ML20214A436

From kanterella
Jump to navigation Jump to search
Forwards One Engineering & Two Matl Control Final Element Repts from Employee Concerns Special Program.Listing of Rept Numbers,Related Concerns & Previous Submittal Dates Also Encl
ML20214A436
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/13/1987
From: Martin M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20214A438 List:
References
NUDOCS 8705190452
Download: ML20214A436 (9)


Text

( ., '

TENNESSEE VALLEY- AUTHORITY Watts-Bar Nuclear Plant P. O. Box 800 Spring City. Tennessee 37381 May 13, 1987

'U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 EMPLOYEE CONCERNS TASK GROUP (ECTG)

Enclosure 1 provides a listing of the report numbers, the related employee

' concerns, and the previous submittal dates if applicable. To assist you in your review of these reports, Enclosure 2 provides a comparison between the ECTG Writer's Guide recommended report format and the transmitted reports.

Enclosure-3 transmits the final element reports for 3 elements addressing Sequoyah Nuclear Plant employee concerns in the following categories:

Engineering - 1 report Material Control - 2 reports As indicated by the report cover sheets, these reports have completed final review by responsible program management. With these final reports, this completes the SQN element report submittals except for any revisions which may be deemed necessary as related activities, such as NRC review, progress. All SQN applicable concerns as transmitted to you in our letter dated September 3, 1986, have now been addressed except for concern BFN-85-001-001. This concern

'is applicable to all sites, however, it will be evaluated at the corporate

. level. It has been determined that a site-specific evaluation is not appropriate and, therefore, the concern is no longer included in the SQN restart plan.

Please telephone me at (615) 365-3587 (Watts Bar) if you have any questions.

Very truly yours, TENNESSEE VALLEY AUTHORITY A .s .A&

B7051904 ADO y $ h 27 M. S. Martin PDR PDR Watts Bar Nuclear Plant P ECTG Licensing Manager

+

cc (See page 2.):-

i \

An Equal Opportunity Employer

m- -

o .2' U.S. Nuclear Regulatory Commission ec (Enclosures):

Mr. G. G.'Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission.

Region II-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. John A. Zwolinski, Assistant Director For Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland -20018 '

Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379 5096T J

t y-, ,< ._e-- - - - -, ,-._--,,,,---,,wc.--w,,,m-.-,w, ,v.. e p, m.- i.-, .~w-- w-9a

( . , ..=.. - ... - .- -.. . - ._.. . . . - - . . . . . ... . - .- . .-

i i

h 4

J i Enclosure 1 e

h 4

e 4

f i

i t

1.

I i

i i

.I

-.e. . - - a - ,., .,n . _ _ . . . _ , . . -e.n,..__,_,-.,._ ,, e-,.--- . . . , ,eg.-,,,-,-.,. ,.,,,,,....,n,,,,n.,,-n,m ,,n,_._w,,m.,,w, -

_n.,-.-e,.,.,,.,,. .e_

ENCLOSURE 1 Page 1 of 1 SEQUOYAH EMPLOYEE ELEMENT REPORT CONCERN NUMBER ISSUE Engineering 23801 IN-85-432-001 Conduit Overfills and Cable (Final) IN-86-036-001 Damage IN-86-310-001 IN-85-313-001 IN-85-506-001 IN-85-622-001 IN-35-685-001 IN-85-743-008 IN-86-034-001 IN-86-266-003 IN-85-642-001 IN-85-856-003 IN-86-028-002 IN-86-262-001 IN-85-832-001 IN-85-312-001 IN-85-734-001 IN-85-367-001 IN-86-262-004 IN-86-254-009 IN-86-206-001 OW-35-007-003 NOTE: Initial report transmitted 12/24/86.

Material Control 40703 EX-85-023-001 Heat Codo as Related to

.(Final) IN-85-545-X07 Material Control IN-85-660-001 WI-85-008-002 XI-85-027-X02 NOTE: An initial report was not necessary. This will be the only submittal for 40703.

Material Control 40709 XX-85-027-X04 Material Personnel - Search (Final) for Defective Material NOTE: Initial report transmitted 12/09/86.

5096T

__ ~ . - _ . . , _ _ .. ._. ,- - ._. -. -.

' ka

+

Enclosure 2 J

t t

1 l

I I

i i

t I

+ +- T- P-- e w re e e mm9e- -

Tw-T-w -me _&-+ +- -=-- wis----W w ee erww--g - ----wmiw-ywww-wwyv Wf-wwy'M y '-*v w--h pvem w y gre vew- y-v yg - w -+ yyy n -per pp**--w-M

ENGINEERING CATEGORY Enclosure 2 Page 1 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT

.1.0 Issue. .

1.

Characterization Characterization of Issue (s) 2.0 Summary

9. Discussion, Findings and Conclusions 3.0 Evaluators Cover Sheet Information 4.0 ~ Evaluation 8. Evaluation Process Process-5.0 Findings 9. Discussion, Findings, and Conclusions 6.0 Root Cause (Collective Significance)x* **

Overall Root Cause will not be considered at this report level.

7.0 Attachments /

List of Concerns Attachments as required Other items included 2.

in Engineering Element Have issue (s) been identified Reports in another systematic analysis?

t .

3. Document nos., tag nos.,

j locations or other specific

descriptive identifications stated in element.

i 4. Interview files reviewed

5. Documents reviewed related to the element 1992T

- _ _ _ _..-. _ , _ , _ _ _ _ _ _ _ _ _ _ . . - _ _ _ _ _ _ _ _ _ _ . . . - - _ l

ENGIREERING CATEGORY Enclosure 2 Page 2 of 2 ECTG WRITER'S GUIDE ELEMENT REPORT FORMAT Other items included in, Engineering Element

' Reports 6. What regulations, licensing.

(cont'd) commitments, design require-ments, or other apply or control in this area?

7. List requests for information, meetings, telephone calls, and

.other discussions related to element.

MATEF.IALS CONTROL Enclosura 2 ECTG WRITEP'S GUIDE ELEMENT REPORT FORMAT _,

1.0 Issue Characterization I. Introduction II. Summary of Perceived Problem 2.0 Summary IV. Summary of Findings Conclusions (Portion) 3.0 Evaluators Cover Sheet Information 4.0 Evaluation Process III. Evaluation Methodology

5.0 Findings

IV. Summary of Findings 6.0 Root Cause V. Root Cause (Collective Significance)** **

Overall Root Cause will not be considered at this report level.

7.0 Attachments /

List of Concerns VIII. Attachments Other items included VI.

in Element Corrective Actions Reports (To be provided by line organizations)

. VII. Generic Applicability 190ST i

T=

l l'

Enclosure 3 i

i i

i l

l