FEB 2 019ss Georgia Power Company jATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
2 i
SUBJECT:
MEETING
SUMMARY
- V0GTLE FACILITY - DOCKET NO. 50-424 I
This refers to the management meeting conducted at your request in the NRC Region II Office on February 6, 1986. This meeting was held to brief the NRC on i
Module No. 7 of the Vogtle Readiness Review Program entitled " Plant Operations
]
and Support."
It is our opinion that this meeting was beneficial and has provided a compre-hensive overview of the Vogtle Readiness Review Program and, specifically, the Plant Operations and Support Module.
This in-depth presentation will better enable the NRC to conduct its evaluation of this module.
7 In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning these matters, we will be pleased to discuss them.
Sincerely, Original Signed by Roger D. Walker /for J. Nelson Grace Regional Administrator
Enclosure:
List of Attendees cc w/ encl:
(See page 2) i 1
monBRBES$a*
A i\\
SE45"
E B 2 0 1986 Georgia Power Company 2
cc w/ encl:
V. E. Conway, Senior Vice President &
R Project Director
/D. O. Foster, Vice President, Project Support v@. D. Rice, Vice President, Project Engineering A. H. Pinson, Vice President, Project M. Construction T. Beckham, Vice President &
General Manager - Operations A. A. Thomas, Vice President, Licensing
- 4. W. Hayes, Vogtle Quality Assurance Manager
- 4. C. Ramsey, Manager -
Readiness Review
- 8. B. Bockhold, General Manager, Nuclear Operations d.T.Gucwa, Chief
- d. Nuclear Engineer H. Googe, Project Construction Manager vt. D. Groover, Quality Assurance Site Manager -
Construction
- 66. A. Bailey, Project Licensing Manager
- 4. F. Trowbridge, Esq., Shaw, d.Pittman, Potts and Trowbridge W. Churchill, Esq., Shaw,
, Pittman, Potts and Trowbridge vf. L. Blake, Jr., Esq., Shaw,
/.Pittman, Potts and Trowbridge J
E. Joiner, Troutman, Sanders, Lockerman and Ashmore
/J.G.Ledbetter, Commissioner, Department of Human Resources
/.H. Badger,OfficeofPlanning J.andBudget Kirkland, III, Counsel, Office of the Consumer's Utility Council J. C. Teper, Georgians Against Nuclear Energy cc w/ encl:
(Cont'd on page 3)
FEB 3 0 f98E Georgia Power Company 3
1 Sc w/ encl:
(Cont'd)
- 4. Johnson, Executive Director, Educational Campaign for a Prosperous Georgia sh. B. Margulies, Esq., Chairman, Atomic Safety _and Licensing Board
)
vd. Panel
~
H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel sa. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board v6. Panel P. Garde, Citizens Clinic Director, Government I
Accountability Project cc w/ encl:
-. R. Thompson, NRR
. M. Hill, IE M. Sinkule, RII
. Rankin, RII NRC Resident Inspector Document Control Desk State of Georgia 5
?
I b
@4$
WRankin:jk MSinkule VBrownle R alker I
-2/13/86 2/g$/86 2/gg/86 2/p]/86 l
i 1
4
- i m
i FEB 2 01986 s
ENCLOSURE LIST OF ATTENDEES Vogtle Readiness Review Meeting on Module No. 7.
February 6, 1986, at 12:30 p.m.
U. S. Nuclear Regulatory Commission A. F. Gibson, Director, Division of Reactor Safety (DRS)
V. L. Brownlee, Chief, Reactor Projects Branch 3, Division of Reactor Projects (DRP)
M. V. Sinkule, Chief, Reactor Projects Section (RPS) 3C, DRP F. Jape, Chief, Test Programs Section, DRS B. T. Debs, Acting Chief, Operational Programs Section, DRS W. M. Hill, Senior QA Specialist, IE W. H. Rankin, Technical Assistant Division of Radiation Safety and Safeguards F. Orr, Senior Technical Reviewer, NRR J. F. Rogge, Senior Resident Inspector, DRP F. R. McCoy, Reactor Inspector, DRS G. A. Schnebli, Reactor Inspector, DRS L. E. Nicholson, Reactor Inspector, DRS J. R. Thompson, Project Engineer, NRR Georgia Power Company W. C. Ramsey, Manager, Readiness Review Program H. P. Walker, Readiness Review Discipline Manager and Assistant Plant Manager S. A. Bradley, Readiness Review Operations Team Leader
!