ML20213F577
| ML20213F577 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/10/1986 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp |
| Shared Package | |
| ML20213F579 | List: |
| References | |
| NPF-05-A-068, TAC 62030 NUDOCS 8611140307 | |
| Download: ML20213F577 (12) | |
Text
n.
~.
/
UNITED 8TATES 8
NUCLEAR REGULATORY COMMISSION o
5 E
WASHINGTON, D. C. 20665
\\,...../
i GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION liUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET N0. 50-366 EDWIN 1. HATCH NUCLEAR PLANT, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 68 License No. NPF-5 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(thelicensee)datedJuly 18, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:
?Dk*l09CK05000366 07 861110 P
. (2) Technical Specifications The Technical Specifications contained in Appendices A & B, as revised through Amenment No.68, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY C0Hf11SSION k' Am A{
v Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: November 10, 1986
ATTACHMENT TO LICENSE AMENDMENT N0.68 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
Remove Insert 3/4 6-20 3/4 6-20 3/4 6-22 3/4 6-22 3/4 6-23 3/4 6-23 3/4 6-26 3/4 6-26 3/4 6-27 3/4 6-27 3/4 6-29 3/4 6-29 3/4 6-30 3/4 6-30 3/4 6-31 3/4 6-31 3/4 6-32 3/4 6-32 i
-,:----. +,.-
- - ~ - - - - - - -
J AR_LLidt,J,,1,.1Cofit I,fluedj N
- x PRIMARY COf{iAINMENT I SOL AT IONJALVES ro ISOLATION TIME
{
x VALVE FUNCTION AND E BE yALVE CROUP
- f (Seconds) f B
e to A.
Au_lomatic isolation Valves (Continued)
U c "g$
lis. Drywell vent and Purge System Isoistion
-i Valves 2 Tiss-F 307 6
5 2188-F308 6
5 4
5 i
2 I ts S-F 10fs 6
5 2188-F118A 6
5 8
5 2 it:8-F 32fs 6
5 218 8-F319 6
5 1
2188-F320 6
5 8
2188-F3fs0 6
to 4
21f 8-F3fs t 6
10 2il:8-F33fs A 6
3 218so-F33fs B 6
3 2Tf8-F335 A 6
3 4
2Tf8-F335 B 6
3 4
15.
Drywell Pneumatic System isolation g
Valves 2P70-F002 6
5 7
5 N
O 16.
Fission Products Monitoring System Isolation Valves i
2011-F050 6
5 2Dil-F051 6
5 2011-F052 6
5 2D11-F053 6
5 f
i Proposed TS/00fs0g/188 f*8 See Specification 3.3.2, Table 3.3.2.1, For isolation signals that operate each valve group.
I
v V
YABLE A U -1 iContinued1 k
g PRIMARY CONTAINNENT I S0l Ail 0'LVAL.VES
-4 ISOLATION TIME c6 r3 VALVF FUNCTION ANO. NUMBER V.ALVE_ CROUP'*8
__[Segonds}___
ac py e
A.
Automatic isolation Valves (Continued)
Eh 21.
Core Spray System Flow Test Line g
[j Isolation Valves o
os to 2E21-F015 A So os 2E21-T015 B 50 22.
Suppression Pool Vent and Purge System Isolation Valves 2T48-F338 10 5
2148-F339 to 5
2T48-F318 to 5
2148-F326 10 5
2T48-F332 A 10 3
2T48-F332 B 10 3
2T48-F333 A 10 3
2148-F333 R 10 1
3 23.
RilR Shutdown Cooling Suction Isolation Velves 18 2E11-F006 11 24 s
h 3
l-CN
)
to hJ
}
s i
\\
s s
~
-}
g i
3 s
v
~
r l.
)
~
T d
Proposed TS/0040g/188 See Spectrication 3.3.2, Table 3.3.2-1, For Isointion signnis that operat'e each' valve group 8*8
' Closes upon actuation of Core Spray via a liigh drywell pressure signal (see item 1.b or Table 3.3.3-1) or a Low Low Low (Level 1) signal from 2021-N691A,B,C,0 (see item 1.n or inble 3.3.3-1).
a g
TABLE 3.6,3-1 (Continuedl
{
gc PRIMARY CONTAINMENT ISOLATION VALVES
-4 N
e4 ISOLATION TIME c
3:
VALVE FUNCTION AND NUMBER VALVE GROUP'*'
__11egonds) e Z
A.
