Ack Receipt of Util Providing List & Schedule of Proposed Bldg Const.Staff Review & Approval of Design Basis & Proposed Plans for Shift Supervisor Ofc Addition to Main Control Room Required
ML20213D712
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/05/1986
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
GL-81-23, NUDOCS 8611120203
Download: ML20213D712 (3)


Text

t November 5, 1986 i

Docket No. 50-267

-DISTRIBUTION:

, N RLipinski NRC'PDR RRothman-Local PDR ISpickler

.Mr.-R. O. Williams, Jr.

PBSS Rdg.

LYandell, R-IV Vice President, Nuclear Operations PNoonan Public Service Company of Colorado KHeitner Post Office Box 840 EMcPeek Denver, Colorado 80201-0840 0 Lynch HBerkow

Dear Mr. Williams:

LMarsh JCalvo

SUBJECT:

FORT ST. VRAIN-BUILDING CONSTRUCTION AND MODIFICATIONS We have reviewed your letter dated September 24,1986'(P-86550),providing a list and schedule of proposed bui_lding construction at Fort St. Vrain

.(FSV).

This. letter is to advise you of certain concerns we'have about these proposed activities. We have also noted certain standards that are applicable to thes.e proposals.

- Specific coments, by building, are:

Building 33 -:The staff has a concern about flamable and corrosive materials. Applicable guidance includes: Naticnal Fire Protection Association Standard 30, Regulatory Guides (RG) 1.78 and 1.95, and

~ Standard Review Plans 2.2.1, 2.2.2 and,2.2.3.

Building 35'- We are concerned about the handling of irradiated material.

' Applicable guidance includes RG 1.43 and Generic Letter 81-23.

Building 36 - The applicable Security Plan may require revision.

Shif t Supervisor's Office Addition to Main Control Room - Staff review and approval of design basis and proposed plans may be required.

Sincerely.

Original signed by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page PB PBSS FB S

PB n

H

. er:ac EMcPeek

( L ch HB w

/6 10 (86 10/ /86 1

't/86 10/ "/86 l

PBEBll\\.

PBPE / %

LMarsh JCalvo 10/J)/86 1p/5/86 SM"!888R 8N$8Ea p

PDR

t g.../~

~y

/

%o UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

g g

WASHINGTON, D. C. 20555 k.....,o#

November 5, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST. VRAIN BUILDING CONSTRUCTION AND MODIFICATIONS We have reviewed your letter dated September 24,1986(P-86550),providing a list and schedule of proposed building construction at Fort St. Vrain (FSV).

This letter is to advise you of certain concerns we have about these proposed activities. We have also noted certain standards that are applicable to these proposals.

Specific comments, by butiding, are:

Building 33 - The staff has a concern about flammable and corrosive materials. Applicable guidance includes: National Fire Protection Association Standard 30 Regulatory Guides (RG) 1.78 and 1.95, and Standard Review Plans 2.2.1, 2.2.2 and 2.2.3.

Building 35 - We are concerned about the handling of irradiated material.

Applicable guidance includes RG 1.43 and Generic Letter 81-23.

Building 36 - The applicable Security Plan may require revision.

Shift Supervisor's Office Addition to Main Control Room - Staff review and approval of design basis and proposed plans may be required.

Sincerely, Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page

..--.,,.y,-.

-.--m-, _. -

--,-...,,,,,,,.,_m-,

.----..__-,,,.-.--*"*wn-*?

r-"Y

'i i ;4

~

4 Mr. R. O. Williams Public Service Company of Colorado Fort St.-Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado P. O. Box 840 ~

4210 East lith Avenue Denver, Colorado 80220 Cenver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc.

Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 92138 Kelley, Stansfield & 0'Donnell Public Service Copipany Building Commitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413