ML20214E103
| ML20214E103 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/01/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| GL-85-15, NUDOCS 8603070111 | |
| Download: ML20214E103 (1) | |
Text
MAR 11986 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:
This refers to your letter of February 14, 1986 on the subject of Environmental Qualification of Limitorque Motor Operator Internal Wires at Point Beach Nuclear Plant, Units 1 and 2.
This letter was discussed with Mr. E. J. Lipke and Mr. C. W. Krause of your staff in a telephone conversation with C. J. Paperiello of my s.taff on February 26.
It is Region III's opinion that licensees may voltatarily enter limiting conditions of operations provided that all technical specification preconditions and action statements are met.
The question of Point Beach's compliance with 10 CFR 50.49 because of potentially unqualified internal wires in EQ Limitorque M0V operators is being reviewed by the NRC along with other similar cases.
If it is determined that a violation exists, enforcement action could be taken in accordance with 10 CFR 2, Appendix C, and Generic Letter 85-15. The length of time the violation existed could be a factor.
If you have any additional questions on the above, please call C. J. Paperiello, Director, Division of Reactor Safety.
Original signed by A. Bert Davis James G. Keppler Regional Administrator cc:
J. J. Zach, Plant Manager DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII John J. Duffy, Chief Boiler Section 96c307 % h 3o1 oo266 Ness Flores, Chairperson FDR A
PDR Wisconsin Public Service P
Commission RII RII RI I RIII
\\
J h
per lo le s,
>}2g p fw,ler jh/
av ep
/1ef86
/