ML20214E150

From kanterella
Jump to navigation Jump to search
Forwards Special Safety Insp Repts 50-454/86-06 & 50-455/86-05 on 860204-06.No Violations Noted
ML20214E150
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/28/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214E153 List:
References
NUDOCS 8603070152
Download: ML20214E150 (2)


See also: IR 05000454/1986006

Text

..

'

. .

FEB 281986

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. L. J. Hueter

of this office on February 4-6, 1986, of activities at Byron Nuclear Station

authorized by NRC Operating License No. NPF-37 and Construction Permit

No. CPPR-131 and to the discussion of our findings with Mr. R. Ward and other '

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during ,

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

<

' Original signed by W.D. Shafor"

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Report

No. 50-454/86006 DRSS ;

No. 50-455/86005 DRSS i

See Attached Distribution ,

RI . R11h RIII RI

"

n QJ 9' b f

liuet p/rf Schumacher Forney Po

g/l/P I I

ge8Mnu EIE$R* 6 hp q

'

.

Commonwealth Edison Company 2 FEB 281986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division