N g.3 liovember 10, 1986 HRC/TMI-86-107 HEF4RNiDUli FOR:
liarold R. Denton, Director Office of Huclear Reactor Regulation Frank J. Iliraglia, Director Division of PUR Licensing-B FRON:
Williaa D. Travers, Director THI-2 Cleanup Project Directorate
SUBJECT:
liRC THI-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS REPORT FOR NOVEL!BER 3 - 9, 1986 1.
DEFUELIfiG Approxiaately 200 lbs. cf naterial was renoved from the test pattern area following partial drilling of fuel pins. Drilling of the hard crust at the top of the remaining core naterial continued. Thus far 245 holes have been drilled in the crust out of a total of 421 planned for the current drilling evolution.
Preparation of canisters is in progress for the next shipnent of fuel to the storage facility at the Idaho National Engineerir.g
' aboratory.
2.
EilVIRONMEt TAL !!OilITORING US Environmental Protection Agency (EPA) sanple analysis results show that THI site liquid effluents are in eccordance with regulatory limits, fiRC requirenents, and The City of Lancaster Agreement.
The Lancaster water sanple taken at the water works river intake and analy::cd by EPA consisted of a seven day ccaposite sample taken October 19 - 25, 1986. A gama scan detected no reactor related activity.
THI wate' scaples taken by EPA at the plant discharge (includes Uni te, 1 and 2) to the river consisted of seven daily ccaposite sanples taken froa Octcber 18 - 29, 1986. A ganna scan detected no reactor related activity.
The EPA analyses of the HRC cutdoor air sanple for the period October 31 - November 6, 1986 showed that concentrations of Cs-137 end I-131 were below the lower limit of quantitative detection (LLD) for the systen. The LLD varies areund a value of IE-13 uCi/cc.
om= >
8611130411 861110 PDR ADOCK 05000320 PDR ev= wi>
R
. {..
n c ronu ne omsoi uncu ono OFFICI AL RECORD COPY
t Harold R, Denton 2
icycnber 10, 1936 Frank J. iliraglia i!RC/THI-86-107 3.
AUXILIARY _ A!;D FUEL IfAl'DLIliG BUILDIhG ACTIVITIES Decontamination of the seal injection cubicles coatinues.
Reclamtion of Defueling !!ater Cleanup Systen (Ol!CS) filters continues.
Fuel handling building ventilation systen modificaticns are in progress.
Pre-operational tests of the UllCS and Sedinent Transfer systeras are in progress.
4.
liRC EVALUATIONS IH PROGRESS Technical Spacification Change Request nun' ers 49, 51, 52, and 54.
v Recoscry Operations Plan Change runbers 31 and 33.
Solid liaste Facility Technical Evaluation Report.
lieavy Load Safety Evaluatica Report, Revision 3.
Disposal of Processed llater Report.
Safety Evaluation Report for Use of Placru Arc Cutting Torch.
5.
HEETING The n xt neeting of the Advisory i%nel is tentatively scheduled for Daceocar 10,1%6.
Exact tirce er.d iocatien of tf. neeting will be annoaced in the future.
Persons desiring to speak before the Advisory Panel cre requested to contact i.r. Thonas Snithgell at 717-291-1042, or write hin at 2122 ihrietta Avenue, Lancaster, PA 17603.
original signed by Curtis Cowgill for:
Williau D. Travers Director THI-2 Cit.anup Project Directorate OF FICE )
sunNmy
- ^ " >
MRC FORM 318 0080) NRCMONO OFFICIAL RECORD COPY
4 10 y_
liarold R. Denton 3
flover.iber 10, 191.6 Frank J. fliraglia-.
11RC/Till-86-107 IllTERilAL _DISTRIBifTION -
'CEliTRAL FILE fiP.C PDR LOCAL PDR EDO CGC' EPA DOE RI Regional Administrator RI Division Directors
.Public Affairs, RI State Liaison, RI THI ilQ r/f TiiI SITE r/f TitI-2 Project Section File THI-1 Resident Office (5)
TMI Cleanup Project Directorate (14)
.TMIC
..-T.M. I.C.P.D. Qh f OFFICE >.T.
..T.M. I.C.P.D. [...
.g.P,g!At 7,cs,.3oppor g.WTt4 vets.y
="*>
omas:Jes..ccowg111...
^"> uv.?/.66.....u/l0/4Q....ull.ol86...... utt.d.486....
' NEC FORM 318 (10 80) NRCM O240 OFFICIAL RECORD COPY
.