ML20213F638

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-52 & 50-457/86-40 on 860915-1023 & Notice of Violation
ML20213F638
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/12/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20213F639 List:
References
NUDOCS 8611140360
Download: ML20213F638 (2)


See also: IR 05000456/1986052

Text

{{#Wiki_filter:-w ( NOV 131986 Docket No. 50-456 Docket No. 50-457 Corr 4ronwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen: This refers to the routine and reactive safety inspection conducted by Messrs. A. Dunlop, Jr. , M. Ring, S. DuPont, F. Maura, C. Vandenburgh, M. Farber, and Ms. B. Azab of this office, and Messrs. B. Gunther and B. Shirer, of Brookhaven National Laboratory, on Septerrber 15 through October 23, 1986, of activities at the Braidwood Station, Units 1 and 2, authorized by NRC Operating License No. NPF-59 and Construction Permit No. CPPR-133 and to the discussion of our findings with Mr. M. J. Wallace at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective exam- ination of procedures and representative records, observations, and interviews with personnel. During this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice. A written response is required. Since the questions addressed in example (a) to the violation appear to be applicable to Unit 2 and Byron Station Units 1 and 2, your response should also address the corrective actions necessary for these units. In accordance with 10 CFR 2.790 of the Coninission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, t , '

l 8611140360 861112 I ( PDR ADOCK 05000456 - fGd I G PDR l

. D , Co monwealth Edison Company 2 NOV 12 1986 We will gladly discuss any questions you have concerning this inspection. Sincerely, Original signed by N. J. Chrissotimos for C. J. Paperiello, Director Division of Reactor Safety Enclosures: 1. Appendix, Notice of Violation 2. Inspection Reports No. 50-456/86052(DRS); No. 50-457/86040(DRS) cc w/encls: D. L. Farrar, Director of Nuc! ear Licensing M. Wallace, Project Manager D. Shamblin, Construction Superintendent E. E. Fitzpatrick, Station Manager P. L. Barnes, Regulatory Assurance Supervisor DCS/RSB (RIDS) Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron Phyllis Dunton, Attorney General's Office Environmental Control Division D. .l. Cassel , Jr. , Esq. J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division E. Chan, ELD J. Moore, ELD G. Berry, ELD J. Stevens, NRR The Honorable Herbert Grossman, ASLB The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB RII RIII RIII Rll RllI RII RIl - R II Or 419 ok) W -{n 6thL T (t 'A Dunlop/lc 6uYont VanDenburgh Maura Azab Ring Gar r ehl 11/ /86 g gl[E R RI Farber Pa eriello }}