MONTHYEARML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs IR 05000416/19990021999-09-10010 September 1999 Notification of Significant Licensee Meeting with Entergy Operations,Inc on 991018 to Discuss Listed Topics Identified in NRC Insp Repts 50-416/99-02,99-03 & 99-06 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20204B3041999-03-15015 March 1999 Notification of Licensee Meeting with Util in Energy Svc Ctr,Grand Gulf Site on 990415 to Discuss Plant Performance Review Results.Meeting Open to Public ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20151X1651998-09-14014 September 1998 Notification of Significant Licensee Meeting W/Util on 980929 to Discuss Emergency Preparedness Activities & Issues ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M0751998-06-0909 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Installation & Design of Suppression Pool ECCS Strainer to Meet NRC Bulletin 96-003 IR 05000416/19983011998-05-26026 May 1998 Forwards NRC Operator Licensing Exam Rept 50-416/98-301 for Tests Administered on 980330-0403 ML20248B4181998-05-26026 May 1998 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 980330- 0403 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216H9441998-03-19019 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md for Licensee to Brief Staff on Risk Mgt for Upcoming 9th Refueling Outage Scheduled to Begin on 980411.Licensee Will Do Presentation to Meet NRC Bulletin 96-003 ML20216J4051998-03-18018 March 1998 Forwards SER Authorizing Licensee 980211 & 0310 Ltrs, Requesting Approval of Alternative Reactor Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii) for Plant for Next 2 Operating Cycles ML20217F2521998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet NRC Bulletin 96-003.Meeting Cancelled as of 980326 ML20216C8601998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet Bulletin 96-03 ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20198M7531998-01-12012 January 1998 Notification of Meeting W/Entergy Operations,Inc,On 980123 in Rockville,Md to Discuss Plans to Change Radiological Emergency Response Plan ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20217D0461997-09-29029 September 1997 Notification of Significant Licensee Meeting W/Util on 971029 to Discuss Systematic Assessment of Licensee Performance ML20141E8501997-06-27027 June 1997 Notifies of 970710 Meeting W/Licensee in Rockville,Md Re Appeal of Decision by Nrc,In ,That Changes in Rev 28.001-95 of Plant Emergency Plan Not within 10CFR50.54(q) & Can Not Be Implemented W/O Prior NRC Approval ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135F8581997-03-13013 March 1997 Notification of 970424 Licensee Meeting W/Util in Arlington, Tx to Discuss Current Performance ML20135F0921997-03-0606 March 1997 Notification of Significant Licensee Meeting W/Util on 970319 to Discuss Current Performance.Meeting Cancelled ML20135D8531997-03-0303 March 1997 Notification of 970325 Meeting W/Util in Port Gibson,Ms to Discuss MOV Thurst Methodology Developed by Util.Subj Methodology Being Applied in Licensee Response to GL 95-07 ML20135D7791997-02-27027 February 1997 Notification of Significant Licensee Meeting W/Entergy Operations,Inc on 970319 in Arlington,Tx to Discuss Current Performance ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20135B6231996-11-27027 November 1996 Notification of 961217 Licensee Meeting W/Util in Arlington, Tx to Discuss Evaluation Approach & Results of UFSAR Assessments at Each Facility ML20134L6121996-11-19019 November 1996 Notification of 961121 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Views on Funding for Decommissioning Costs of Nuclear Power Plants as May Apply for Each of Four Nuclear Plant Sites ML20129K1821996-11-0606 November 1996 Notification of 961121 Visit to Plant to Review Component Procurement Packages Using Graded Quality Assurance That Have Been Completed by Licensee ML20134C9121996-10-0808 October 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20149D7871993-12-20020 December 1993 Provides Interim Guidance to Regions for Review of Licensee Action to Address Pressure Locking & Thermal Binding of Valves Until New Generic Communication Issued ML20058G5601993-11-30030 November 1993 Notification of 931206 Meeting W/Util in Rockville,Md to Discuss Licensee 931021 Request to Be Allowed to Use Alternatives to Requirements of 10CFR50.55a(f) & (G) ML20057B1281993-09-14014 September 1993 Forwards Page 33 of Rev 5 to GGNS Training & Qualification Plan,Transmitted Via .Page Inadvertently Omitted from Subj Transmittal.Page Withheld ML20057A4581993-09-0101 September 1993 Notification of Significant Meeting W/Util in Atlanta,Ga on 930916 to Discuss Refueling Outage Number 6 Plan & Current Plant Issues 1999-09-02
