ML20213D722
| ML20213D722 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/14/1981 |
| From: | Bosnak R Office of Nuclear Reactor Regulation |
| To: | Haass W Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0358, CON-WNP-358 NUDOCS 8105200310 | |
| Download: ML20213D722 (3) | |
Text
)
%2
\\
T V
w s
~
y 4
DISTRIBURON:
c00& et Fy e' ut.:MES Reading File
'NAY 141981 8
tiEf10RAllDUM FOR: !!$lterP.Ha$ss, Chief y> \\
Quality Assurance Branch, DE g
g ('Ng%[ / 4 FROM:
Rober:t J. Bosnak, Chief Hechanical Engineering Branch, DE y
'S APPLICABILITY OF lb CFR 5b, APPEllDIX B T0 ( b.
SUBJECT:
p Q
STRUCTURES, SYSTEl!S, AND COMP 0f'EllTS OF f
HPPSS-2, DOCKET 00. 50-397
, j ;f(s The flech$nic$1 Engineering.Br$nch.h$s rev~iewed Section 3.2 of the llPPSS 2 FSAR in order to determine.the applicability of 10 CFR 50, Appendix B to the structures, systems, and components of WPPSS-2. Our review utilized Regulatory Guide 1.29, Revision 3. " Seismic. Design Classification " as the. basis for determining the extent to.which Appendix B, 10 CFR 50 is applicable to these plant features of ilPPSS-2.
ThisreviewisEppliedbletothosestructures, systems,.Endcomponentsfor which the SEB,.RSB, CMEB, ASB, PSB (except electrical) and MEB have primary responsibility. The review does.not loclude those plant features for which the CSB, ICSB, and PSB (electrical) have primary responsibility.
Therev'iewofFSAR.Section3.'2.indicatesth$twerequireresolutionofthe connents in Enclosure 1.to assure that.these items are within the scope of the applicant's Quality Assurance Program and are in compliance with 10 CFR 50, Appendix B.
Our detailed connents are enclosed.
R.[.Bosn$k, Chief ficchanical Engineering Branch Division of Engineering
Enclosure:
As stated See next page.'
cc:
J.
}
fb 7
810 5 200 3l6 i /w/ '
,ME:g'_k i
I I
me.,,
DE:MEB Mb RBogga m..a'RKirkwo i
e 5/13/Nl' 5/h/81 l
l i
om t.
. u.c,. U =, h
+.:.w i m =: n.
=
A =
1 -- +
T T
.*s
(
2 cc:
R. Vollmer, DE H. Levin..DE D. Eisenhut, DL R. Purple, DL A. Schwencer, DL R. Auluck, DL P. Check, DSI
- 0. Parr, DSI F. Rosa, DSI T. Spets, DSI J. Knight, DE F. Schauer, DE V. Benaroya, DE W. Johnston, DE F. Cherny, DE H. Brammer, DE J. Spraul, DE R. Li, DE R. Kirkwood, DE
Contact:
R. Kirkwood, DE:MEB, x27798 i
n =*~~
. m. e.
OF7 4C f f '
... q [
.L i
f '.'
can I,-
p
\\
l -
x--.
....u.-.
1 ENCLOSURE 1 WPPSS-2 Docket No. 50-397 The following.comenst are based on the MEB review of Table 3.2-1 of the WPPSS-2 FSAR. The review was performed in order to identify those structures, systems and components that are within the scope of 10 CFR 50, Appendix B and is applicable to those plant features within the scope of the SEB, RSB, CMEB, ASB, PSB (except electrical) and MEB. The review does not include plant features within the scope of CSB, ICSB, and PSB (electrical).
The following additional items should be identified in the FSAR as within the scope of the applicant's Quality Assurance Program and in conformance with 10 CFR 50, Appendix B.
(1) Biological shielding within containment vessel, reactor building, and control building.
(2) Missilebarrierswithincontainmenthessel,reactorbuilding, control building, diesel-generator building, and standby service water pumphouses.
(3) Spent fuel pool and liner.
(4) Fuel pool cooling and cleanup system heat exchangers, pumps, and inter-connecting piping and valves that performs the cooling function.
D