ML20213D166
| ML20213D166 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/12/1980 |
| From: | Brunner E, Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| References | |
| PNO-I-80-040, PNO-I-80-40, NUDOCS 8004240241 | |
| Download: ML20213D166 (1) | |
Text
.h '
PRELIMINARY NOTIFICATION Date: March 12, 1980 PRELIMINARY NOTIFICATION OF EVENT OR UNU5UAL OCCURRENCE--PNO"I-80-40 This preliminary notification constitutes EARLY notico of events of POSSIBLE saf ety or_publi_c _ interest signi ficance.
The informatlon presented is as initially received without verifichion nr evaluation and is basically all that is' known by IE starf on this date 2
Facility. Philadelphia Electric Company Peach Botton: Unit 2 (DN 50-277) g i
Delta. Pennsylvania 7g 3 Ed sub[oct:
INJURY TO WORKER DURING UNIT 2 STARn!P Sb a
'i
'1
~
At about 6:55 a.m. un March 17, 1980, a control operator was injured gli3e ro
)
investigating an air ejector off gas valve on Unit 2 which was stuck WthFclosed, q position.
lie was attenipting tn free the valve when the valve opened arg caught his right hand between the valve body and valvo por.ition indicator.
Thg ori1'ratur p;
~
sustained a deep gar.h hetween hit thumb and index finger and was transportM to:a J
hospital via ambulance.
There was no radioactive contamination involved ingthe
^' "
accident.
The NRC lieadquarters, Duty Officer was informed via OPX telephone at approximately
/:US a.m.
- .= Media interer.t is possible because of sensitivity to nuclear power issues. The
' Commonwealth of Pennsylvania has been informed.
A press release is not planned.
by the licensee or NRC at this time.
MRC Region I received notification of this occurrence by telephone from the Resident inspector at 8:00 a.m. on March 12, 1980.
f.[.,1 E. 6. b)"(finer Prepa'reTby UT ~ ~ ~ ~
B'r' inch / Chief ~ 488.l.240 l
Contact:
R. R. Keimig 488-1752
~~
EXT
~~
DISTRIBUT.I,0]!,:
(facsmile Transmission Times Noted)
H ST BLDG MARYLAND NATIONAL IE:XOOS Cha irman AheVrne BANK BUILDING HRC/IMITecMiical Commissioner Kennedy W. J. Dircks, F00 Support Office Commissioner Gilinsky C. Michelson. AE00 Commir.sioner Gradford J. J. Tcuchard. PA Region II
~
Commissioner llendric N. M. Haller, MPA Region III ACR5 R. G. Ryan. 05P Region IV,_
S. J. Chilk, SLCY
- 11. K. Shapar, ELD Region y C. C. Kammercr, CA (for Dir.tribution)
WILisTE BLOG _...
R1 Resident Sites J. G. Davis, NHSS
/
PHILLIPS BLDG R. Budnitz, RES
/
~ ~ '
H. R. Denton,iTRR
~
O. R. Muller, NRR I.ANDOW DLDG (Fax by HQ)
,(MAIL).
R. J. Mattson, NRR (6 MIN /PAGE)
~~
R~ Minogue. SD D. Vassallo, NRR J. J. Cumaings, 01A IE:X005 O. Eisenhut, NRR PRELIMINARY NOTIFICATION Region I Form 83a (Rev. January 1930)
O C 4 2.4/ O 11/l
.Lg.