ML20213C786

From kanterella
Jump to navigation Jump to search
Forwards Verification & Validation Program Summary Rept for Georgia Power Co,Vogtle Electric Generating Plant Emergency Response Facilities Computer Sys, Re SER Open Item 14b, Spds,Per NUREG-0737,Suppl 1
ML20213C786
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/31/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20213C787 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GN-1134, NUDOCS 8611100272
Download: ML20213C786 (1)


Text

[

Georgia Power Company Pbst Office Box 282 Waynesboro, Georg'o 3r30 Telephone 404 554 9961 404 724-8114 Southern Company Services. Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 8704011 VOgtle Project October 31, 1986 Director of _ Nuclear Reactor Regulation File: X7BC35 Attention: Mr. B. J. Youngblood Log: GN-ll34 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 14h: SAFETY PARAMETER DISPLAY SYSTEM (SPDS)

Dear Mr. Denton:

In accordance with the requirements of NUREG-0737 Supplement 1 and as noted in the VEGP SER the attached document is submitted for your staff's review.

Attached is a copy of the Verification and Validation Program Summary Report for the Georgia Power Company, Vogtle Electric' Generating Plant Emergency Response Facilities Computer System.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, J. A. Bailey Project Licensing Manager JAB /sm Attachment xc: R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. A. McManus M. A. Miller (2) L. T. Gucwa B. Jones, Esquire Vogtle Project File G. Bockhold, Jr.

9 0814V 8611100272 861031 h0 PDR ADOCK 05000424 I i

E PDR

--