Outlines Insp Plan to Be Implemented to Resolve Concerns Re Potential Effects Abandoned Drilled Anchor Bolt Holes Behind Baseplates May Have on Design Margin of Installed Anchor Bolts.Plan Will Be Implemented by Fifth Refueling Outage
ML20214F922
Person / Time
Site: Davis Besse 
Issue date: 11/10/1986
From: Williams J
TOLEDO EDISON CO.
To: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20214F886 List:
References
NUDOCS 8611250482
Download: ML20214F922 (2)


Text

b' I

TOLEDO EDISON JOE VVILUAMS. JR s~ vnse run (419}249 2300 Docket No. 50-346 14191249 5223 License No. NPF-3 Serial No. 1-679 November 10, 1986 Mr. C. J. Paperiello, Director Division of Reactor Safety United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Paperiello:

Toledo Edison provides this letter to outline the inspection plan which will be implemented to resolve concerns regarding the potential effects abandoned drilled anchor bolt holes behind basepintes may have on the design margin of installed anchor bolts. Toledo Edison's position regarding this issue was previously submitted on June 18, 1986 (Serial 1-644).

To alleviate concerns regarding potential reductions in design margin for anchor bolts due to adjacent empty holes, an inspection plan will be implemented by the end of the fifth refueling outage. The inspection will be based upon the following:

1.

A sample of anchor bolt installations will be inspected to provide a 95% confidence level that 95% or greater of the installed anchor bolts have factors of safety as required by IE Bulletin 79-02.

(

2.

The sample will be selected from a cross section of the piping I

systems in the plant.

1 3.

The inspected bolts will be relatively highly loaded. This criterion remains to be defined and will be specified within the inspection plan.

4.

The ASCE paper titled, "Effect on Abandoned Holes on Capacity of Wedge Bolts," will be utilized as part of the basis for sample acceptance criteria.

8611250482 861120 Ain UUY] 4 g PDR ADOCK 05000346 G

PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652

>,y 2-

.t

_ ~ :i.

Dockst No. 50-346

(

License No. NPF-3 Serial No. 1-679 November 10, 1986 Page 2 5.

This sample inspection shall be completed prior to the end of the fifth refueling outage. Toledo Edison intends to start implementing this program as plant conditions permit, while the unit is on line.