ML20214E984

From kanterella
Jump to navigation Jump to search
Forwards Proposed Scope & Objectives for Facility 1987 Annual Emergency Plan Exercise,Per Guidance Contained in 830803 & s
ML20214E984
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/04/1987
From: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8705220353
Download: ML20214E984 (4)


Text

a.

RECEIVED

,,f~O7 HRC Southem Ca//fom/s Ed/ son CompenM81 HAY -8 A 11: 13 P. O. Box 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 v6CE PRC hDEN Ste 3026408 May 4,1987 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. John B. Martin, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-206, 50-361 and 50-362 San Onofre Nuclear Generating Station Annual Emergency Plan Exercise In accordance with the guidance contained in your letters of August 3,1983

. and April 3,1984, enclosed are the proposed scope and objectives for the annual emergency plan exercise scheduled for August 12, 1987.

Please contact me if you have specific questions.

Very truly yours, b

Enclosures cc: FEMA Regional Director (2 copies)

State of California, Office of Emergency Services (1 cupy)

G705220353 870504 PDR ADOCK 05000206 F

PDR.

I'}

3<.,q

_.g i.,*

4 SAN ONOFRE NUCLEAR GENERATING STATION 1987 ANNUAL EMERGENCY PLAN EXERCISE OBJECTIVES A.

ONSITE OBJECTIVES 1.

Demonstrate the ability of on-shift and recalled personnel to recognize accident conditions, and to declare the appropriate emergency classification within 15 minutes of recognition.

2.

Demonstrate the ability to recall required SCE Emergency Response Personnel in accordance with Emergency Plan Implementing Procedures (EPIPs) and the Corporate Emergency Support Organization (ESO)

Procedures.

3.

Demonstrate notification procedures and communication capabilities 'to provide' accurate event and follow-up notifications to offsite agencies within specified time limits.

4.

Demonstrate the ability of on-shift and recalled Emergency Response Personnel to conduct adequate turnovers and transfer of responsibilities in accordance with EPIPs and ESO Procedures.

5.

Demonstrate the ability to staff and operate required onsite (TSC, OSC, EOF) and offsite (ENC, HSC) emergency response facilities with the required personnel within the time limits specified by EPIPs and ESO Procedures.

6.

Demonstrate the ability to transmit information between Emergency Response Facilities as it relates to the process of recommending protective actions for the general public in accordance with EPIPs and ESO Procedures.

7.

Demonstrate the ability to provide accarate reports of medical team status to Emergency Response Facilities as soon as practical following secondary survey of patient (s), consistent with attending to patient (s) and other required duties.

8.

Demonstrate the adequacy of SCE radiation monitoring team deployment to provide continuous radiological assessment by accurate communication of field monitoring data and the incorporation of the monitoring data into protective action decision-making.

,*dk B.

OFFSITE OBJECTIVES

.l.

Demonstrate the adequacy of notification procedures and communicatior. capabilities to notify and mobilize emergency response personnel in accordance with the offsite jurisdictions' emergency response plans..

2.

Demonstrate the capability to fully activate and? staff

.the_ Emergency Operations Centers (EOCs) to meet exercise. objectives.

3.

Demonstrate the ability to assess recommendations and disseminate information to the appropriate organizations, including recommendations concerning public protective action.

4.

Demonstrate the ability to deploy field radiation monitoring teams, take measurements, and c.ommunicate with the Offsite Dose Assessment Center (ODAC).

5.

Demonstrate the ability to develop and issue' Emergency Broadcast System (EBS) messages and. coordinate release

~

of EBS messages with the activation of the Alert and Notification System.

6.

Demonstrate the ability to coordinate the dispatch of emergency workers including exposure control.

7.

Demonstrate the ability to activate Reception and Care Centers in a timely manner, as needed.

8.

Demonstrate the decision-making process with respect to supplying emergency workers with potassium iodide (KI).

9.

Demonstrate the ability of the State of California to respond to requests from local governments for assistance.

C.-

JOINT OBJECTIVES 1.

Demonstrate the adequacy of the decision making process between the EOF and offsite EOCs in coordinating protective actions towards the general public.

2.

Demonstrate the ability to perform offsite' dose assessment projections necessary to provide advance warning to local, state, and federal agencies, and to the general public.

3.

Demonstrate the ability to activate and operate the Emergency News Center (ENC) and coordinate the dissemination of timely and accurate information to the news media by means of press releases and news briefings.

e; 3 ;. ;-

x W

LSAN'ONOFRE NUCLEAR GENERATING STATION 198_7 ANNUAL-EMERGENCY. PLAN EXERCISE-SCOPE The annual emergency plan exercise willibe conducted on August 12, 1987 between'the-hours of 8:00 am and 2:00'pm..The exercise will simulate an abnormal radiological incident at-SONGS Unit-1.

The-response to the: incident will be evaluated by the Nuclear

. Regulatory Commission.(NRC)'and the-Federal Emergency Management; Agency (FEMA).

The exercise willicommence with a postulated' plant condition

'which necessitates' the declaration and escalation of emergency classes.

This will require the ability to. properly recognize and

' classify. abnormal conditions within the plant'in addition to making necessary notifications to plant personnel and offsite emergency. response organizations.

Personnel will be required to take appropriate actions to mitigate damage to the plant and protect the health and safety of the-general public.

Offsite agencies will fully participate in this exercise in accordance with.the biennial exercise concept for offsite-involvement.