s TVA EMPLOYEE CONCERNS REPORT NUMBER: C011203-SQN SPECIAL PROGRAN REVISION NUMBER: 3 REPORT TYPE: Sequoyah Nuclear Plant Element (Final Report)
TITLE: Poor Planning and Coordination As Related PAGE 1 0F 3 To Construction REASON FOR REVISION:
Revision 1 To incorporate Technical Assistance Staff comments Revision 2 To incorporate SRP comments Revision 3 To incorporate the line organizations corrective actions and finalize report.
PREPARATION PREPARED BY:
/0 ~If~ $$
DATE g
SIGNATy9#
REVIEWS PEER de b[d) l0 #30- $&
DATE SIGNATURE lobabd
$ ARH t
DATE SIGNATURE CONCURRENCES l$YY$h CEG-Rt Al Y!Awel /
$ _ /$'3/ ~6h' S
DATE SIGNATURE l/ /nfl/
SIGNATURE DATE c
foA S. R.
Ra APPROVED BY:
L
[8'38' O N/A ECSP hANAGER DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
I TVA EMPLOYEE CONCERNS REPORT NUMBER: C011203-SQN SPECIAL PROGRAM REVISION NUMBER: 3 PAGE 2 0F 3 SUPPLEMENT FOR SEQUOYAH NUCLEAR PLANT (SQN)
I.
Introduction This report addresses one concern (MAS-86-003) dealing with the adequacy of work being performed by construction concerning fuse identification workplans.
II.
Summary of Perceived Problem The concerned individual apparently felt no corrective action was being taken to resolve the fuse discrepancies noted between the design drawing and the installed configuration, as stated in workplan number 10512.
III. Evaluation Methodology A.
Discussed this concern with knowledgeable electrical maintenance personnel to determine the extent and specifics of the concern.
B.
Reviewed Workplan Number 10512 to determine the content of the plan and the areas covered.
IV.
Summary of Findings A.
The discussions with electrical maintenance personnel revealed this j
was a concern received under the "old" Employee Concern Program and a resolution had been discussed with the concerned individual.
This resolution would involve the Office of Engineering Design, the Inspector General, the Office of Construction Engineering, and an assistant unit operator. The design engineer will authorize changes in fuse size and manufacture type. Field Change Requests (FCRs) will be submitted to correct any drawing discrepancies.
Drawings will be marked up showing the correct configuration prior to workplan closure. This discussion also revealed that the concerned individual agreed that these corrective steps should resolve any problems that exist and would alsa satisfy his concerns.
B.
A review of Workplan Number 10512 revealed the work was to install nameplates or unique identifiers to all control fuses.
Identification will consist of a unique identifier, a manufacturer's code, and fuse rating.
I
i TVA ENPLOYEE CONCERNS REPORT NUMBER: C011203-SQN SPECIAL PROGRAN REVISION NUMBER: 3 i
PAGE 3 0F 3 Supplement for Sequoyah Nuclear Plant (SQN)
Conclusion Discussion of this concern with electrical maintenance engineers indicated this concern was factual. However, the problem has now been resolved to the satisfaction of the concerned individual and the resolution will fulfill the requirements of the work instructions.
V.
Root Cause A failure to follow work instructions by keeping as-built drawings up-to-date.
i VI.
Corrective Actions l
l l
The corrective actions supplied by the line organization were:
l l
Class 1E and penetration cable protection fuses and fuse identifi-l cation tag verifications are being performed per DNE issued drawings.
l 1
Discrepancies identified during verification will be corrected as lR3 specified in Workplans 12020, 12052, 12057, 12058, 12065 and 12152.
l
}
Upon completion of Workplans, drawings will be marked up.
Plant l
l instruction AI-16 " Fuse Control" will be revised to incorporate DNE l
issued documents and requirements. This corrective action should be l
i l
completed by December 15, 1986.
(CATD No. 11203-SQN-01) l i
i This corrective action is required for restart.
VII. Generic Applicability i
None i
l VIII. Attachments l
Attachment A - Listing of Concerns Indicating Safety Relationship and l
Generic Applicability.
~
lR3 I
i i
l l
C011203-SQN-R3 ATTACHMENT - A i
i MAS-86-003 CO 11200 N
SQN NNYN NS Adequacy of work being done by construction concerning fuse indentification work plans.