Fowards Safety Insp Repts 50-456/86-59 & 50-457/86-42 on 861014-24.No Violation Noted
ML20213E091
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/07/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20213E094 List:
References
NUDOCS 8611130011
Download: ML20213E091 (2)


See also: IR 05000456/1986059

Text

.

.

NOV 7 1986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by J. H. Neisler of

this office on October 14-24, 1986, of activities at Braidwood Station

authorized by Construction Permits No. CPPR-132 and No. CPPR-133 and to the

discussion of our findings with Mr. G. E. Groth and others of your staff at

the conclusion of the inspection.

itie enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by J. J. Harrison

J. J. Harrison, Chief

Engineering Branch

Fnclosure: Inspection Reports

No. 50-456/86059(DRS);

No. 50-457/86042(DRS)

See Attached Distribution

8611130011 861107

PDR ADOCK 05000456

G PDR

/

ZEo/

E

i

.-

Commmonwealth Edison Company 2

NOV 71986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent.

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

, Resident Inspector, RIII

Braidwood

Resident Inspector, RIII-Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief,-Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

.

RIII RIII RI h R I"

Je A L d4 th

Neisler/ib Muffett Gardner Ha rison