ML20213G532

From kanterella
Jump to navigation Jump to search
Forwards Amend 87 to License DPR-61 & Safety Evaluation. Amend Modifies Tech Spec Section 4.10.C to Increase Frequency of Each Pump Flywheel Insp to Include Ultrasonic Volumetric Exam of Bore & Keyway Areas at 3-yr Intervals
ML20213G532
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/12/1986
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20213G533 List:
References
NUDOCS 8611180186
Download: ML20213G532 (4)


Text

  • %.am

o UNITED STATES

+

8 k

NUCLEAR REGULATORY COMMISSION r,,

a wAsmNGTON, D. C. 20555

%**..+)

November 12, 1986 Docket No. 50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

TECHNICAL SPECIFICATIONS FOR INSERVICE INSPECTION OF REACTOR COOLANT PUMP FLYWHEELS Re:

Haddam Neck Plant The Comission has issued the enclosed Amendment No. 87 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated September 4,1986.

This license amendment modifies Section 4.10.C of the technical specifications to incorporate inservice inspection surveillance requirements for the reactor coolant pump (RCP) flywheels consistent with the guidance found in Regulatory Guide 1.14, Revision 1.

In particular, this amendment would increase the frequency of each pump flywheel inspection to include an ultrasonic volumetric examination of the bore and keyway areas at approximately 3-year intervals and a surface examination and 100% volumetric examination at approximately 10-year intervals. The present technical specifications require only a surface examination and volumetric examination of only one reactor coolant pump every second outage.

A Notice of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested action was published in the Federal Register on October 8, 1986 (51 FR 36086). No comments or requests for hearing were received.

8611180186 861112 PDR ADOCK 05000213 P

PDR

- A copy of our related Safety Evaluation is enclosed. This action will appear in the Commission's biweekly notice publication in the Federal Register.

Sincerely, d<o JYll.Wo Francis M. Akstulewicz, Jr Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

1.

Amendment No. 87 to License No. DPR-61 2.

Safety Evaluation cc w/ enclosures:

See next page j

- - < ~

Mr. John F. Opeka A copy of our related Safety Evaluation is enclosed. This action will appear in the Commission's biweekly notice publication in the Federal Register.

Sincerely, Original signed by Francis Akstulewicz Francis M. Akstulewicz, Jr Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

1.

Amendment No. 87 to DISTRIBUTION License No. DPR-61 T2 Docket-File 2.

Safety Evaluation NRC PDR~

~

ACRS(10)

TBarnhart Local PDR ELJordan cc w/ enclosures:

ISAP Reading BGrimes See next page NSIC JPartlow RDiggs LJHarmon FMiraglia WRegan

'PAnderson WJones FAkstulewicz CMiles (OPA)

MBoyle AWana 0GC-B CGr1Mes TSullivan GJohnson

((( k b

m.

ISAP:DPL-Bh ISqP:kQ-B DPL-A:PAEB DPL-A:P EB B

FAkstulewicz:mn PAnde'7 son "efGJohnson TSullivan 10/jy/86 10/4 /86 10/7tf86 10/20/86 0

86 i

ISAP:DPL-B CGrimes 1$/(2,/86

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN:

Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

_