ML20213E291
| ML20213E291 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/26/1982 |
| From: | Speis T Office of Nuclear Reactor Regulation |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0551, CON-WNP-551 NUDOCS 8211100499 | |
| Download: ML20213E291 (2) | |
Text
{
OCT g y 7gg Docket flo. : 50-397 MEff0RAtlDUM FOR: Thomas Novak, Assistant Director for Licensing, DL FROM:
Themis P. Speis, Assistant Director for Reactor Safety, DSI
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION REPORT (UNP-2)
Plant Name:
HPPSS Nuclear Project No. 2 Docket flumber:
50-397 Licensing Stage:
OL Responsible Branch:
Licensing Branch #2 Project fianager:
R. Auluck DSI Branch Involved: Reactor Systems Branch Enclosed is the Reactor Systems Branch SSER with regard to pressure inter-locks on the low pressure ECCS injection valves at WNP-2. The conceptual design and the schedule for implementation proposed by the applicant are acceptable.
, dnc! Signea g n
unus P, g.eg Themis P. Spets, Assistant Director For Reactor Safety Division of Systems Integration nc osure:
DISTRIBUTION As stated cc:
R. ffat.tson RSB Rdg.
RSB Plant File D. Eisenhut TCollins Rdg.
A. Schwancer TCollins R. Auluck Section D Members, RS8 WHodges B c "
RS8 Section Leaders e
CONTACT:
T. Collins, x29403 l
0211100499 021026
- e.ADOCK_0S000397 /
?
f o,,m!RSB:,,3g,',50 p,SI,,,,,,, l g ygf J m g :osI e,~
.. m m ns-cs s.daes.........l. @ # 1).,
, 6 7'
1
...gS om of..).0l/M2.. f.1.0/.'../.92....,, f,,).0//pA 2,.,,, j 10,/g/ A 2,,
,L, we so.w us ca.m.acu am CFFICIAL RECORD COPY w.mt.u-u m
WNP-2 Supplemental Sa fe ty Evaluation R eport 6.3.2.3 Emergency Core Cooling Systems Functional D esign With regard to provisions to protect the low pressure emergency core cooling systems from overpressurization by the reactor coolant systems the staff's position is that one of the three options discussed in Section 6.3 of the Standa rd R eview Plan (NUR EG-0800) be implemented.
In letters dated July 28, 1982, and September 28,1982, f rom G.D. Bouchey (Washington Public Power Supply System - WPPSS) i to A.
Schwencer (NR C), the applicant committed to a modification tc the control logic on the pressure interlocks for the lo w pressure ECCS injection valves.
The new togic will permit opening of the moter operated isolation valve only when the reactor coolant pressure is below the design pressure of low pressure system i
involved.
The interlocked valver in series with a check valver is censistent with the guidelines of the Standard R eview Plan.
The applicant has also committed to implementing this change by fuel load.
Based upon the conceptual design and schedule commitment discussed hereine but conti.ngent upon an amendment to the FSM in this regarde we find the applicant's preposed modification acceptable.
3CT)
- 1992 DISTRIBUTION:
See attached page Docket No.: 50-397 MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:
R. Auluck, Project ifanager Licensing Branch No. 2, DL
SUBJECT:
FORTHCOMING MEETING WITH WASHINGTON PUBLIC PO!1ER SUPPLYSYSTEM(14PPSS)
DATE & tit'E:
fJovember 16 thru 19,1982 8:00 Aff LOCATION:
Richland, WA PURPOSE:
UNP-2 59RT and PVORT Audit PARTICIPA'lTS :
NRC INEL UPPSS T. Y. Chang J. N. Singh R. Nelson J. E. Jackson ft. J. Russell J. E. Rhodes R. Auluck T. Rahl GMein il sig:ffi g R. Auluck, Project l'anaqer Licensing Branch No. 2 Division of Licensing cc: See text page
(
7 110.'^"'.2 821025 PDR ADOCK 03000397 DR b
(L ff t
t rio-
'W e./.P.H.....O..L$... $.. I2..LB.C....
c,nce, su:sce )....V.l.9.9.h.:.hW...
AS.C. '1.fgf.f.C..
..1. 0../. 2...fB..2......
.. 1. 0..r..,. V.. 8. 2....
om>
hac. ra..u sa no. san.acu r.a OFFICIAL RECORD COPY i
w.,7 m.-m.w,'
WNP-2 Mr. R. L. Ferguson Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:
Nicholas Reynolds, Esquire Debevoise & Libernen 1200 Seventeenth Street, N. W.
Washington, D. C.
20036 Mr. G.E. Doupe, Esquire Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas Lewi s, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W.G. Conn, Sr. N/M Group Supervi sar Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 Dr. G.D. Bouchey Deputy Director, Safety & Security Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352
OCT 2 51332 MEETING NOTICE DISTRIBUTION:
Date:
NRC PDR L PDR NSIC PRC LB#2' Reading NRC PARTICIPANTS:
E. Hylton Project Manager R. Auluck T. Y. Chang H. Denton/E. Case J. E. Jackson D. Eisenhut/R. Purple R. Auluck T. M. Novak*
B. Youngblood A. Schwencer G. Knighton E. Adensam G. Lainas F. Miraglia J. P. Knight W. Johnston D. Muller '
T. Speis R. Houston L. Rubenstein
, d','
F. Schroeder M. Ernst J. Kramer NRR Division Directors
- OELD Attorney Paton E. L. Jordan, DEQA:IE J. M. Taylor, DRP:IE Phillips Building Receptionist **
ACRS (.16)
Region V
Resident Inspector cc:
Service List
- 0nly if participant in meeting
- 0nly if meeting held in Bethesda a
N e
O