Forwards Insp Repts 50-327/86-48 & 50-328/86-48 on 860908-12 & Notice of Deviation.Response to Notice Should Include Actions Taken or Planned to Improve Effectiveness of Nuclear Performance Plan
ML20214G166
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/14/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20214G169 List:
References
NUDOCS 8611250602
Download: ML20214G166 (2)


See also: IR 05000327/1986048

Text

.

.e

w

November 14, 1985'

_

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

.

M

dTennesgee Valley Authority

ATTN:' Mr. S. A. White

Manager of Nuclear Power - -

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

^

Gentlemen: -

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-48 AND 50-228/86-48

This refers to the Nuclear Regulatory Concission (NRC) inspection conducted by

D. P. Falconer on September 8-12, 1986. The inspection included a review of

activities authorized for your Sequoyah facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection revealed no violation of NRC requirements. However, certain

activities having safety significance appeared to deviate from a commitment

to the NRC. The deviation and elements to be included in your response are

described in the enclosed Notice of Deviation.

In addition to the need for corrective action regarding the specific matters

identified in the enclosed Notice, we are concerned about the implementation

of your TVA Nuclear Performance Plan that permitted this situation to develop.

Consequently, your response should describe those particular '

actions taken or

planned to improve the effectiveness of your program.

Your attention is invited to an unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

Your attention is also invited to paragraph 5 of the enclosed report which

addresses general conclusions associated with this inspection and licensee

actions which are considered necessary to be completed prior to unit restart.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"' Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

k$h

G

t

g (I

e

.

.

Tennessee Valley Authority 2 November 14, 1986

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by K. Barr)

Gary G. Zech, Director

Division of TVA Projects

Enclosures:

1. Notice of Deviation

2. NRC Inspection Report

pc w/encls:

vH. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

/.P.R.Wallace,PlantManager

J . A. Kirkebo, Director

j Nuclear Engineering

R. L. Gridley, Director

Nuclear Safety and Licensing

M R. Harding, Site Licensing

Manager

bec w/encls:

lj.N. Grace,RII

~vH. R. Denton, NRR

vH. L. Thompson, NRR

+ J. M. Taylor, IE

_/B. B. Hayes, 01

, g. R. Connelly, 0IA

vK. P. Barr, RII

w R. Cooper, IE:HQ

JRC Resident Inspector

NRC Document Control Desk

State of Tennessee

RII RII RIld RI / RII 8E

l 0

DFa rt

Adh

BWilson CJu n A tb n

f

feebs 3 dM edoLL

EW$k

104 /86er:bhg,/9 10/g/86 10/13/86 10 /86 10/r /86 ///j/g6

p

Gfenk u;

11/p/86

<