ML20213G067
| ML20213G067 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/12/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20213G069 | List: |
| References | |
| NUDOCS 8611170309 | |
| Download: ML20213G067 (2) | |
See also: IR 05000245/1986019
Text
i
-
.
.
NOV 121986
Docket Nos. 50-245; 50-336
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Combined Routine Inspection 50-245/86-19; 50-336/86-21 (9/30/86 - 11/3/86)
This refers to the above subject resident inspection of Millstone Units 1 and 2.
The inspection findings have been discussed with Mr. Romberg of your staff.
No
violations were identified and no reply to this letter is required.
Your cooperation with us is appreciated.
Sincerely,
.Drisical S3
'
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Report 50-245/85-19; 50-336/86-21
cc w/ enc 1:
E. J. Mroczka, Vice President, Nuclear Operations
W. D. Romberg, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
8611170309 861112
ADOCK 05000245
Q
-.s c a l
_ _ _ _ _ _ _ _ _ _ _ _ _ _
..
.
Northeast Nuclear Energy Company
2
NOV 12 m
bec w/ enc 1:
Region I Docket Room (with concurrences)
Managem a t Assistant, DRMA (w/o enc 1)
DRP Section Chief
M. McBride, RI, Pilgrim
P. Swetland, SRI, Haddam Neck
J. T. Shedlosky, SRI, Millstone 3
J. Shea, LPM, NRR
Robert J. Bores, DRSS
C. Anderson, DRS
J. Johnson, DRS
l
l
!
I
l
RI:DRP
RI:DRP
RI
D
hnznger
Rebe o
1/meo
Mc be
11(f/86
n (&
y
0FFICIAL RECORD COPY
-_
_ _ _ _ _ _ _ _ - _ _ _ _