ML20213D152
| ML20213D152 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/05/1986 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20213D154 | List: |
| References | |
| NUDOCS 8611100443 | |
| Download: ML20213D152 (2) | |
See also: IR 05000327/1986046
Text
f.
. ,
4hw
-
w
NOV 0 51986
Docket Nos. 50-327, 50-328
Tennes e Valley Authority
ATTN:
Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
' Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT N05. Si-327/86-46 AND 50-328/86-46)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
K. Jenison -on August 6 - September 5,1986.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violations, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
The first violation described in the enclosed. Notice is similar to a violation
contained in the Notice of Violation sent to you by our letter dated August 12,
1986.
Because "similar violations," as described in the NRC Enforcement Policy,
are of significant concern to the NRC, please give particular attention in your
response to the identification of -the root cause of this problem and your
corrective action to prevent recurrence.
Your attention is invited to unresolved items identified in the inspection
report.
These matters will be pursued during future inspections.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
~
,
8611100443 861105
ADOCK 05000327
G
e
I
p
r-
,.
..
.
,
Tennessee Valley Authority
2
NOV 0 51986
Should you have~ any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SiGNEDS
0, GARY G. 2ECH, .h
Gary G. Zech, Director-
Division of TVA Projects
Enclosures:
1.
2.
NRC Inspection Report
/cw/encls:
H. L. Abercrombie, Site Director
/ Sequoyah Nuclear Plant
//J. A. Kirkebo, DirectorP. R. Wallace, Plant Manager
Nuclear Engineering
/R.L.Gridley, Director
d.NuclearSafetyandLicensing
R. Harding,_ Site Licensing
Manager
bec w/encls:
s
. L. Thompson, NRR
.'). M. Taylor, IE
VS. B. Hayes, 0I
'. R. Connelly. 0IA
. P. Barr, RII
NRC. Resident Inspector
NRC Document Control Desk
State of Tennessee
RII
R
Qi
RII
RCarroll:bhg
K
r
C s
10/g86
10/2p 86
10/d/86
/30/86