ML20214A405

From kanterella
Jump to navigation Jump to search
Forwards Status Rept on Sser Technical Inputs Subsequent to 870404 & 05 Meetings W/Technical Staff.Attendance of Assistant Director &/Or Branch Chiefs Associated W/Each Item Requested at 870518 Meeting in F Schroeder Office
ML20214A405
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/14/1987
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Miller H, Shao L
Office of Nuclear Reactor Regulation
References
NUDOCS 8705190440
Download: ML20214A405 (5)


Text

.

Docket Nos. 50-498 May.14,1987 and 50-499 MEMORANDUM FOR:

Larry C. Shao, Director Division of Engineering and System Technology Hubert J. Miller, Deputy Director Division of Licensee Performance and Quality Evaluation FROM:

Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects

SUBJECT:

SUPPLEMENTAL SER INPUTS ON SOUTH TEXAS PROJECTS Enclosed is a status report on the technical inputs for the South Texas Project subsequent to a series of meetings on May 4 and 5, 1987 in which the technical staff participated.

This memo is being transmitted only to the divisions which lave staff input outstanding and for which sufficient infor-mation has been received from the applicant to complete the review.

In the enclosure, this status is referred to as " Staff input required."

It is requested that the Assistant Director and/or Branch Chiefs associated with each of the items which shows the status of " Staff input required" attend a meeting in the Office of Frank Schroeder (P-1102) on May 18, 1987 at 2:30 p.m.

At this time, the items shown as " Applicant Action Required" have been excluded from consideration at the meeting.

The applicant has indicated that all actions on their part will be completed by May 15, 1987.

The next meeting with the Assistant Director and/or Branch Chiefs will cover those items.

We appreciate the priority consideration being given to completion of the South Texas review.

EIg!nalrJgsd byi

)

d[L hN CU ru ch)fi ld, Director

~

u 8705190440 870514 Dennis M.

PDR ADOCK 05000498 Division of Reactor Projects - III, IV*

A PDR V and Special Projects

Enclosure:

As stated cc w/ enclosure:

DISTRIBUTION C.E. Rossi

-Docket File 2 Local PDR F. Congel Local PDR PD4 Reading File J. Partlow DCrutchfield FSchroeder JACalvo NPKadambi PNoonan CONTACT:

l N. P. Kadambi, NRR/RD-IV

]

49-29407 1

PD4 Af NPKadambi:as &JACalvo Sdroeder DCrutchfield 5/g/87 5/g/87,

//2187 5/g/87 i

+

ENCL 0sURE May 14 1987 0

SOUTH TEXAS PROJECT OPEN AND CONFIIDET0RY ITEMS FORMER REVIEWERS ASSIGNED TO THE ISSUE Responsible Foriser Reviewer Current Branch Status As Of May 11, 1987 j

Branch for SE Input staff input received SPLB/J. Craig W. LeFave/SPLB (1) Internal flooding analysis Draft input received SIC 8/A. Thadani J. Mauck/ SIC 8 (2) RFI design of qualified display processing system staff input received

)

SIC 8/A. Thadani J. Mauck/ SIC 8 Acceptability of isolation (3) between safety and non-safety safety systems.

Applicant action regtfired ENTB/C.Y. Cheng S. Lee /ENT8 (4) Pipe break criteria (GOC-4 Exemption) staff input received ESGB/G. Bagchi G. Staley/ESG3 (5) Sondex decommissioning Applicant action required SPLB/J. Craig C. Tinkler/SPL8 (6) Containment barrier isolation for reactor containment fan coolers component cooling water line.

Draft input received (7) Attachment of safety-related LQA8/A.B. Beach J. Spraul/LQA8 (SR) ductwork and cable trays to non-SR frames.

Applicant action required SPLB/J. Craig R. Fell /SPLB (8) Containment purge actuation on radiation release Applicant action required S. Hou/EME8 EME8/T. Marsh (9) Seismic qualification review team audit items A. Masciantonio/EMEB Applicant action required EME8/T. Marsh (10) Pump and operability audit items

.I

May 14o 1987

.g.

i Responsible Former Reviewer Status As Of May 11, 1987 Branch for Current Branch SE Input l

staff input required SPLB/J; Craig H. Walker /SPLB (11) Equipment qualification audit Applicant action required PRPB/L. J. Cunningham L. Brown /PRPB l

(12) Onsite meteorological measure ments program items l

(a) Comparison of new with old system I

(b) Measurements of precipi-tation to resolve anomalous and incon-sistent records Applicant action required A. Masciantonio/EMEB EMEB/T. Marsh l

(13) Completion of review of reports on pressure licant action required relief devices APP B. Mann/0TSB-E. Butcher SRXB/W. Hodges (14) Reanalysis of loss-of-l coolant accident during shutdown and analyses for 6-inch and 8-inch breaks.

SICB/A. Thadani J. Mauck/SICB

[pP r quired a

lcn ac (15) Interface between Class IE and non-1E circuits staff input required SPLB/J. Craig R. Giardina/QTSB (16) Procedures for preventive E. Butcher maintenance and opera-bility checks on emer-gency communication equip-ment staff input received SPLB/J. Craig R. Fell /SPLB (17) Process control program staff input required j

SPLB/J. Craig R. Fell /SPLB (18) Solid waste processing 1

^^

? fey 14, 1987 Responsible Former Reviewer Status As Of May ll,1987 Branch for Current Branch SE Input Staff input required G. Lapinsky/LHFB LHFBN. Regan (19) Procedures generation package Applicant action required B. Mann/0TSB-SRXBN. Hodges (20) Steam generator tube rupture E. Butcher staff input received R. Parkhill/RSIB RSIB/C. Haughney (21) Engineering assurance program (22) Electrical, instrumentation and control system audits Draft input received SICB/A. Thadani J. Mauck/ SICS l

(a) Fuses as isolator in essential cooling water control systems Staff input received

0. Chopra/SELB SELB/F. Rosa (b) 125 VDC power to relays staff input received l

SELB/F. Rosa

0. Chopra/SELB (c) Raychem splices Applicant action required SICB/A. Thadani J. Mauck/SICB f

(d) Separation within cabinets staff input required S. Saba/SELB LHFBN. Regan l

(23) Safety parameter display system SPL8/J. Craig A. Singh/fth staff input received audit items (24) Fire protecti6n audit F. Hebdon A. Toalston/SELB combination of staff and applicant action SELB/F. Rosa (25) Generic letter 83-28 J. Brammer/ILRB-Applicant action required l

EMEB/T. Marsh l

(26) BMI thimble vibration F. Hebdon staff input required

0. Chopra/SELB SELB/F. Rosa (27) Electric distribution system voltage (PS8-1)

, ffay 14, 1987 Responsible Former Reviewer Branch for Current Branch Status As Of May 11, 1987 SE Input staff input required SICS /A. Thadani J. Lazevnick/SELB (28) Barton differential pressure switch downgrade staff input received SPL8/J. Craig R. Fell /SPLB (29) HEPA filter acceptance criteria staff input received SIC 8/A. Thadani J. Mauck/ SIC 8 (30) Undervoltage/underfrequency TADOT Staff input received SRXB/W. Hodges L. Bell /ILRB (31) E Definition Applicant action required

0. Chopra/SELB SELB/F. Rosa (32) Battery charges W.LeFave/SPLB staff input received SPLB/J. Craig (33) Essential chilled water technical specifications l

.