Text
'
MAY 0 71937 r
Docket Nos. 50-206 and 50-301 L
Pr. C. W. Fay, Vice President Nuclear Power Department l
Wisconsin Electric Power Company l
231 W. Michigan Street, Rocm 308 Milwaukee, Wisconsin 53201
Dear Mr. Fay:
SUBJECT:
ASPE SECTION XI RELIEF REQUEST - REGENERATIVE HEAT EXCHANGER (TACS l
63371AND63372)
By letter dated October 27, 1986, you submitted a relief request from the examination requirements of Section XI of the ASME Boiler and Pressure Yessel Code for the shell-to-tubesheet and nozzle-to-shell welds in the regenerative l
heat exchangers at Point Beach Nuclear Plant, Units 1 and 2.
The requested relief has been granted. The basis for granting of the relief has been discuned in the enclosed Safety Evaluation.
Based on our review, we have determined that the testing for which the relief has been requested and approved is impractical to perform and that pursuant to 10 CFR 50.55a(g)(6)(1) the granting of this relief is authorized by law and will not endanger life or property or the couren defense and security and is otherwis? in the public interest.
In making this determination, we have given due consideration to the burden that could result if these requirements were imposed on your facilities.
If you have any questions, contact D. Wagner at (301) 492-8158.
l
/s)
David L. Wigginton, Acting Project Director Project Directorate III-3 Division of Reactor Projects
Enclosure:
As Stated cc: See next page U""'j PD/
III-3 Office:
LA/PDHI-3 PM/PDIII-3 0C Surname: P)Mtitzer DWagner/tg DWigginton Date:
't4/5 /87 05/6/87 b/87 05/f/87 0705100343 E70507 ADOCK0300g6 DR
MAY 0 71987 c
gg Copies:
NRC PDR Local PDR PDIII-3 r/f PDIII-3 p/f GHolahan PKreutzer DWagner DWigginton OGC-Bethesda DHagan EJordan JPartlow TBarnhart(4)
WandaJones EButcher (PrincipalContributorofSE)
ACPS(10)
GPA/PA
' ARM /LFNB i
i I
i 4
I
i-Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M. Street, N.W.
Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Connission of Wisconsin Hills Fams State Office Building Madison, Wisconsin 53702 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241