.e
w
November 14, 1985'
_
Docket Nos. 50-327, 50-328
.
M
dTennesgee Valley Authority
ATTN:' Mr. S. A. White
Manager of Nuclear Power
- -
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
-
^
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-48 AND 50-228/86-48
This refers to the Nuclear Regulatory Concission (NRC) inspection conducted by
D. P. Falconer on September 8-12, 1986.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection revealed no violation of NRC requirements.
However, certain
activities having safety significance appeared to deviate from a commitment
to the NRC.
The deviation and elements to be included in your response are
described in the enclosed Notice of Deviation.
In addition to the need for corrective action regarding the specific matters
identified in the enclosed Notice, we are concerned about the implementation
of your TVA Nuclear Performance Plan that permitted this situation to develop.
Consequently, your response should describe those particular actions taken or
'
planned to improve the effectiveness of your program.
Your attention is invited to an unresolved item identified in the inspection
report. This matter will be pursued during future inspections.
Your attention is also invited to paragraph 5 of the enclosed report which
addresses general conclusions associated with this inspection and licensee
actions which are considered necessary to be completed prior to unit restart.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"' Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
k$h
t
G
g (I
e
.
.
Tennessee Valley Authority
2
November 14, 1986
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(original signed by K. Barr)
Gary G. Zech, Director
Division of TVA Projects
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
pc w/encls:
vH. L. Abercrombie, Site Director
Sequoyah Nuclear Plant
/.P.R.Wallace,PlantManager
J . A. Kirkebo, Director
j Nuclear Engineering
R. L. Gridley, Director
Nuclear Safety and Licensing
M R. Harding, Site Licensing
Manager
bec w/encls:
lj.N. Grace,RII
~vH. R. Denton, NRR
vH. L. Thompson, NRR
+ J. M. Taylor, IE
_/B. B. Hayes, 01
, g. R. Connelly, 0IA
vK. P. Barr, RII
w R. Cooper, IE:HQ
JRC Resident Inspector
NRC Document Control Desk
State of Tennessee
RII
8E
RII
RII
RIld
RI
/
l
0
Adh
f
EW$k
BWilson
CJu
n
A tb n
feebs 3 dM edoLL
DFa rt
er:bhg,/9
///j/g6
104 /86
10/g/86
10/13/86
10
/86
10/r /86
p
Gfenk u;
11/p/86
<