Forwards Safety Insp Repts 50-277/87-07 & 50-278/87-07 on 870201-0313 & Notice of Violation.Weaknesses in Program Implementation Noted,Including Radiation Work Permit Sys & Uncorrected QA Program Audits.Response Requested
ML20213G530
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/12/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20213G534 List:
References
NUDOCS 8705180333
Download: ML20213G530 (2)


See also: IR 05000277/1987007

Text

,

9

i

e

12 MAY 1987-

Docket Nos.'50-277/0PR-44

50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. J. W. Gallagher

Vice President

Nuclear Operations

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspections 50-277/87-07; 50-278/87-07

This transmits the findings of the routine safety inspection by Mr. T. P. Johnson

and others on February 1 to March 13 1987, at the Peach Bottom Atomic Power

Station, Delta, Pennsylvania. These findings were based on observation of

activities, interviews, measurements and document reviews, and have been

discussed with Mr. R. S. Fleischmann of your staff.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with letter. Based on the results of this

inspection, it appears that one of your activities in the radiological controls

area was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

This violation

has been categorized by severity level in accordance with the revised General

Statement of Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2,

Appendix C (Enforcement Policy 1986).

During this inspection period, an indepth review of the radiological controls

area was conducted by a regionally-based specialist inspector. A number of

weaknesses were observed in the implementation of your overall program. Spec-

ifically, the inspector noted that:

(1) your radiation work permit system had

significant weaknesses (Paragraphs 9.4.1,9.4.2);(2) deficiencies noted in

Quality Assurance department audits had gone uncorrected for over a year (Para-

graph 9.2); (3) there was a perception that operations department personnel

would not respond to Health Physics deficiencies (Paragraph 9.1.4); (4) the

performance of surveys and the use of alarming dosimeters in high radiation

areas were weak (Paragraphs 9.4.3,9.4.4).

- -

In addition to responding to the violation in Appendix A, we request that you

provide your plans and specific corrective actions for the above identified

items.

8705180333 870512

PDR

ADOCK 05000277

G

PDR

'

OFFICIAL RECORD COPY

CIR PB 87-07 - 0001.0.0

05/11/87

.

g

Philadelphia Electric Company

2

a

gg

We appreciate your cooperation.

Sincerely,

glaim45.ip*4#X&

William F. Kane, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A, Noti::e of Violation

2.

NRC Region I Combined Inspection Report Nos. 50-277/87-07 and 50-278/87-07

cc w/encls:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Senior Vice President, Engineering and Production

S. J. Kowalski, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

G. Leitch, Nuclear Generation Manager

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1s:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encis)

C. Cowgill, Section Chief, DRP

M. Shanbaky, Chief, FRPS, DRSS

SRI, Limerick I

J. Wiggins

SRI, Pilgrim

W. Russell

T. Martin

R. Bellamy

N

Ri:

S

RI:DRSS k RI. R

RI:0R

PRI:DRPC

RI DRP

R

Weadock/mjd

Shanbaky

Kra

oulos Williams Johnso

Linville Gal o

M/3 -

5/7/87

5/f /87

5/ /8

5/f/87

5/$/87

5/f/87

5/h/87

g

0FFI IAL RECORD COPY

CIR PB 87-07 - 0002.0.0

05/08/87