Forwards Insp Rept 50-424/86-46 Re Detailed Review,Insp & Verification of Facility Readiness Review Module 6 Concerning Electrical Equipment.Program Acceptable W/Exception of Areas Identified in Rept
ML20213G394
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/10/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20213G396 List:
References
NUDOCS 8611180076
Download: ML20213G394 (3)


See also: IR 05000424/1986046

Text

e

-

,

& G

-

3

-

._

,NOV 1 0 W

,

Docket No. 50-424

License No. CPPR-108

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 6,

ELECTRICAL EQUIPMENT - REPORT N0. 50-424/86-46

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on March 19, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews also were conducted in NRC Bethesda offices and the findings

from these reviews have been discussed with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The results of the Module No. 6 reviews and inspections are summarized as a single

Inspector Followup Item. The item was closed prior to the release of the report.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the applicant's activity control programs for the

implementation of the design and construction requirements for Category 1E

Electrical Equipment at Vogtle Unit No. 1 are acceptable and comply with applicable

regulatory requirements with the exception of those items or areas identified in

the Report.

This decision is based on information currently available to the

inspectors and reviewers.

Should information subsequently become available which

was not considered during this review or which conflicts with earlier information,

it will be evaluated to determine what effect it may have on the above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8611100076 861110

ORIGifus E m gy,

4

PDR

ADOCK 0500

& NELS03 GMCE

'

G

J. Nelson Grace

Regional Administrator

,

Enclosure:

i

Report No. 50-424/86-46

cc w/ enc 1:

(See page 2)

MOl

.

-.

.

NOV 101986

o

.

Georgia Power Company

2

gcc w/ encl:

4J. P. O'Reilly, Senior Vice President

Nuclear Operations

}R.E.Conway,SeniorVicePresident&

,j

Project Director

ND. O. Foster, Vice President, Project

g'P.D. Rice,VicePresident, Project

Support

Engineering

< R. H. Pinson, Vice President, Project

}J.T.Beckham,VicePresident&

Construction

General Manager - Operations

R. A. Thomas, Vice President,

Licensing

dD.S. Read,GeneralManager,

g

Quality Assurance

NC. W. Hayes, Vogtle Quality

Assurance Manager

N W. C. Ramsey, Manager -

!

t

Readiness Review

4 G. B. Bockhold, General Manager,

Nuclear Operations

bl.Gucwa, Manager,NuclearSafety

and Licensing

'

gM.H.Googe, Project

Construction Manager

E. D. Groover, Quality

Assurance Site Manager -

k. Construction

A. Bailey, Project Licensing

Manager

G. F. Trowbridge, Esq., Shaw,

,

!

x

Pittman, Pptts and Trowbridge

i

4B. W. Churchill, Esq., Shaw,

\\

Pittman, Potts and Trowbridge

9 . L. Blake, Jr., Esq., Shaw,

M.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

J. G. Ledbetter, Commissioner,

I

k.Dep.rrtment of Human Resources

H. Badger, Office of Planning

\\

and Budget

M . Kirkland. III, Counsel,

Office of the Consumer's Utility

Council

cc w/ encl cont'd on page 3

l

t

i

I

._-

-

- .__

. - -

.__

_

-

_ . _ -

.

_.___

- _ _ - _ . _

._

_.

..

~.

NOV 10 ESS

.

.

Georgia Power Company

3

't

_lec w/ encl:

(cont'd)

ND. Feig, Georgians Against

]M.B.Margulies,Esq., Chairman,

Nuclear Energy

Atomic Safety and Licensing Board

\\

Panel

4 Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

\\

Panel

4 G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

kB. P. Garde, Citizens Clinic, Director

Government Accountability Project

\\becw/ encl:

4 E. Reis, GS0

W. M. Hill, IE

M. Miller, NRR

M.Brach,GS0

4. Sinkule, RII

. Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

RIIq,[

RII

h

RII

RII

RII

RII

lon

ARHerdt

V

ciera

MSinkule

VLBrownle#

b't' '

" '**da//l

%g'46

,/,/,;

'

""2 ' 6

.

,

,

'

y,t/6 f**

ILW6 /cv

,f

al ke' .

TNovaK

B ires

EChriste6 bury

f/[/6

D9/ /86

09

/86

n/sys

njp/86

'

.0&f