Text
-
a ue
[
~%
UNITED STATES E"
NUCLEAR REGULATORY COMMISSION o
h WASHINGTON, D. C. 20565
\\...../
November 6,1986 Docket No.
50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
p
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION ON INSERVICE 4
INSPECTION RELIEF REQUEST FOR CODE CATEGORY B-J j
WELDS FOR HADDAM NECK POWER PLANT i
By letter dated September 16, 1986, Connecticut Yankee Atomic Power Company requested relief from certain Code Category B-J weld inservice inspection requirements which had been determined to be impractical to perform at the Haddam Neck Plant during the second ten-year inspection interval. The staff has reviewed your request and concluded that insufficient information is available to determine whether relief is justified. The staff requests the following additional information:
(1) If the Section XI Code-required examination could not be performed because of a limitation or obstruction, provide a detailed written description of the limitation or obstruction and/or drawings or sketches showing the specific limitation or obstruction for each weld (or a group of similar welds) for which relief is requested.
(2) Provide an estimate of the percentage of the Code-required examina-tion that was completed on each weld for which relief is requested.
(3) For each weld for which the Code-required examination could not be performed because the weld crown was as-welded, provide justification why weld preparation is impractical.
In order for us to complete our review in a timely fashion, we request that the requested information be provided within 60 days of receipt of this letter.
$$kNDO k3 P
)
i
, _, _. _ _ _ _. _, _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _,.... _ _ _ _ _ _. _ _.. _. ~. _ _. _ _ _. _,,.. _.. _ _
a 2-The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, M
Francis M. Akstulewicz Integrated Safety Assessment Project Directorate Division of PWR Licensing - B cc: See Next Page l
l 1
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station clo U.S. NRC P. O. Box 116 East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
November 6,1986 The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Original signed by: F. Akstulewicz Francis M. Akstulewicz Integrated Safety Assessment 4
Project Directorate Division of PWR Licensing - B cc: See Next Page DISTRIBUTION Q Docket f u e a J. Partlow NRC PDR N. Thompson Local POR F. Akstulewicz ISAP Reading P. Anderson FMiraglia ACRS (10)
OGC-Bethesda C. Grimes i
E. Jordan B. Grimes f
j s.
1 I
4 l
i ISAP:DPL-B Uh IS/
DP B ISAP:DPL-FAkstulewicz:lt PAnderson CGrimes 11/y/86 11/L/86 11/ (,/86 1