Forwards Amend 4 to License NPF-58 & Safety Evaluation. Amend Revises Tech Specs to Require Operable RCIC Sys
ML20213A507
Person / Time
Site: Perry 
Issue date: 04/20/1987
From: Colburn T
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20213A509 List:
References
NUDOCS 8704280051
Download: ML20213A507 (3)


Text

_.

UNITED STATES 8

i NyCLEAR REGULATORY COMMISSION E

p WASHINGTON. D. C. 20555 April 20,1987 Docket No.: 50-440 Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Corpany P. O. Box 5000 Cleveland, Ohio 44101

Dear Mr. Edelman:

SUBJECT:

EMERGENCY CHANGE TO TECH 11 CAL SPECIFICATIONS CONCERNING RCIC INJECTION VALVE OPERATIOi RE:

Perry Nuclear Power Plant, Unit No. 1 The Commission has issued the enclosed Amendment No. 4 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No.1.

This amend-ment consists of temporary changes to the Technical Specifications (TSs) in _

response to your application dated March 9, 1987, as supplemented and amended J

by your letters of March 19, 20, 31 and April 1, 7 and 10, 1987.

The staff authorized the use of these changes by letter dated April 10, 1987.

This amendment requires the reactor core isolation cooling (RCIC) system to be operable with the exception that the RCIC injection valve shall not be capable of automatic opening.

This exception is in effect at power levels limited according to the results of RCIC tests to be conducted upon resumption of plant operation, as set forth in your submittal of April 10, 1987 and it expires on May 31, 1987.

During this period, the provisions of Technical Specification 3.0.4 are not applicable.

We have reviewed the circumstances associated wi9 your request for an exigent Technical Specification change and concluded that the relief provided by this amendment is necessary to permit Perry Unit 1 to continue startup testing and operation in a timely manner. We have also concluded that these circumstances could not have been avoided.

However, the staff's need to obtain additional information for consideration of this action resulted in no reasonable opportunity for public comment prior to March 26, 1987, the expiration date for similar relief which was granted on February 24, 1987.

Therefore, we concluded 1

that a valid emergency existed, as defined in 10 CFR 50.91(a)(5), and your i

application has been processed accordingly.

g2% $[ p P

l

~

w,

'~ -

g 4

,,l

.g m..,

c ;u fAPR 2 01987 '

f

.-.1-

~

.s

.g..,-

~,

r 1' '

,..e r

r b

A' copy of.our-Safety Evaluation.is also enclosed.

Notice of Issuance will=be 5

c

,4

~

  • included-in~the Commission's biweekly Federal Register notice.

l

~

Sincerely,

.."i j~ l

/(//

~

p.

t.

t b

Timothy G. Colburn, Project Manager

]

. Project'. Directorate III.

j Division of Reactor _ Projects - III,lIV, V

.& Special-Projects'-

- Office of Nuclear Reactor Regulation:

Enclosures:

1 i'

1.

Amendment No'. 4 to License No.= NPF-58 1

2.

Safety Evaluation cc w/ enclosures:

See next page

j -

i I

4 1

i:

DISTRIBUTION:

d[ 6

'Woodhead, 0GC NRC PDR.

ARM /LFM8 Local PDR

'TBarnhart (4)

PD31 Grey File EJordan DCrutchfield DHagan

.GHolahan Wanda Jones

[

DCrutchfield RIngram l

MVirgilio

- GPA/ PAL EButcher

'h

[

BGrimes

, JPartlow

?

Pleech 4

TColburn TCollins i.

3-.

m fACRS'(10)-

TMSu l

]

4.

, ]

I T,c j

PD#4/P M [

PD31/PM RIII C.

PD31/D (#

P i.

PD3 LA 1 PLeech:ca TColburn ^

CNoreTius W > ead MJVirgilio.

Holahan

~

.RIngram;

$ / Q/87

  • t /\\b/87

-A/

f[/81; if/(f/87 X ;}{/f /87

.i

.4'/17/87:

\\

Wy e

a f

J,s, i.-,

..~

Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company 4

cc:

Shaw, Pittman, Potts & Trowbridge Mr. James W. Harris, Director 2300 N Street, N.W.

Division of Power Generation Washington, D. C.

20037 Ohio Department of Industrial Relations Post Office Box 825 Donald H. Hauser, Esq.

Columbus, Ohio 43216 The Cleveland Electric Illuminating Company P. O. Box 5000 The Honorable Lawrence Logan Cleveland, Ohio 44101 Mayor, Village of Perry 4203 Harper Street Resident Inspector's Office Perry., Ohio 44081 U. S. Nuclear Regulatory Commission Parmly at Center Road The Honorable Robert V. Orosz Perry, Ohio 44081 Mayor, Village of North Perry i

North Perry Village Hall

~

Regional Administrator, Region III 4778 Lockwood Road U. S. Nuclear Regulatory Commission North Perry Village, Ohio 44081 799 Roosevelt Road i

Glen Ellyn, Illinois 60137 Attorney General 4

Department of Attorney General j

Frank P. Weiss, Esq.

30 East Broad Street Assistant Prosecuting Attorney Columbus, Ohio 43216 105 Main Street Lake County Administration Center Radiological Health Program Painesville, Ohio 44077 Ohio Department of Health 1224 Kinnear Road Ms. Sue Hiatt Columbus, Ohio 43212 OCRE Interim Representative 8275 Munson Mentor, Ohio 44060 Ohio Environmental Protection Agency 361 East Broad Street Terry J. Lodge, Esq.

Columbus, Ohio 43266-0558 618 N. Michigan Street 1-Suite 105 Toledo, Ohio 43624 Mr. James R. Secor, Chairman John G. Cardinal, Esq.

Perry Township Board of Trustees Prosecuting Attorney Box 65 4171 Main Street Ashtabula County Courthouse Perry, Ohio 44081 Jefferson, Ohio 44047 State of Ohio i

Eileen M. Buzzelli Public Utilities Commission The Cleveland Electric 180 East Broad Street i

Illuminating Company Columbus, Ohio 43266-0573 P. O. Box 97 E-210 Perry, Ohio 44081 i

. - - -