a c***************************************************************************
UNIT 1 OPERATING DATA REPORT o***************************************************************************
Docket No. 50-317 May 11,1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD APRIL 1987 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 719 2,879 105,012
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 18.4 1,927.3 81,699.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 17.4 1,639.7 79,855.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 29,582 4,232,714 199,763,109-
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 13,698 1,435,079 66,125,072
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 13,077 1,361,471 63,108,569
- 19. UNIT SERVICE FACTOR 2.4 57.0 76.0
- 20. UNIT AVAILABILITY FACTOR 2.4 57.0 76.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 2.2 57.3 73.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 2.2 56.0 71.1
- 23. UNIT FORCED OUTAGE RATE 97.6 36.4 9.4
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
May 18, 1987 8705210433 870430
~
b[Jf
'{I {
PDR ADOCK 05000317 R
s J
i 4
+
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date: May 11, 1987 Completed'by C. Behnke.
Telephone: (301) 260-4871 MARCH Average Daily Power Level Average Daily Power Leve
. Day (MWe-Net)
Day (MWe-Net) 1 545 17 0
2 0
18 0
3 0
19
_0 4
0 20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
i
,._.,,-w
..._.,_,e.,_,,,,.,,r._,,..
UNIT SIRTI1MMNS AND l'(MIR REIMICTIONS IX)CKET NO.
50-317 IINIT NAFG? Calvert Cliffs - 1 DNIV. EaA IL__1987 COMPl.ETED IW C. Behnke REPORT M WHI April
'IV.I.EPIIONE (301)260-4871 '
]
4 o
o ce el O tf1 p c
,o, 'g g
,,c g 1.irensee
.Q g'q, C.ns < & Correct. i ve No.
Das e yg g
jgg Event.
y4 g
Ar t i < ni i o 5
y yjg Helwn t. #
g u
l'revent Recin rence R
g
.ws u
8 Reactor was manually shutdown after
'9) 87-06 870401 F
701.6 H
1 87-007 PC VALV0P an NRC inspection of our EQ(10CFR50. 4 program revealed non-qualified taped splices on SV4530 & SV4531. Correct ive action includes:
1.
A comprehensive inspection pro-gram to inspect all EQ splices &
repair as necessary.
2.
A task force formed to assess' equipment with identified dis-crepancies to determine opera-bility of same prior to shutdown.
3.
Selected EQ files to be reviewed by independent consultant.
4.
Upgrade controls in program communication and documentation.
3 l':
Force-ci Reason:
Pb tlawl:
l'.sliihi t G-I nst ruct. ions S: Sciu clulevi A-Espiigwnent Failure (Explain) 14tunta l l'or Preparat. ion ol' Dat a 11-Maint.cnance or Test, 2-FLinnal Scram.
Ent ry Sheet.s l'or I.irense C-Rel'au l ing 3-Ant <wnal.ie Scram.
I'. vent Regun t -(I l.R) File D-Repilat.ory Restrict. inn 4-0t lice (Explain)
( NUREG-0161 )
E-Operator Training & I.icense l'.xaminal,lon F-Acimi ni st. rat,i ve 5 Exhibit. 1 - Szune Source G-Operational Error (Explain)
Il-Ot her (Explain)
a
. o*********4*****************************************************************
UNIT.2 OPERATING DATA REPORT o***************************************************************************
Docket No. 50-318 May 11,1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
-~
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD APRIL 19?7-3.
LICENSED THERMAL POWER (MWT) 27uv i
- 4. NAMEPLATE RATING (GROSS MWe) 918
.5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6... MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH. RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 719 2,879 88,367
- 12. NUMBER OF HOURS REACTOR WAS-CRITICAL 0.0 1,733.2 73,619.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 0.0 1,727.3 72,547.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,443,141 182,759,996
- 17. GROSS-ELECTRICAL ENERGY GEN'TED(MWH) 0 1,500,438 60,337,950
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,436,978 57,593,901
- 19. UNIT SERVICE FACTOR 0.0 60.0 82.1
- 20. UNIT AVAILABILITY FACTOR 0.0 60.0 82.1
- 21. UNIT CAPACITY' FACTOR (USING MDC NET) 0.0 60.5 79.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 59.1 77.1
- 23. UNIT FORCED OUTAGE RATE 0.0 1.4 5.8
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
June 1, 1987 j -
i 4
e
..----ye-.,,,v.--. - - -,,
.,----3-,w---,...--..w,-,ww...
