Text
r
1
-
o,o
. . .
,
a
o
MAY 111987
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by M. Jordan,
R. Kopriva, and J. Malloy of this office on March 10 through April 24, 1987,
of activities at LaSalle County Station, Units 1 and 2, authorized by
Operating Licenses No. NPF-11 and No. NPF-18 and to the discussion of our
findings with Mr. G. Diederich at the conclusion of the inspection.
The enclosed copy of our inspection report identified areas examined during
the inspection. Within these areas, the insrection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Appendix. A written
response is required.
In addition, this report contains a description of an
Enforcement Conference conducted on April 24, 1987, regarding exceeding a
Technical Specification Limiting Condition for Operation (LCO). Communication
among the shift crew during the day shift was inadequate in that the Unit I
reactor operator and the instrument technician were unaware of the LCO. As
a result of the meeting on April 24, 1987, we have decided that escalated
enforcement action is not warranted at this time and we are issuing one
Severity Level IV violation.
However, further violations similar to this
could result in escalated enforcement action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
8705190058 870511
ADOCK 05000373
, o\\
G
gt
g.w-
~
P
'
j
,
f
Commonwealth Edison Company
2
MAY 111987
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
gegt s1GNED BY E. G. GREEIWli
Charles E. Norelius, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Reports
No. 50-373/870011(DRP);
50-374/870012(DRP)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Diederich, Plant
Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
David Rosenblatt, Governor's
Office of Consumer Services
p'
RIII
RIII
RII:,
g1
-
'^mW l?
&4f .
No[rellius
L
( 20 6
Ring /j)
Warnick