ML20213A570
| ML20213A570 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/20/1987 |
| From: | Stefano J Office of Nuclear Reactor Regulation |
| To: | Sylvia B DETROIT EDISON CO. |
| References | |
| NUDOCS 8702030360 | |
| Download: ML20213A570 (3) | |
Text
e January 20, 1987 DISTRIBUTION:
Docket No. 50-341 ni N 94U NRC POR Local PDR EJwdan Mr. B. Ralph Sylvia BWD-3 r/f ACRS (10)
Group Vice President - Nuclear Operations EAdensam GClainas Detroit Edison Company JStefano EMarinos 6400 North Dixie Highway EHylton Newport, Michigan 48166 Attorney, OGC JPartlow
Dear Mr. Sylvia:
BGrimes
Subject:
Fermi-2 Compliance with the Provisions of 10 CFR 50.49 This is to acknowledge receipt of F. E. Agosti's letter to E. G. Adensam, dated December 12, 1986 (VP-86-0149), advising that the environmental quali-fication of electrical components identified in Section 3.11 of SER Supplement No. 5 were completed as required by November 30, 1985. Subject to confirmatory audit by the NRC regional staff, we agree that your letter satisfies Condition 7.C(6) of the Fermi-2 Operating License No. NPF-43.
Sincerely,
/S/
John J. Stefano, Sr., Project Manager BWR Project Directorate No. 3 Division of BWR Licensing cc: See next page 8702030360 870120 PDR ADOCK 05000341 E
- Note: Previously Concurred IfkY l
BWD-3: DBL LA:BWD-3: DBL D:BWD-3: DBL
- JStefano/vag
- EHylton
- EAdensam 01/20/87 01/20/87 01/20/87
a -
o DISTRIBUTION:
Docket No. 50-341 Docket No. 50-341 NRC PDR Local PDR Mr. B. Ralph Sylvia BWD-3 r/f ACRS (10)
Group Vice President - Nuclear Operations EAdensam GClainas Detroit Edison Company JStefano EMarinos 6400 North Dixie Highway EHylton Newport, Michigan 48166 Attorney, 0GC JPartlow
Dear Mr. Sylvia:
BGrimes
Subject:
Femi-2 Compliance with the Provisions of 10 CFR 50.49 This is to acknowledge receipt of F. E. Agosti's letter to E. G. Adensam, dated December 12, 1986 (VP-86-01491, advising that the environmental cuali-fication of electrical components identified in Section 3.11 of SER Supplement No. 5 were completed as required by November 30, 1985. We agree that this action satisfies Condition 2.C(6) of the Fermi-2 Operating License No. NPF-43.
Sincerely, John J. Stefano, Sr., Project Manager BWR Pro,iect Directorate No. 3 Division of BWR Licensing cc: See next page D-[0-LA;F}WhD I
DBL
- DBL
-3: DBL iStefano/vag EH)1 ton EM am 1/$0/87 01/j#/87 01 87
Mr. B. Ralph Sylvia Detroit Edison Company Fermi-2 Facility cc:
Mr. Harry H. Voigt, Esq.
Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W.
Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq.
Lansing, Michigan 48909 Senior Attorney Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Commission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Steve Frost Supervisor-Licensing Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161
.