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs IR 05000416/19990021999-09-10010 September 1999 Notification of Significant Licensee Meeting with Entergy Operations,Inc on 991018 to Discuss Listed Topics Identified in NRC Insp Repts 50-416/99-02,99-03 & 99-06 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20204B3041999-03-15015 March 1999 Notification of Licensee Meeting with Util in Energy Svc Ctr,Grand Gulf Site on 990415 to Discuss Plant Performance Review Results.Meeting Open to Public ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20151X1651998-09-14014 September 1998 Notification of Significant Licensee Meeting W/Util on 980929 to Discuss Emergency Preparedness Activities & Issues ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M0751998-06-0909 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Installation & Design of Suppression Pool ECCS Strainer to Meet NRC Bulletin 96-003 ML20248B4181998-05-26026 May 1998 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 980330- 0403 IR 05000416/19983011998-05-26026 May 1998 Forwards NRC Operator Licensing Exam Rept 50-416/98-301 for Tests Administered on 980330-0403 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216H9441998-03-19019 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md for Licensee to Brief Staff on Risk Mgt for Upcoming 9th Refueling Outage Scheduled to Begin on 980411.Licensee Will Do Presentation to Meet NRC Bulletin 96-003 ML20216J4051998-03-18018 March 1998 Forwards SER Authorizing Licensee 980211 & 0310 Ltrs, Requesting Approval of Alternative Reactor Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii) for Plant for Next 2 Operating Cycles ML20217F2521998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet NRC Bulletin 96-003.Meeting Cancelled as of 980326 ML20216C8601998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet Bulletin 96-03 ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M7531998-01-12012 January 1998 Notification of Meeting W/Entergy Operations,Inc,On 980123 in Rockville,Md to Discuss Plans to Change Radiological Emergency Response Plan ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20217D0461997-09-29029 September 1997 Notification of Significant Licensee Meeting W/Util on 971029 to Discuss Systematic Assessment of Licensee Performance ML20141E8501997-06-27027 June 1997 Notifies of 970710 Meeting W/Licensee in Rockville,Md Re Appeal of Decision by Nrc,In ,That Changes in Rev 28.001-95 of Plant Emergency Plan Not within 10CFR50.54(q) & Can Not Be Implemented W/O Prior NRC Approval ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135F8581997-03-13013 March 1997 Notification of 970424 Licensee Meeting W/Util in Arlington, Tx to Discuss Current Performance ML20135F0921997-03-0606 March 1997 Notification of Significant Licensee Meeting W/Util on 970319 to Discuss Current Performance.Meeting Cancelled ML20135D8531997-03-0303 March 1997 Notification of 970325 Meeting W/Util in Port Gibson,Ms to Discuss MOV Thurst Methodology Developed by Util.Subj Methodology Being Applied in Licensee Response to GL 95-07 ML20135D7791997-02-27027 February 1997 Notification of Significant Licensee Meeting W/Entergy Operations,Inc on 970319 in Arlington,Tx to Discuss Current Performance ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20135B6231996-11-27027 November 1996 Notification of 961217 Licensee Meeting W/Util in Arlington, Tx to Discuss Evaluation Approach & Results of UFSAR Assessments at Each Facility ML20134L6121996-11-19019 November 1996 Notification of 961121 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Views on Funding for Decommissioning Costs of Nuclear Power Plants as May Apply for Each of Four Nuclear Plant Sites ML20129K1821996-11-0606 November 1996 Notification of 961121 Visit to Plant to Review Component Procurement Packages Using Graded Quality Assurance That Have Been Completed by Licensee ML20134C9121996-10-0808 October 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20149D7871993-12-20020 December 1993 Provides Interim Guidance to Regions for Review of Licensee Action to Address Pressure Locking & Thermal Binding of Valves Until New Generic Communication Issued ML20058G5601993-11-30030 November 1993 Notification of 931206 Meeting W/Util in Rockville,Md to Discuss Licensee 931021 Request to Be Allowed to Use Alternatives to Requirements of 10CFR50.55a(f) & (G) ML20057B1281993-09-14014 September 1993 Forwards Page 33 of Rev 5 to GGNS Training & Qualification Plan,Transmitted Via .Page Inadvertently Omitted from Subj Transmittal.Page Withheld ML20057A4581993-09-0101 September 1993 Notification of Significant Meeting W/Util in Atlanta,Ga on 930916 to Discuss Refueling Outage Number 6 Plan & Current Plant Issues 1999-09-02
[Table view] |
Text
__ _ -
e
- - - l UNITED STATES l
[pMt;pq'og NUCLEAR REGULATORY COMMISSION 3 o CEcCN il
.*! 101 C*A9IETTA STRE ET. NIf.
ATLANTA. GEORGIA 30303
NOV i41983 .
NOTICE OF SIGNIFICANT LICENSEE MEETING 1
Name of Licensee: Mississippi Power and Light Company Name o.f Facility: Grand Gulf Nuclear Station Unit 1 Docket No.: 50-416 Date and Time of Meeting: November 18, 1983, at 10:00 a.m.
