| ML20213G394 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/10/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20213G396 | List: |
| References | |
| NUDOCS 8611180076 | |
| Download: ML20213G394 (3) | |
See also: IR 05000424/1986046
Text
e
-
,
& G
-
3
-
._
,NOV 1 0 W
,
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 6,
ELECTRICAL EQUIPMENT - REPORT N0. 50-424/86-46
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on March 19, 1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews also were conducted in NRC Bethesda offices and the findings
from these reviews have been discussed with your staff.
Areas contained in the module, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The results of the Module No. 6 reviews and inspections are summarized as a single
Inspector Followup Item. The item was closed prior to the release of the report.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's activity control programs for the
implementation of the design and construction requirements for Category 1E
Electrical Equipment at Vogtle Unit No. 1 are acceptable and comply with applicable
regulatory requirements with the exception of those items or areas identified in
the Report.
This decision is based on information currently available to the
inspectors and reviewers.
Should information subsequently become available which
was not considered during this review or which conflicts with earlier information,
it will be evaluated to determine what effect it may have on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8611100076 861110
ORIGifus E m gy,
4
ADOCK 0500
& NELS03 GMCE
'
G
J. Nelson Grace
Regional Administrator
,
Enclosure:
i
Report No. 50-424/86-46
cc w/ enc 1:
(See page 2)
MOl
.
-.
.
NOV 101986
o
.
Georgia Power Company
2
gcc w/ encl:
4J. P. O'Reilly, Senior Vice President
Nuclear Operations
}R.E.Conway,SeniorVicePresident&
,j
Project Director
ND. O. Foster, Vice President, Project
g'P.D. Rice,VicePresident, Project
Support
Engineering
< R. H. Pinson, Vice President, Project
}J.T.Beckham,VicePresident&
Construction
General Manager - Operations
R. A. Thomas, Vice President,
Licensing
dD.S. Read,GeneralManager,
g
Quality Assurance
NC. W. Hayes, Vogtle Quality
Assurance Manager
N W. C. Ramsey, Manager -
!
t
Readiness Review
4 G. B. Bockhold, General Manager,
Nuclear Operations
bl.Gucwa, Manager,NuclearSafety
and Licensing
'
gM.H.Googe, Project
Construction Manager
E. D. Groover, Quality
Assurance Site Manager -
k. Construction
A. Bailey, Project Licensing
Manager
G. F. Trowbridge, Esq., Shaw,
,
!
x
Pittman, Pptts and Trowbridge
i
4B. W. Churchill, Esq., Shaw,
\\
Pittman, Potts and Trowbridge
9 . L. Blake, Jr., Esq., Shaw,
M.Pittman,PottsandTrowbridge
E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
J. G. Ledbetter, Commissioner,
I
k.Dep.rrtment of Human Resources
H. Badger, Office of Planning
\\
and Budget
M . Kirkland. III, Counsel,
Office of the Consumer's Utility
Council
cc w/ encl cont'd on page 3
l
t
i
I
._-
-
- .__
. - -
.__
_
-
_ . _ -
.
_.___
- _ _ - _ . _
._
_.
..
~.
NOV 10 ESS
.
.
Georgia Power Company
3
't
_lec w/ encl:
(cont'd)
ND. Feig, Georgians Against
]M.B.Margulies,Esq., Chairman,
Nuclear Energy
Atomic Safety and Licensing Board
\\
Panel
4 Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
\\
Panel
4 G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
kB. P. Garde, Citizens Clinic, Director
Government Accountability Project
\\becw/ encl:
4 E. Reis, GS0
W. M. Hill, IE
M. Miller, NRR
M.Brach,GS0
4. Sinkule, RII
. Christnot, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
RIIq,[
RII
h
RII
RII
RII
RII
lon
ARHerdt
V
ciera
MSinkule
VLBrownle#
b't' '
" '**da//l
%g'46
,/,/,;
'
""2 ' 6
.
,
,
'
y,t/6 f**
ILW6 /cv
,f
al ke' .
TNovaK
B ires
EChriste6 bury
f/[/6
D9/ /86
09
/86
n/sys
njp/86
'
.0&f