Automatic isolation Valves (Continued) c:
U5 24.
Traversing Incore Probe Isolation Va t*.a
-4 em Ball Valves NA DD no 25.
Vacuum Roller isolation Valves 2T48-F309 6
5 2T48-F324 6
5 26.
H PCI Pump Suction isolation Valve 2E41-F042 3
84 i
N b
0 Proposed TS/OO404/188 8*8 See Specification 3.3.2, Table 3.3.2-1, for isolation signals that operate each valve group.
- Closes upon withdrawal of TIP.
T I P automa t ic wi thd rawa l is actuated by either low reactor vessel water level or high drywell p res su re.
4
--Ei T AB LE_3. 6. 3-1 LCqntinuedl
_ y jE PRIMARY CONTAINMENT ISOLAll0N VALVEJ n.
~4 g {}
VALVE FUNCTION AND NUMBER Ne R.
!!AMUAt ISOLAT10N VALVES'** (Continued)
- 14.
Nitrogen intet isolation valves 2T48-F113 as 2T48-F114 00 r0 15.
RCIC pump suction isolation valves 2E51-F003 2E51-F031
~
16.
RilR pump stection isolation valves 2 Ell-F00'aA, D, C, D 17.
Vacuum reller isolation valves 2T48-I310 2if8-F311 4
18.
Vacutem reller Instrumentation line Isolation valve 218s 8-F36f A, 8
19.
Torus water level Instrismentation tino isolation valves 2T48-361 A, B 2T48-362 A, B w
- s 20.
HPCI pump suction isolation valve 2E41-F051 os g3 21.
Core spray pump suction isolation valves en 2E21-F001 A, B Proposed TS/00r:0g/188
TABLE 3.6.3-1 (Continued]
k ta PRIMARY CONTAINMENT ISOLATION VALVES D
at
$ El VALVE FUNCTION AND NUMBER l}
m r3 N
UC B.
MANUAL ISOLATION VALVES (Continued)
[t e
22.
FPM sample isolation valves cse 2D11-F058 q
2D11-F065 as l
co no 23.
Torus purlFication suction isolation valves 2C51-F002 24.
RHR relief valve discharge isolation valve 2E11-F103 A, B
25.
Nitrogen makeup Isolation valves 2T48-F115 2T48-F116 26.
Core spray test line isolation valves 2E11-F007 A.
B to N
T to N
3-Proposed TS/0040q/188
s 6
80e N
D CeoO NM a
e o
w
=
T en a
en g
C e
a e
e
=>
o CL a
o c
6 L
a c
C C
C a
e C
ee
.s.
a C
a e
0 er s
en m
a C
C tot C
e c
C
=
C C
e 0-4
~
c C
a M >
c C
e c
T' C
C o
s' E
=
3' O*
a c
~
c
=
a en a
. Ci
>l
.a C
e e
a a
- (I C
C C
C C:
-.L c
a en C
e O C; E
a U,
Mi c
E
)
6 y
e 6
=.
M E
C C
9 to 3
e 6
.C erp wi
.c.
.c.
a a
.I E'
e C
e 6
.E C
.C
-C sa 6
c a
(
a c
e C
a E
Z e4 6
3 CL
=
J.
O c
=
C 6
E O a
6 en c
a e
c (l
T CL en E
se c
6
- = f >
C e
3 C
0 E
- C 6
6 O
C C
L M
e E
a M
=
e c
C 6
C E
C 0
m
-CQCC
=c C
A C
e e
o e
.o.-
en m
).... en. -
.o 0000O WQ u a
6 e
M E
E b.... CL. -
T C
e CL C
.en G
w J
c....
C.