Location of Meeting: Region II Office, Atlanta, Georgia Purpose of Meeting: MP&L's Program for Recertification of the Operating Personnel at the Grand Gulf Facility NRC Attendees: J. P. O'Reilly, Regional Administrator R. C. Lewis, Director, Division of Project and Resident Programs (DPRP), RII J. A. Olshinski, Director, Division of Ngineering and Operational Programs (DEOP), RII A. F. Gibson, Branch Chief, DEOP, RII - - '
D. M. Verrelli, Branch Chief, DPRP, RII ,
C. A. Julian, Chief, Project Section IA, DPRP, RII A. G. Wagner, Senior Resident Inspector, DPRP, RII L. J. Watson, Reactor Engineer, Project Section IA, DPRP, RII A. Schwenzer, Division of Licensing, Office of Nuclear Reactor Regulation Additional members of the NRC staff may attend.
Licensee Attendees: J. P. McGaughy, Vice President-Nuclear Additional MP&L representatives may attend. , .
NOTE: Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 2:00 p.m., November 17, 1983, via telephone call to L. J. Watson, FTS: 242-4299.
Distribution: Victor Stello, Jr. , DEDROGR J. Lieberman, Director, ROED R. DeYoung, Director, IE H. R. Denton, Director, NRR D. Houston, Licensing Project Manager, (Grand Gulf), NRR Region II Distribution List C Receptionist
\
's 8704280085 870423 PDR FOIA REBER85-419 PDR
, -,c -m-, .--v
LV $
SUMMARY
__OF FINDINGS ON OPERATOR QUALIFICATIONS
- f. Approximately 502 of candidates who have taken NRC initial licensing exam i have failed.
l L Essentially no prior BWR operating experience on Grand Gulf staff. Quali fi-cations of GE advisors uncertain. l A Operator requalification training program was not insplemented until April 1983.
Initial NRC exams were given in October 1981.
- 4. MRC evaluation of W&L requal program in August 1983 revealed problems. One cf three operators failed our portion of the exam. Their exams were judged to s he too easy.
1
- 5. Significant weaknesses identified for three of ten operators given walkthru
- evaluations by NRC in early November 1983,
- i. Certifications on qual cards have been found to be inconplete and have apparently not etways been based on proper evaluations.
- 7. Operator weaknesses identified by Grand Gulf exams have not always been corrected.
E. Many deficiencies have been found in the ir.anagement cf the Grand Gulf operator training program.
- The MP&L Training Dept. is understaffed. Current staff includes only two MP&L employees. There has been little oversite or appraisal of Quadrexinstructors by W&L.
- License applications have overstated the amount of training given l t to applicants. .
- Training records are incomplete.
1
1 l
l I
November 11, 1983 Heeting With Mississippi Power and__ Light Areas Discussed:
- 1. Qualification Cards
' - Revised guidance on qual card implementation issued
- Qual card reviewed by shift supervisor (SROS) ,
- Developing NRC style Matrix for signoffs of important attributes
- Matrix includes theory, practical factors, system knowledge, technical specification
- Signoffs to be accomplished by shift supervisors (SROS)
- Two classes: One on training; one on shift
- 2. Relief on Susp_e_nded Licenses
- Issue licenses withheld after completion of qual cards (4 licenses)?
- Reinstate three licenses af ter completion of qual cards / correction of weaknesses?
- 3. St_andards for Acceptable Pe,r_formance
- 4. _ Certification of Board
- After qualification cards are complete, operator Training Evaluation Board will certify training complete and satisfactory performance on oral exam
- MP8L will submit letter stating board certification complete i
B. Feedback of Generik Problems _&, Tra_ining Program __
- - Feedback from operator
- Feedback from review of exams / records
- Tracking of weaknesses to identify generie problems 1 j 6. STA Certification
- 3 STA's on-shift; 3 additional have completed training
~ ~
Meeting with Mississippi Power and Light Page 2
- Review of training to identify weaknesses
- Retraining if necessary
- 7. Shift Advisors
~ - Present advisors have three weeks of system training and h&ve been examined
- MP&L will review exams and retrain in weak areas
- MP&L will review qualifications, purpose and use of shift advisors and make determination of adequate training
- 8. _ Implementation of Practical factors
- Will be accomplished as appropriate in plant or on simulator
- MP&L will review qual cards and identify appropriate locations and how, i.e., walk-thru/ accomplish, the item will be complete
- 9. Documentation
- Short term - all documents retained
- Long term - retain main documents
- Discussed types of documents to be used to adequately show that training is completed
- 10. _ Removal of Operators
- Upon identification of significant weaknesses operator will be relieved of licensed 6.* ties
- MP&L program will address how removal will be accomplished
- 11. lertification of Instructors (Quadrex)
. - Schedule for certification
- Use of instructors prior to certification l
l l
l
l yftS TO BE RESOLVED 1- Unit is presently in Cold Shutdown. At what point should low power operation be resumed? Is power level a consideration for issuance of ifcenses on hold / reinstatement of licenses?
- 7. Can operator licenses be issued / reinstated after the individual has been recertified by MP&L?
J. Operators will be taken off-shift to participate in training program.
Should the OTEC Board certify each individual in training prior to placing that individual back on shift?
4- STA and shift advisor training l