,,vv-er - we,,w.w
,,.,w w w. %,,.-we m. -
,me,-
,-e,rv-
c AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No.-2 Date: May 11, 1987 Completed by C. Behnke Telephone: (301) 260-4871 MARCH
-Average Daily Power Level Average Daily Power Leve Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
E
~.
IINIT SIRTI1N1WNS AND I'llWl'R REIMICTIONS INK'Kl'T NO.
'50-318' ilNIT NA>g; Calvert' Cliffs
_2-IWI1? gy 11,1987 '
(XIMI'IEIT.n 13y ggeg, REI' ORT MWill April
'Ilil.EI1NINE (301)260-4871' m
f I t:e O C-es
(*;uise & Corre et.ive c
Cg 1.ireinsee Q
d'Q
,o [
3,p g
Ms.
Dat c 8.
o I; tent.
p o m
. Ac t. i nn t n ~
o -s e
mO 4
.c a cf.
mt C
u l'avvent.- Hernrivin e g-yjg Repoi t. //
7g.]
g
<. u t s u
8 87-05 870401 S
719 C
NA
-NA ZZ ZZZZZZ Continued shutdown for seventh refueling and for 10 year ISI.
'l l
l I
l l
'3 4
F:
l'oiveil
~ Reason:
Ph tinwl:
1 xliilii t. G-Inst slict. inns -
I S: Srlw ili Icel A-lipiigwnent Failnix- (l'.xpl a i n )
1 - Minitia l l'oi Pregi;n at.iiisi ol' Data ll-Maint enance on Test.
2->t uina i Se rain.
I'nt ry Slicet s for I.icense C-Ref'iiel i ng 3 - Ant ewnat.ir Scram.
I: vent Relwirl. (l.l R) 17i le D-Rep:1at ory Rest.rict ion:
4-tH lier (Explain 1:
( NIIRIU -0161 )
E-Ogx rat.oi Training & License Examisial. ins F-A Iminist.e at.i ve 5 ExtiHill, I Same San *'e G-Ogw rat.ional Error (Explain)
II-Ot tier (Explain)
~ - -
'*=
Summary of Unit 1 operating Experience April 1987 4/1 The Unit began this reporting-period at full reactor power (860MWe).
4/1 At 1200, the Unit began decreasing power.
At 1724 the Unit was removed from the grid.
At 1825 the Reactor was shut down for Environmental Qualification upgrades.
4/30 The Unit was shutdown at-the end of the reporting period.
. g _.1. :
- i Summary of Unit 2 Operating Experience.
April 1987 The Unit'was shut down for the Seventh Refueling outage throughout this reporting period.
h e
4 f
i 4
m.
.--,-e--me--a-.
,y..y
,,w.-,r,-m--w-.v4.,
m-
,y-,_ ~, -s,-,
_w-.y,,,rg,,,,
,,y,,,.--
_w.,,
.,4'.
~.9 e
May 6,1987 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant,-Unit No. I
- 2.. Scheduled date for next Refueling Shutdown: March 26,1988 3.
Scheduled date for restart following refueling: May 12,1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption 'of operation after refueling will not require changes to Technical Specifications.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
February 5,1988 P
6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to-that reload fuel inserted into Calvert Cliffs Unit 2 eighth cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1138 Spent Fuel Pools are common to Units I and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 1.
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 i.
l l
l l
l
r.
~
May 6,1987 -
REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 14,1987.
- 3. Scheduled date for restart following refueling: June 1,1987.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuelinserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 1138 Spent Fuel Poolis common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Changed since last report.
.?
BALTIMORE GAS AND ELECTRIC CHARLES CENTER.P. O. BOX 1476 BALTIMORE, MARYLAND 21203 JAMES R. LEMONS MANAGER NUCLEAR OpsRATioNs DEPARTMENT May 8, 1987 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20055 Attention:
Document Control Desk
Subject:
April operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Carl Behnke, (301) 260-4871.
Sincerely, 9 11 / "
J. R. Lemons Manager-Nuclear Operations Department JRL/CB/jaf (ODR.LTR)
Enclosures cc:
M. Beebe (NRC)
V. P. O'Grady (BG&E)
E. K. Bowley (BG&E)
D. Reilly (INPO)
T. Foley (NRC)
P. Ross (NRC) l K. Gibbard (DOE)
J. A. Tiernan (BG&E)
S. A. McNeil (NRC)
E. Wenzinger (NRC)
W. J. Lippold (BG&E)
Technical Librarian T. Magette (DNR)
File K. Gromack (CE)
'\\
_ - -