Monthly Operating Rept for Oct 1986
ML20213H069
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/31/1986
From: Phillips M, Salvesen R
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8611190064
Download: ML20213H069 (6)


Text

_

o AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO.

so-15A UNIT Hnno Prook Gan. StatiOG DATE 11/.g.2/RK COMPLETED BY Miir o -ph4114ng TELEPHONE (699} 119_32.38 October 1986 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 233 1

17 0

321 2

__ _ _ = -

18 0

0 3

19 1

0 406 4

=

20 0

622 5

21 0

604 6

_ _ =

22

=__

0 655 7

23

__ _ = -

0 661 8

24 0

717 9

25 0

544 10 26 0

661 11 27

_ _ _ - - - -- =___

81 682 12

_ _ = _ _ _ _ _ -. - _ _ _ _ _ __

28 81 652 29 13 81 684 30 14 398 651 31 15 452 16 DAL1x MW b

24 y

\\\\

8611190064 861031 1 i PDR ADOCK 05000354 R

PDR

OPERATING DATA REPORT ONIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-354 UNIT NAME Bope Creek Gen. Station DATE 11/07/86 COMPLETED BY M. Phillips Oct '86 TELEPHONE (609) 339-3738 REPORT MONTH METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F FORCED

DURATION, REASON REDUCING CORRECTIVE ACTION /

NO.

DATE S SCHEDULED (HOURS)

(1)

POWER (2)

COMMENTS 15 10/1 S/F 210 B

2 Continued outage For Problem Resolution Loss of Power Test 9/11/.

16 10/12 S

24 B

2 Loss of Power Test, 17 10/10 F

19 B

3 SCRAM on Low Level while tuning Feed-water Controllers.

i

SUMMARY

]

OPERATING DATA REPORT DOCKET NO.

50-354 UNIT Hope Creek Gen. StatioE DATE 11/97/86 COMPLETED BY__ M.._Phillips TELEPHONE (6JJJ_JJJ-373_8 OPERATING STATUS 1.

REPORTING PERIOD Oqb__'JJ GROSS HOURS IN REPORTING PERIOD J_41__

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3_2JJ___

MAX. DEPEND. CAPACITY (MWe-Net) ___- - _ __ _ _

Iffl -

196]___

6 DESIGN ELECTRICAL RATING (MWe-Net) 3.

POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWe-Net)

____J[p.ng____

4.

REASONS FOR RESTRICTION (IP ANY)

THIS YR TO MONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL

_JJ_1_

JJJJ_

133]___ _

6.

REACTOR RESERVE SHUTDOWN HOURS O__

O_ _

__ _ _ J_

7.

HOURS GENERATOR ON LINE

_J2f_

_]33.

JJJ____

8.

UNIT RESERVE SHUTDOWN HOURS 0__

0 j

9.

GROSS THERMAL ENERGY GENERATED (MWH) 753_,JJJ Iajj2a 621_.1,J12aj21

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 213_,333 _JJ).,373___.2J3s33 4
11. NET ELECTRICAL ENERGY G'ENERATED (MWH) 211,333 _J33a673 2_41_.533
12. REACTOR SERVICE FACTOR
13. REACTOR AVAILABILITY FACTOR
14. UNIT SERVICE FACTOR
15. UNIT AVAILABILITY FACTOR
16. UNIT CAPACITY FACTOR (Using Design MDC)
17. UNIT CAPACITY FACTOR (Using Design MWe)
18. UNIT FORCED OUTAGE DATE
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY

_j/23231 INITIAL ELECTRICITY

_j13135_

COMMERCIAL OPERATION

_l2/l]/J6

SCHEDULED SHUTDOWNS (ITEM 19)

TYPE DATE DURATION 1

MSIV Isolation - Scram 12/91/86 2 days 2.

Load Rejection - Scram 12/94/86 4.5 days e

l i

i l

I

v HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

OCTOBER 1986 The beginning of October was spent resolving discrepancies discovered during the Sept. 11 Loss of Power test.

Reactor startup occurred on October 9 and the Loss of Power test was conducted successfully on October 11.

Startup then occurred on Oct.

12 to begin Test Condition 3.

Numerous power swings occurred due to equipment problems (TIP machines, Condensate Demineralizers, B

Secondary Condensate Pump, etc.) and planned tests.

A reactor scram occurred at 1558 on Oct.

18 due to low water level while performing tuning of the feedwater flow controllers.

Recovery was quick with startup occurring at 1943 on Oct. 19.

On October 39, Hope Creek surpassed its previous continuous run record of 11 days.

MP:tlb i

r k3PSIEG Fub!!c Service Electr!c and Gas Company P O Box L Hancocks Bridge. New Jersey 08038 Hope Creek Operations November 10, 1986 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for October are being forwarded to you.

Sincerely yours, R. S. Salvesen General Manager -

Hope Creek Operations WJM:tib Distribution CC Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures