Text
(
e
'[
= MEMORANDUM FOR:
Samuel J. Chilk, Secreta _ry
.FROM:
Thomas A. Rehm Assistant for Operations Office of Executive Director for Operations
SUBJECT:
' DAVIS-BESSE RESTART STATUS - BRIEFING MATERIALS On November 21,1986, the staff will brief the Coinmission on the status of Davis-Besse with regard to readiness-for-restart _ Enclosed with this memorandum are copies of the staff's briefing material.
The' staff briefing will be preceded by a presentation from Toledo Edison Company describing progress since July-(the Commission was last briefed on July 17, 1986).
(Signid) T. A. Rehm Thomas A. Rehm Assistant for Operations Office of Executive Director
.for Operations
Enclosure:
As stated
Contact:
A. DeAgazio,.NRR 49-28115 Distribution:
PPAS PBD#6 Rdg PCrutchfield Docket File JHeltemes, AE0D HDenton/RVollmer NRC & LPDRs ADeAgazio TRehm GEdison RIngram FMiraglia OGC Rdg VStello ERossi OGC CMCracken VStello EDO R/F b
See previous concurrences.*
DI h h EDO PBD-6 PBD-6 PBD-6 PBD#6 TP B
ADeAgazio*;eh CMcCracken*
JStolz*
GEdison* F glia H.ntoni.
TRehm 10/21/86 10/21/86 10/21/86 10/21/86 f/86 g /g86'
/ / /.5'/86 DR A
00 6
m-Docket No. 50-346 MEMORANDUM FOR:-
Samual J. Chilk Office of the Secretary FROM:
Thomas A. Rehm.
Assistant for Operations Office of Executive Director for Operations
SUBJECT:
DAVIS BESSE RESTART STATUS - BRIEFING MATERIALS On' November 7, 1986, the sta will brief the Commission on the status of Davis-Besse with regard to adiness-for-restart. Enclosed with this memorandum are copies of the st f's briefing mater 1.
The staff briefing will be precede by a presenta ion from Toledo Edison"
-Company describing progress since J ly (the Co ssion was last briefed on July 17, 1986)
Thoma
. Rehm Assist t for Operations Offic o Executive Director for Operations
Enclosure:
As stated
Contact:
A. De Agazio, NPR 492-8115 Distributio :
PPAS PBD#6 g
DCrutchfield Docket File JHelteme, AE0D HDenton/RVollmer NRC & LPDRs ADeAgazi TRehm GEdison RIngram FMiraglia 0GC Rdg VStello ERossi OGC CMCracken VStello
'\\
PBD-6gl$!8 hPB-6 (h3#6
-B DIR:NRR EDO PBD-6
's ADeAgazio;eh CMcCracken J
Iz G
n glia HDenton TPehm p /g /86
/g /;2//86
/o /
Jo /n
/f
/86
/ /86
/ /86
COVV SSON BRI N G JAVS-BISSE RES AT ASSOC A"E2 W"F 6/9/85 VEN~~
l
\\0V VBER 2', :983
/
l CONTACT: A. W. De AGAZIO EXT 28115 l
SUDE 1 i
l EVALUATION MILESTONES 4
0 JUNE 1986-STAFF RESTART SER ISSUED (NUREG 1177)
--ALL ELEMENTS OF 8/14/85 50.54(f)
LETTER RESOLVED
-lSSUES IDENTIFIED IN llT REPORT (NUREG 1154) RESOLVED 0
JULY 16,1986-ACRS LETfER CONCURS WITH STAFF RESTART FINDINGS 0 JULY 24,1986-COMMISS10N BRIEFED ON STAFF FINDINGS; RESTART CONTINGENT UPON:
-UCENSEE'S IMPLEMENTATION OF COMMITMENTS
~
IDENTIFIED IN NUREG 1177
-0PERATIONAL READINESS INSPECTION, INCLUDING ACTIONS UNRELATED TO THE EVENT SUDE 2
4
.;. s REGIONAL EVALUATION
~
0 COMMITMENTS IDENTIFIED IN NUREG 1177 HAVE BEEN. lMPLEMENTED
- POWER DEPENDENT PORTIONS OF THE SYSTEMS TEST PROGRAM WILL BE COMPLETED DURING POWER ESCALATION 0
ACTIONS NOT RELATED TO THE EVENT ARE RESOLVED
-REACTOR COOLANT PUMP ROTATING ASSEMBLY REPLACEMENT COMPLETED
-RAYCHEM CABLE SPLICING REPLACEMENT AND QUALIFICATION PROGRAM COMPLETED PRIOR TO CRITICALITY 0
READINESS FOR RESTART
-0PERATIONAL READINESS
-AUGUMENTED INSPECTION DURING RESTART SUDE 3
G EMERGENCY PLANNING STATUS O
GOV CELESTE'S EMERGENCY PLANNING COMMITTEE REVIEW (OCTOBER 28,1986 MEETING WITH NRC STAFF)
SUDE 4
CONCLUSIONS 0
ALL EVENT-RElATED ISSUES ARE RESOLVED 0
OPERATIONAL READINESS IS ADEQUATE O
THE STAFF IS PREPARED TO AUTHORIZE RESTART 1