e C <
CE c<<
-((44
-4
> Q T >
C C
C P. N O e
5
-o
-me o.- N m a
e--
a eden-2 2 de doo EP. h N N Ee 6CC e - en c e C
so eco a 0 w e. w000 ec 3 *. m C000
.1C Q
=
-n
-ww c
cw CL6 6 e
6mw=
0 Z >
3e 3e e we e e a we e a 6
e e e e e
(
(
o-o--
- ---- *- ~ ~ - = ----
4 J
km kmm NNNN EDD e NNNN o
2 o
- cD -mm Comme ow ou = w D m cc o
M on omm
-m
- a. m m e mumm
.umum o
o 6
o D
E E
E E
>=
A o
E b
r w
m z
a e
=
o r~
e m
o n
e w
a x
.J w
(
u HATCH - UNIT 2 3/4 6-29 Amendment No. 68
e
@e N
cP Oa OO NM>
Ve m
Oa O
6 L
=
e
-m C>
~
D -
p e
m W
=
W w
C 0
=
.2(
M =
e
=
e e -
C a
2 a
C C
s}' -
. ~
w a
O e
C
~l e
L 03 m
e (
C c}
C J
Q Oi
. C C
=
O r
e e
a>
w E
C C
C
.=
C C
C O
C m
w J =
=
c
=
a a
=
X e
e 3
e
= a C
e m
(
0 t
-C e
= c 0
=
=
e a
e
. E C
=
C W
E O
C a
C
.t J
O 6
e O
e a U a
e
= a C
d C
(
t C
m C
a C>
c -
-E C
m 2
o 4
C w
E e
C w
C M
E o
W O
6 m
C
=
C
-OOO O
C M
C L
o e m
O e
.o e... m.
6 e
e MUUU GU G 9
C e
C 6
6 C
e e
- a.
2 O
E O
w m iD e C
MC O
3 ID ED CD e em
.e m
c.
>=
e 6
e>
w J
6 C
c.
g a
c 4
m<<<
-4 64 -
m
(<<<
w<
-e X
e a
=
C e
ay b
C - m ch e
e cre e.
- - m e en th
-e E
E
-+@n EN > > =
-OO 22:23
-N E
O COO eo eo
-OO
=OO000 G m.
- o. n
.K U O
a-6 e
l...
=
a m
(
(
o--
.- ---- Se
.C o m-J aNNN a
N tE
-NNNNN 02 o
E C
mee
-w ow Cou mmmmm s-T o
n.munum um 2
u.num ou 6m
,e u m m
e e
ou
=
o e
m
-e o
e 66
=
w e
C
.x
==
- m. e O
m a
e e
en e
W ou x-a w(
51 c.
HATCH - UNIT 2 3/4 6-30 Amendment No. 68
,r-TABLE 3.6,3-1 icontinued) g-
- t 2$
PRIMARY CONTAINMENT ISOLATION VALVES n
- D r)
, Q UC VALVE FUNCTION AND NUMBER 1 e4 e
, y3 C.
OTHER ISOLATION VALVES (Concinued) c.
Z 53 19.
RHR pump suction relief valves
,0
-4 2E11-F030 A, B, C, D to
, c' 20.
RHR test line isolation valves O'
2E51-F021 2E11-F025 A B
2E11-F029 'I 8
2E41-F046 2E11-F097
I 21.
RCIC turbine exhaust isolation valves 2E51-F001 2E51-F040 22.
RCIC turbine vacuum pump discharge isolation valves 2E51-F002 2E51-F028 23.
HPCI turbine exhaust isolation valves 2E41-F021 2E41-F049 c,
35 en O
i
)
Proposed TS/0040q/188 III Pressure reg ler valve.
k TABLE 3.6.J-1 (Continued)
Sb PRIMARY CONTAINMENT ISOLATION VALVES L
@ :it x:
VALVE FUNCT10N AND NUMBER et C.
OTHER ISOLATION VALVES (Continued) g O
C" 33 24.
HPCI exhaust drain isolation valves m
-4 2E41-F022 oo 2E41-F040 pg 25.
RHR reller valve discharge isolation valves 2E11-F055 A, B
RV'J' RV'J' 2T49-F009 A, B 26.
Core spray test line isolation valves 2E21-F036 A, B
2E21-F044 A, B
27.
Control air to vacuum breakers isolation valve 2T48-F342 A, B,C, D E, r,G, H,1,J. K, L 28.
Torus to drywell vaccom breaker nir cylinder 2T48-F323 A,B,C,D,E,r,G,H,1,J,K,L t
29.
Suppression pool purification system suction line blind riange 2051-D001 c.a 32 30.
Suppression pool vent and purge system supply line blind riange 2T48-D006 da 31.
RHR head spray isolation valve h3 2E11-F023' j
B
.l l
i i
y 0040q
' ' ' P re s su re re l i e r va l ve.
' J ' T he rma l reller valve.
Deactivated and locked in the closed (isolation) position.
Proposed TS/0040g/188 V