ML20213G662
| ML20213G662 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 05/11/1987 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20213G665 | List: |
| References | |
| NUDOCS 8705180391 | |
| Download: ML20213G662 (2) | |
Text
-
e MAY 111987 Northern States Power Company ATTN: Mr. C. E. Larson Vice President, Nuclear Generation 414 Nicollet Mall Minneapolis, MN 55401 Gentlemen:
SUBJECT:
EXAMINATION REPORT On March 23-27, 1987, the NRC administered examinations to employees of your company who had applied for licenses to operate your Prairie Island Nuclear Power Plant. At the conclusion of the examination, the written examination questions and answer key were given to members of your staff.
As stated in Section 2 of this report, generic weaknesses were noted during the administration of the simulator portion of the operating exam.
Please submit a response addressing the identified weaknesses to the Region III office.
The response should contain, as a minimum, your corrective action plan to address the identified weaknesses along with a date in which you will implement your proposed corrective action.
In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this examination, please contact us.
Sincerely, nricinal Stryd E7 C. U. IIchl Charles W. Hehl, Chief Operations Branch
Enclosures:
1.
Examination Reports No. 50-282/0L-87-01 No. 50-306/0L-87-01 2.
Examinations and Answer Keys See Attached Distribution f
RIII RIJI; RIJI I
RI
/
RII yh f
I 99 #
P 91
/t[L He 1 c
De Reidinger Lennjrtz
.I k
B705180391 870511 ADOCK0500g2
[
g DR
o.
Northern' States'PSwerCompany 2-ggy 1 11937 Distilbution cc w/ enclosures:
E. L.-Watzl, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Prairie Island Resident Inspector, RIII Monticello John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA State Liaison Officer, State of Minnesota T. E. Amundson, Superintendent of Training
-J. Hannon-Branch Chief, OLB D.DilannI
'T.-Guilfoil,ProjectManager,NRR Contract Exam Supervisor
.-