are listed below:

~

1.

MCPR for 8 x 8R fuel = 1.41 r

2.

MCPR for P8 x 8R fuel = 1.44 3.

MCPR for BP8 x 8R fuel = 1.44 BOC to EOC minus 2000 MWD /t with ODYN OPTION B analyses in effect, c.

the MCPR limits are listed below:

1.

MCPR for 8 x 8R fuel = 1.29 2.

MCPR for P8 x 8R fuel = 1.29 3.

MCPR for BP8 x 8R fuel = 1.29 d.

EOC minus 2000 MWD /t to EOC with ODYN OPTION B analyses in effect, the MCPR limits are listed below:

1.

MCPR for 8 x 8R fuel = 1.30 2.

MCPR for P8 x 8R fuel = 1.32 3.

MCPR for BP8 x 8R fuel = 1.32 APPLICABILITY:

OPERATIONAL CONDITION 1 when THERMAL POWER is greater than or equal to 25% RATED THERMAL POWER ACTION:

With MCPR, as a function of core flow, less than the applicable limit determined from Figure 3.2.3-1 initiate corrective action within 15 minutes and restore MCPR to within the applicable limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

r BRUNSWICK - UNIT 1 3/4 2-10 Amendment No. j$F7108

v we=9et.

(nsgp_3_90}'

w ll TABLE 3.2.3.2-1 c;

l}

TRANSIENT OPERATINC LIMIT MCPR VALUES O

TR ANSI ENT FUEL TYPE g

8x8R P8x8R BP8x8R ss w

NONPRESSURIZATION TRANSIENTS BOC + EOC 1.29 1.29 1.29 i

PRESSURIZATION TRANSIENTS MCPR MCPR MCPR MCPR HCPR MCPR A

B g

B A

B 3

l BOC + EOC - 2000 1.34 1.21 1.36 1.21 1.36 1.21 y

II EOC - 2000 + EOC 1.41 1.30 1.44 1.32 1.44 1.32 li a

Et an e

w

-m